Philadelphia

4902 Fairmount Avenue, Philadelphia

technical data · neighborhood and transit

Loading map…
4902 Fairmount Avenue, PhiladelphiaOpen map

Permits and code violations

9 permits not closed out. Unfinished permits pass to the next owner. 4 open violations.

  1. Mechanical / fuel gas permit Dec 2025Issued

    Ez permit ductwork & warm-air appliances- for mechanical work to include the installation as per attached standards. deviations from these standards require submission of construction and site plans. replace the existing with the same type, condensing furnace, natural gas, 96% afue, 80,000 btuh, no new ductwork.

  2. Zoning permit Dec 2025Issued

    Residential - household living - two-family

  3. Residential building permit Mar 2023Expired

    Third floor addition with accessory roof deck and pilot house., details as per plan.

  4. General permit minor Aug 2022Expired

    For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall result in permit revocation. a separate permit from the philadelphia department of streets is required for any sidewalk and street closures. all means of pedestrian protection required at the site in accordance with the philadelphia building code chapter 33 shall be in place prior to start of work.

  5. Zoning permit Jan 2022Issued

    For the erection of an addition above an existing attached structure to include roof deck and roof deck access structure. size and location as shown on application/plan.

  6. Residential building permit Aug 2021Completed

    **make safe permit** for repairs to the front porch and rear one (1) story portion of the existing structure to comply with violation case #667451. not exceed scope of work shown on approved plans. separate permits to be obtained for any additional alterations work that are not specifically addressed on case #667451. in accordance with code bulletin pm-1801, a pa professional engineer is required to monitor repairs made under this permit. the engineer must submit a sealed statement to the department confirming that the structure is in sound condition at completion. protection of pedestrians and public right-of-way required at all times. separate streets department approval required for right-of-way encroachment or closure. make safe permit only.

  7. Plumbing permit Jun 2021Expired

    Ez plumbing permit - phdc ez plumbing standards permit - sfd property per attached standard. deviations from this standard will result in permit revocation and require submission of construction plans. structural alteration or repair is expressly prohibited under this permit. prohibited structural work any modifications to exterior walls, party walls, floor/roof framing or foundations, including underpinning, excavation, and removal of foundation slab. this permit is for the alterations approved by the phdc as per work order number: 129358 - second floor bathroom remodel and replace kitchen sink for philadelphia housing development corporation (phdc) for the bsrp repair program. (bsrp) (building permit rp-2021-009532)

  8. Residential building permit Jun 2021Expired

    Ez alt permit standards - phdc ez limited residential alterations standards permit - sfd property per attached standard. deviations from this standard will result in permit revocation and require submission of construction plans. structural alteration or repair is expressly prohibited under this permit. prohibited structural work any modifications to exterior walls, party walls, floor/roof framing or foundations, including underpinning, excavation, and removal of foundation slab. no work may be performed in the basement or cellar. separate permits required for mechanical, electric and plumbing. this permit is for the alterations approved by the phdc as per work order number: 129358 - second floor bathroom remodel for philadelphia housing development corporation (phdc) for the bsrp repair program. (bsrp)

  9. Commercial building permit Sep 2019Expired

    For structural repairs to existing structure as indicated by the plans and engineer report.

  10. General permit minor Aug 2019Expired

    Remove old roof coverings and install new roof coverings***structural alteration or repair is expressly prohibited under this permit. prohibited structural work includes any modification to exterior walls, party walls, floor/roof framing or foundations; underpinning and excavations (i.e. digging in basement)

  11. Alteration permit Oct 2017Completed

    Make safe permit to comply with violation #575999. to repair rear wall as per plans.

  12. Plumbing permit Dec 2012Completed

    Install full water service from street to curb 3/4 water dist (sfd) pa20123480093

Philadelphia Department of Licenses and Inspections

Safety and environment

Major airport

6.4 mi

Philadelphia International (PHL). Aircraft may be audible under approach paths.

FAA large-hub airports

Sunlight

How the sun hits 4902 Fairmount Avenue, Philadelphia

Have you lived here? Share your experience.

Leave a review

The Address Story

Every address has a context. Read its story.

Checking...

How much it costs to live here

Price, rent, mortgage, and the city's economic context, all in one place.

The money at this address

Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.

Estimated monthly rent–
Rent per square foot–
Rent per year–

Enter a rent and the yield calculation fills in on its own.

View sunlight on the mapThe report is free, with a Google account. The PDF also includes the QR code to the sunlight simulation.

Loan calculator for this address

Enter the listing price. The calculation uses only your numbers.

Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.

More on Fairmount Avenue

All addresses

Viewing recommendations

What's worth checking in person before deciding.

  • Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
  • Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
  • Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
  • Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
  • Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
  • Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.

Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.

The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.