Chicago

740 South Federal Street, Chicago

Apartment building

technical data · neighborhood and transit

Loading map…
740 South Federal Street, ChicagoOpen map

Quick answers

Does 740 South Federal Street have open permits or code violations?
Chicago Department of Buildings lists 48 permits, 30 not closed, and 17 violations.
What is the 2026 conforming loan limit in Cook County?
$832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
Is radon a problem here?
EPA radon zone 2, moderate potential.
What natural disasters is 740 South Federal Street at risk for?
FEMA's National Risk Index rates the area relatively high overall, with elevated tornado and inland flooding risk.

Permits and code violations

30 permits not closed out. Unfinished permits pass to the next owner. No open violations.

  1. Permit – express permit program Sep 2026Active

    Scope: roof replacement. area: 12500 sq. ft. roof covering: other. location: roof top. il roofing contractor license: 104003433.

  2. Permit - new construction Jun 2026Active

    Permit expires on 08/25/2026 erection starts: 9/9/2026, erection ends: 9/13/2026. near south planning board lite festcanopy- reinstate 101057850 2 day event (9/12-13/2025)erect one (1) 30x33 (9mx10m) structure, and one (1) 30x66 (9mx20m) structure tent.erect 9/9/2026- remove 9/13/2026assembly

  3. Permit - new construction Aug 2025Suspended

    Permit expires on 10/18/2025 erection starts: 9/5/2025, erection ends: 9/8/2025. near south planning board lite festcanopy- reinstate 101057850 2 day event (9/6-7/2025)erect one (1) 30x33 (9mx10m) structure, and one (1) 30x66 (9mx20m) structure tent.erect 9/5/2025- remove 9/8/2025assembly

  4. Permit – express permit program Oct 2024Active

    Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 0 . lighting outlets: 14. specific location: lobbies of buildings.

  5. Permit - new construction Aug 2024Expired

    Permit expires on 10/19/2024 erection starts: 9/6/2024, erection ends: 9/8/2024. near south planning board lite fest canopy- 2 day event (9/7-8/2024)erect one (1) 30x33 (9mx10m) structure, and one (1) 30x66 (9mx20m) structure tent.erect 9/6/2024- remove 9/8/2024assembly

  6. Permit - new construction Aug 2023Complete

    Permit expires on 10/25/2023 erection starts: 9/8/2023, erection ends: 9/10/2023. near south planning board lit fest canopy- 2 day event (9/9-10/2023)erect one (1) 30x66 (9mx20m) structure tent.erect 9/8/2023- remove 9/10/2023assembly

  7. Permit - new construction Sep 2022Complete

    Permit expires on 11/06/2022 erection starts: 9/8/2022, erection ends: 9/12/2022. tent- self-cert 1 day event 9/10/2022) near south planning board lit fest erect one (1) 30x70 (9mx21m) structure tent. erect 9/8/2022- remove 9/12/2022 assembly ****self certification **** conditional approval **** subject to field inspection **** aor certificate of inspection required ****

  8. Permit - new construction Sep 2021Complete

    Permit expires on 11/02/2021 erection starts: 9/9/2021, erection ends: 9/12/2021. erection starts: 9/9/2021, erection ends: 9/12/2021. tent- self-cert 1 day event 9/11/2021) near south planning board lit fest erect one (1) 30x110 (9mx33m) structure tent. erect 9/9/2021- remove 9/12/2021 assembly **** self certification **** conditional approval **** subject to field inspetion **** aor certificate of inspection required ****

  9. Permit – express permit program May 2021Complete

    Furnish and install (4) receptacles

  10. Permit - easy permit process Oct 2020

    Hot water heater (replacement only): qty 1 by all star plumbing solutions

  11. Permit - easy permit process Oct 2020

    Hot water heater (replacement only): qty 1

  12. Permit - easy permit process Jun 2020

    Complete roof tear off - no structural work

Chicago Department of Buildings

Safety and environment

FEMA natural hazard risk

Relatively High

Highest for this area: tornado, inland flooding, heat wave, cold wave. These drive insurance cost here.

FEMA National Risk Index, census tract

Leaking fuel tanks

18 within 1,650 ft

Nearest: B&B Parking, 633 South La Salle St. (500 ft), open. 4 still open. Ask whether groundwater or soil vapor testing was done.

EPA UST Finder, leaking underground storage tank releases

Radon potential

Moderate

Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.

EPA and USGS Geologic Radon Potential Map

Nearest public schools

550 ft

Jones College Prep High School (550 ft), South Loop Elem School (2,400 ft), Intrinsic 2 Charter High School (2,650 ft). Confirm the assigned school with the district.

U.S. Department of Education, NCES

Major airport

8.7 mi

Chicago Midway (MDW). Aircraft may be audible under approach paths.

FAA large-hub airports

Sinkhole-prone ground

Limestone karst

The bedrock here (dolostone (dolomite), Silurian) can dissolve and open sinkholes. Ask for a geotechnical report and check whether sinkhole coverage is in the insurance policy.

USGS Karst in the United States (OFR 2014-1156)

Conforming loan limit 2026

$832,750

Cook County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.

FHFA Conforming Loan Limit Values, one-unit

Sunlight

How the sun hits 740 South Federal Street, Chicago

Building typeApartment building

Have you lived here? Share your experience.

Leave a review

The Address Story

Every address has a context. Read its story.

Checking...

How much it costs to live here

Price, rent, mortgage, and the city's economic context, all in one place.

The money at this address

Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.

Estimated monthly rent–
Rent per square foot–
Rent per year–

Enter a rent and the yield calculation fills in on its own.

View sunlight on the mapThe report is free, with a Google account. The PDF also includes the QR code to the sunlight simulation.

Loan calculator for this address

Enter the listing price. The calculation uses only your numbers.

Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.

Who lives and works in Chicago

Trading floors, logistics and the deepest architecture stock in America

Chicago carries a full corporate economy at a price the coasts do not match. Neighborhoods are distinct and walkable, two and three flats are everywhere, and the Loop still sets the commute for finance, law and consulting.

$71,673
median household income
18.9%
residents aged 25 to 34
45%
households that own their home

What pays the bills

  • Finance and trading
  • Logistics and rail
  • Law and consulting
  • Healthcare
  • Manufacturing

Who anchors the economy

CME Group · Boeing suppliers · University of Chicago · Northwestern Medicine · United Airlines

The market is shaped around

  • Young professionals
  • Families buying space
  • Two and three flat owners
Read the Chicago city report →

More on South Federal Street

All addresses

Viewing recommendations

What's worth checking in person before deciding.

  • Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
  • Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
  • Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
  • Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
  • Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
  • Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.

Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.