Philadelphia

5101 Warren Street, Philadelphia

technical data · neighborhood and transit

Loading map…
5101 Warren Street, PhiladelphiaOpen map

Quick answers

Does 5101 Warren Street have open permits or code violations?
Philadelphia Department of Licenses and Inspections lists 18 permits, 8 not closed, and 58 violations, 9 open.
What is the 2026 conforming loan limit in Philadelphia County?
$832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
Is radon a problem here?
EPA radon zone 1, the highest potential. Test for radon before you buy.
What natural disasters is 5101 Warren Street at risk for?
FEMA's National Risk Index rates the area relatively high overall, with elevated inland flooding and heat wave risk.

Permits and code violations

8 permits not closed out. Unfinished permits pass to the next owner. 9 open violations.

  1. Electrical permit Aug 2026Issued

    Install (1) 125 amp service disconnect and (1) 125 amp mlo panel. install lighting, receptacles, lighting switches and controls, and provide power to equipment as per 2017 nec.

  2. Plumbing permit Jun 2026Issued

    Install (3) lavatories, (3) water closets, (1) tub/shower, (1) laundry sink, (1) mop sink, (1)hot water heater.

  3. Fire suppression permit May 2026Issued

    Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans. relocate 15 sprinkler heads to conform to renovations.

  4. Commercial building permit Jan 2026Issued

    Level ii alterations with partial change of occupancy and interior mezzanine addition to create a boxing gym (personal services) on the first floor of an existing two-story building as per approved plans. existing building fully sprinklered. *2018 iebc review* **separate permits required for mep & fire suppression work**

  5. Zoning permit Jan 2026Issued

    Personal services

  6. Demolition permit Dec 2025Completed

    For the complete demolition of the existing two (2) story masonry structure. all permitted demolition activity to be done in accordance with site safety demolition plan and such plan to be maintained on site at all times. demolition to be done by hand and mechanical methods. protection of pedestrians, public right-of-way, and adjacent properties to be in place prior to start of work. separate streets department approval required for right-of-way encroachment or closure.

  7. Zoning permit Dec 2025Issued

    For the full demolition of one of the structure on the lot. existing single family dwelling with accessory parking garage use to remain. size and location as shown on the plan.

  8. Plumbing permit Sep 2025Completed

    Lateral seal

  9. Zoning permit Sep 2025Issued

    Complete demolition to create vacant lot

  10. Plumbing permit Jul 2025Completed

    Curb trap, main drain & fresh air inlet.

  11. Plumbing permit Jul 2025Completed

    Water connection, 1.5" k-copper water service line.

  12. Fire suppression permit Jun 2025Completed

    Install new fire suppression system complying with nfpa 13 throughout the building to include 4" main fire service line with 4-inch wilkins 350ast backflow preventer and automatic fire suppression system. all work to be done per approved plans. if field conditions vary contact design engineer prior to the start of any work.

Philadelphia Department of Licenses and Inspections

Safety and environment

FEMA natural hazard risk

Relatively High

Highest for this area: inland flooding, heat wave, cold wave. These drive insurance cost here.

FEMA National Risk Index, census tract

Superfund site

3.0 mi

Austin Avenue Radiation Site (Deleted NPL Site). Check groundwater and vapor reports on the EPA site page.

EPA National Priorities List

Leaking fuel tanks

10 within 1,650 ft

Nearest: King Gas Sta, 1501 N 52nd St (1,100 ft), open. 3 still open. Ask whether groundwater or soil vapor testing was done.

EPA UST Finder, leaking underground storage tank releases

Brownfield site

450 ft

Bibleway Church 77 4 3217 00 and 8 more within half a mile. Former industrial land in EPA's cleanup and reuse program.

EPA ACRES Brownfields

Toxic release facility

1,850 ft

Silvi Concrete Of Philadelphia. Reports chemical releases to air, water or land to EPA each year.

EPA Toxics Release Inventory

High-voltage line

700 ft

230 kV line run by PECO ENERGY CO.

HIFLD transmission lines

Radon potential

High

Average indoor levels here can exceed 4 pCi/L, EPA's action level. A $15 test kit settles it before you buy.

EPA and USGS Geologic Radon Potential Map

Nearest public schools

1,300 ft

Mastery CS - Shoemaker Campus (1,300 ft), Heston Edward Sch (1,800 ft), KIPP DuBois CS (1,950 ft). Confirm the assigned school with the district.

U.S. Department of Education, NCES

Major airport

7.2 mi

Philadelphia International (PHL). Aircraft may be audible under approach paths.

FAA large-hub airports

Conforming loan limit 2026

$832,750

Philadelphia County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.

FHFA Conforming Loan Limit Values, one-unit

Sunlight

How the sun hits 5101 Warren Street, Philadelphia

Have you lived here? Share your experience.

Leave a review

The Address Story

Every address has a context. Read its story.

Checking...

How much it costs to live here

Price, rent, mortgage, and the city's economic context, all in one place.

The money at this address

Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.

Estimated monthly rent–
Rent per square foot–
Rent per year–

Enter a rent and the yield calculation fills in on its own.

View sunlight on the mapThe report is free, with a Google account. The PDF also includes the QR code to the sunlight simulation.

Loan calculator for this address

Enter the listing price. The calculation uses only your numbers.

Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.

More on Warren Street

All addresses

Viewing recommendations

What's worth checking in person before deciding.

  • Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
  • Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
  • Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
  • Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
  • Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
  • Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.

Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.

The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.