600 South Federal Street, Chicago
technical data · neighborhood and transit
Quick answers
- Does 600 South Federal Street have open permits or code violations?
- Chicago Department of Buildings lists 60 permits, 21 not closed, and 48 violations, 43 open.
- What is the 2026 conforming loan limit in Cook County?
- $832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
- Is radon a problem here?
- EPA radon zone 2, moderate potential.
- What natural disasters is 600 South Federal Street at risk for?
- FEMA's National Risk Index rates the area relatively high overall, with elevated tornado and inland flooding risk.
Permits and code violations
21 permits not closed out. Unfinished permits pass to the next owner. 43 open violations.
- Permit - renovation/alteration Aug 2026Active
Self cert 2019 cbrc: remove and replace existing security turnstiles on ground floor at both the north main entrance and south rear entrance corridor. install new security -circlelock- turnstile and hollow metal egress door at north entrance. install new pairs of hollow metal swing doors at the south corridor with access control hardware. (ib construction., b-business)
- Permit – express permit program Jan 2026Active
Line voltage electrical work. install permanent-not required by code 450 kw fuel gas generator. receptacle outlets: 0 . lighting outlets: 0. specific location: roof top.
- Permit – express permit program Oct 2024Complete
Line voltage electrical work. repair or alter devices on existing circuits. receptacle outlets: 36 . lighting outlets: 36. specific location: suite 400.
- Permit - renovation/alteration Oct 2023Expired
Spr 2019 cbrc - installation, modification, and removal of mechanical and electrical equipment as per plans. no change to occupancy of walls/structure as per plans.
- Permit - scaffolding May 2023
Erect four (4) scaffolds dates 05/18/2023 through 05/18/2024
- Permit - easy permit process Jul 2021
Install one trane 300 ton (temporary) chiller, self contained, air cooled, r134a, located on the street. work to include all piping and accessories.
- Permit - easy permit process Jul 2021
¿all elevations, repair/replace 465 terra cotta units, repair/replace seal cracks 50 linear ft., repair/replace/rebuild brick 100 sq. ft., tuck-point 3000 sq. ft., repair/replace shelf angles 50 linear ft., repair/replace sealant 3000 linear ft., only¿
- Permit - scaffolding May 2021
Erect two (2) scaffold from 05/06/2021 to 05/5/2022.
- Permit - easy permit process Sep 2020
Replace one condensing unit with one, 20 ton, air cooled, remote, r407c, liebert condensing unit, located at grade, and serving the it/storage room.
- Permit – express permit program Sep 2020Complete
**electrical only permit**demo and replace existing equipment and feeders.
- Permit - scaffolding Jul 2020
Erect one(1) scaffold from 07/16/2020 to 07/16/2021.
- Permit - easy permit process Jul 2020
Removal and replacement of private garage concrete and existing waterproofing membrane. non-structural repairs
Chicago Department of Buildings
Safety and environment
FEMA natural hazard risk
Relatively High
Highest for this area: tornado, inland flooding, heat wave, cold wave. These drive insurance cost here.
FEMA National Risk Index, census tract
Leaking fuel tanks
16 within 1,650 ft
Nearest: Metra, La Salle & Harrison (500 ft), open. 2 still open. Ask whether groundwater or soil vapor testing was done.
EPA UST Finder, leaking underground storage tank releases
Historic listing nearby
350 ft
Pontiac Building. Exterior changes can need preservation review; listed buildings can qualify for rehabilitation tax credits.
National Park Service, National Register
Radon potential
Moderate
Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.
EPA and USGS Geologic Radon Potential Map
Nearest public schools
600 ft
Jones College Prep High School (600 ft), Intrinsic 2 Charter High School (2,300 ft), South Loop Elem School (2,800 ft). Confirm the assigned school with the district.
U.S. Department of Education, NCES
Major airport
8.7 mi
Chicago Midway (MDW). Aircraft may be audible under approach paths.
FAA large-hub airports
Sinkhole-prone ground
Limestone karst
The bedrock here (dolostone (dolomite), Silurian) can dissolve and open sinkholes. Ask for a geotechnical report and check whether sinkhole coverage is in the insurance policy.
USGS Karst in the United States (OFR 2014-1156)
Conforming loan limit 2026
$832,750
Cook County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.
FHFA Conforming Loan Limit Values, one-unit
Worked or visited here? Share your experience.
Leave a reviewThe Address Story
Every address has a context. Read its story.
How much it costs to live here
Price, rent, mortgage, and the city's economic context, all in one place.
The money at this address
Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.
Enter a rent and the yield calculation fills in on its own.
Loan calculator for this address
Enter the listing price. The calculation uses only your numbers.
Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.
Who lives and works in Chicago
Trading floors, logistics and the deepest architecture stock in America
Chicago carries a full corporate economy at a price the coasts do not match. Neighborhoods are distinct and walkable, two and three flats are everywhere, and the Loop still sets the commute for finance, law and consulting.
- $71,673
- median household income
- 18.9%
- residents aged 25 to 34
- 45%
- households that own their home
What pays the bills
- Finance and trading
- Logistics and rail
- Law and consulting
- Healthcare
- Manufacturing
Who anchors the economy
CME Group · Boeing suppliers · University of Chicago · Northwestern Medicine · United Airlines
The market is shaped around
- Young professionals
- Families buying space
- Two and three flat owners
More on South Federal Street
All addressesViewing recommendations
What's worth checking in person before deciding.
- Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
- Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
- Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
- Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
- Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
- Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.