Washington

65 Farragut Place Northwest, Washington

Estimated number, map position is approximate

technical data · neighborhood and transit

Loading map…
65 Farragut Place Northwest, WashingtonOpen map

Permits and code violations

11 permits not closed out. Unfinished permits pass to the next owner.

  1. Construction Apr 2026Permit issued

    Remove old roof membrane on main roof and rear mansard and replace with like in-kind membrane

  2. Supplemental Jan 2026Permit issued
  3. Construction Jan 2026Permit issued

    Remove stair to basement & provide 1hr fire separation to create an accessory dwelling unit in the basement. existing hvac units to remain. new electrical mechanical & plumbing as per plans.

  4. Supplemental Aug 2025Permit issued

    Electrical trade permit

  5. Construction Aug 2025Permit issued

    Installation of solar panels on the roof top

  6. Supplemental Jul 2025Permit issued

    Electrical trade permit

  7. Construction Jul 2025Permit issued

    The project scope includes the installation of a 5.16kw dc rated grid-tied photovoltaic system. the installation consists of a railed, roof mounted solar array, inverters and related electrical metering and safty equipment will be installed as required by applicable codes and the local utility company. during daylight hours, this pv system (solar electric) will provide electricity in parallel with the local utility service provider.

  8. Construction Nov 2024Permit issued

    Build new egress opening and stair installation in front porch. change-of-use from single-family to single-family w/ accessory apartment

  9. Construction May 2024Expired

    Remove existing roofing and install new landmark shingles and low slope flat roofing

  10. Construction Mar 2023Expired

    Replace rotted flooring and rusted metal staircase with new pressure treated wood and composite

  11. Supplemental Jan 2023Completed
  12. Construction Oct 2022Completed

    Interior renovation:remove and replace kitchen cabinets, counter tops and appliances. replace kitchen ceramic tiles. replace bathroom fixtures and ceramic tiles on second floor. remove non-bearing walls and install on first and second floor. install insulation and drywall in basement. replace 20 sheets of drywall on first floor and 20 sheetson second floor. finished basement. replace interior doors and trim througout first, second floor and basement. upgrade lighting throughout every level.

DC Department of Buildings

Safety and environment

Major airport

7.0 mi

Reagan National (DCA). Aircraft may be audible under approach paths.

FAA large-hub airports

Sunlight

How the sun hits 65 Farragut Place Northwest, Washington

Have you lived here? Share your experience.

Leave a review

The Address Story

Every address has a context. Read its story.

Checking...

How much it costs to live here

Price, rent, mortgage, and the city's economic context, all in one place.

The money at this address

Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.

Estimated monthly rent–
Rent per square foot–
Rent per year–

Enter a rent and the yield calculation fills in on its own.

View sunlight on the mapThe report is free, with a Google account. The PDF also includes the QR code to the sunlight simulation.

Loan calculator for this address

Enter the listing price. The calculation uses only your numbers.

Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.

More on Farragut Place Northwest

All addresses

Viewing recommendations

What's worth checking in person before deciding.

  • Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
  • Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
  • Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
  • Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
  • Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
  • Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.

Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.

The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.