Washington

223 Rhode Island Avenue Northeast, Washington

House

technical data · neighborhood and transit

Loading map…
223 Rhode Island Avenue Northeast, WashingtonOpen map

Quick answers

Does 223 Rhode Island Avenue Northeast have open permits or code violations?
DC Department of Buildings lists 10 permits, 7 not closed, and 0 violations.
What is the 2026 conforming loan limit in District of Columbia?
$1,249,125 for a single-unit home, per FHFA. Larger loans are jumbo loans.
Is radon a problem here?
EPA radon zone 2, moderate potential.
What natural disasters is 223 Rhode Island Avenue Northeast at risk for?
FEMA's National Risk Index rates the area very low overall, with elevated heat wave risk.

Permits and code violations

7 permits not closed out. Unfinished permits pass to the next owner.

  1. Construction Oct 2026Permit issued

    Update ledger board detail to show ledgerlock screws.

  2. Supplemental Sep 2026Permit issued
  3. Construction Jul 2026Permit issued

    Construct a pressure treated deck of 8'x10' (with 8 steps) with an 11'x10' pressure treated deck on top.

  4. Construction Mar 2025Permit issued

    Tear off and replace underlayment, ice and water, flat roof material, drip edge, flashing, and trim. ice and water on eaves, rake edges, overhangs and valleys.

  5. Construction Apr 2024Permit issued

    Reinforce the existing 2x8 joists at the rear addition with new 2x8 joists by attaching the new joists together (known as sistering) to plan specification and remove the existing sill plate to replace it with a new pressure treated sill plate. structural support for the 1st floor joists over the basement mechanical room. sr&r is to install 2 new adjustable steel posts set on new 16"x16"x12" concrete pier footings with 4000 psi concrete and rebar reinforcement. the posts are to be connected to a new wood beam. the joists are to be connected with simpson joist hangers and sistered to plan specification. structural support for the 2nd floor joists over the dining room. the joists are to be exposed in the area where the duct work has been installed to reinforce the joists with the installation of new 2x8 joists sistered to the existing joists to plan specification. the cut joists are to be connected to a new double section of 2x8 with simpson joist hangers. once the joists have been repaired the drywall is to be reinstalled.

  6. Post card Aug 2023Completed
  7. Supplemental Jul 2023Permit issued

    Electrical trade permit

  8. Construction Jul 2023Permit issued

    The project scope includes the installation of a 6.305 kw dc rated grid-tied photovoltaic system. the installation consists of a railed, roof mounted solar array, inverters and related electrical metering and safety equipment. all equipment will be installed as required by applicable codes and the local utility company. during daylight hours, this pv system (solar electric) will provide electricity in parallel with the local utility service provider.

  9. Post card Apr 2022Completed
  10. Supplemental Apr 2022Completed

DC Department of Buildings

Safety and environment

FEMA natural hazard risk

Very Low

Highest for this area: heat wave. These drive insurance cost here.

FEMA National Risk Index, census tract

Leaking fuel tanks

14 within 1,650 ft

Nearest: 2060 West Virginia Partners, 2116 5th St Ne (800 ft), open. 2 still open. Ask whether groundwater or soil vapor testing was done.

EPA UST Finder, leaking underground storage tank releases

Brownfield site

950 ft

2321 4th Street Property and 1 more within half a mile. Former industrial land in EPA's cleanup and reuse program.

EPA ACRES Brownfields

Toxic release facility

1,050 ft

Fort Myer Construction Plant 1 and 3 more within a mile. Reports chemical releases to air, water or land to EPA each year.

EPA Toxics Release Inventory

Historic listing nearby

300 ft

Metropolitan Apartments. Exterior changes can need preservation review; listed buildings can qualify for rehabilitation tax credits.

National Park Service, National Register

Radon potential

Moderate

Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.

EPA and USGS Geologic Radon Potential Map

Wildfire risk

Very Low

Wildfire risk is low enough that standard home insurance usually covers it.

FEMA National Risk Index

Nearest public schools

1,500 ft

McKinley Technology HS (1,500 ft), McKinley MS (1,500 ft), Harmony DC PCS - School of Excellence (1,500 ft). Confirm the assigned school with the district.

U.S. Department of Education, NCES

Major airport

5.0 mi

Reagan National (DCA). Homes this close can sit inside the 65 dB DNL noise contour. Visit at peak hours and check the airport's noise map.

FAA large-hub airports

Conforming loan limit 2026

$1,249,125

District of Columbia. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.

FHFA Conforming Loan Limit Values, one-unit

Sunlight

How the sun hits 223 Rhode Island Avenue Northeast, Washington

Building typeHouse

Have you lived here? Share your experience.

Leave a review

The Address Story

Every address has a context. Read its story.

Checking...

How much it costs to live here

Price, rent, mortgage, and the city's economic context, all in one place.

The money at this address

Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.

Estimated monthly rent–
Rent per square foot–
Rent per year–

Enter a rent and the yield calculation fills in on its own.

View sunlight on the mapThe report is free, with a Google account. The PDF also includes the QR code to the sunlight simulation.

Loan calculator for this address

Enter the listing price. The calculation uses only your numbers.

Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.

More on Rhode Island Avenue Northeast

All addresses

Viewing recommendations

What's worth checking in person before deciding.

  • This is a house, not an apartment. Check the lot boundaries, car access, and how water drains from the yard after rain, including whether the neighboring lot sits higher and could send water toward the property.
  • Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
  • Ask what heating system is in place (own boiler, wood, gas) and request the last winter month's bills.
  • Check exactly where you'd park: a spot in the yard or garage, or street parking, and how crowded the street gets in the evening.
  • Check the condition of the fence, yard, and sidewalk out front: who is responsible for upkeep, and whether there are any boundary disputes with neighbors.
  • Knock on a neighboring gate and ask about noise, pets, flooding, or other issues common in the area.
  • Schedule a viewing in the evening too, on a weekday, to see street traffic, streetlights, and how quiet the neighborhood is after 8 PM.

Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.