Quick answers

Does 848 North 3rd Street have open permits or code violations?
Philadelphia Department of Licenses and Inspections lists 24 permits, 2 not closed, and 17 violations, 3 open.
What is the 2026 conforming loan limit in Philadelphia County?
$832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
Is radon a problem here?
EPA radon zone 2, moderate potential.
What natural disasters is 848 North 3rd Street at risk for?
FEMA's National Risk Index rates the area relatively moderate overall, with elevated heat wave risk.

Permits and code violations

2 permits not closed out. Unfinished permits pass to the next owner. 3 open violations.

  1. Plumbing permit Aug 2024Expired

    Install new 4" backflow device

  2. Zoning permit May 2023Issued

    Personal services

  3. Electrical permit Mar 2023Completed

    Furnish and install (1) new 200amp single phase panel board with meter socket fed from existing end box for existing retail space. no interior wiring as per 2017 nec

  4. Plumbing permit Nov 2020Completed

    For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall result in permit revocation. a separate permit from the philadelphia department of streets is required for any sidewalk and street closures. all means of pedestrian protection required at the site in accordance with the philadelphia building code chapter 33 shall be in place prior to start of work.

  5. Site / utility permit Mar 2019Completed

    New construction - foundation only permit which includes excavation, footings and foundation walls as per approved plans. separate permits required for all additional work.

  6. Site / utility permit Nov 2018Completed

    New construction: exterior plumbing; aka 854 north third st; stormwater management system as per philadelphia water department (pwd) approved drawings, pwd tracking fy-18-nrds-5015-01- the installation will comply with the philadelphia plumbing code 2004

  7. Demolition permit Oct 2018Completed

    For the complete demolition of the semi-detached one-story and two-story structures by hand, hand held tools and mechanical devices. pedestrian protection to be in place prior to start of work and to maintained during all demolition activities. *seperate streets department permit require for closure of right of way. *21 day posing and notice waived per a-303.2 (subject to a variance) *a covered walkway or sidewalk closure shall be required within in accordance with section 3306 of the ibc.*asbestos remediation required prior to start of work.

  8. Zoning permit Oct 2018Completed

    For the complete demolition of all structures on the lot for the relocation of lot lines to create one(1) lot from seven(7) deeded lots in seven opa ac numbers (854 n 3rd, 302,304,306, 308 poplar, 858,860 n 3rd )..(size and location as shown on the application)

  9. Zoning permit Oct 2018Completed

    For the complete demolition of all structures on the lot for the relocation of lot lines to create one(1) lot from seven(7) deeded lots in seven opa ac numbers (854 n 3rd, 302,304,306, 308 poplar, 858,860 n 3rd )..(size and location as shown on the application)

  10. Zoning permit Oct 2018Completed

    For the complete demolition of all structures on the lot for the relocation of lot lines to create one(1) lot from seven(7) deeded lots in seven opa ac numbers (854 n 3rd, 302,304,306, 308 poplar, 858,860 n 3rd )..(size and location as shown on the application)

  11. Plumbing permit Sep 2018Completed

    Seal lateral remove house trap and hermetically sealing the lateral by a cap or plug per section p-606.1 of the philadelphia plumbing code 2004 - "self-certification's are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection"

  12. Alteration permit Sep 2017Completed

    Tenant fitout for a business use on the first floor with accessory storage in the basement. work includes construction of private office and accessible toilet room on the first floor and non-load bearing partitions in the basement as per plans. separate permits required for m, e, p. new construction permit issued under a/p#587083.

Philadelphia Department of Licenses and Inspections

Safety and environment

FEMA natural hazard risk

Relatively Moderate

Highest for this area: heat wave. These drive insurance cost here.

FEMA National Risk Index, census tract

Superfund site

2.9 mi

Martin Aaron, Inc. (NPL Site). Check groundwater and vapor reports on the EPA site page.

EPA National Priorities List

Leaking fuel tanks

5 within 1,650 ft

Nearest: 801 805 N 2nd St, 801 805 N 2nd St (800 ft), no further action. Every release here is closed by the state regulator.

EPA UST Finder, leaking underground storage tank releases

Brownfield site

800 ft

700 704 N Third Street and 4 more within half a mile. Former industrial land in EPA's cleanup and reuse program.

EPA ACRES Brownfields

Toxic release facility

1,700 ft

American Freight Warehousing Co and 4 more within a mile. Reports chemical releases to air, water or land to EPA each year.

EPA Toxics Release Inventory

Historic listing nearby

250 ft

Ortlieb, Henry F., Company Bottling House and 1 more listings close by. Exterior changes can need preservation review; listed buildings can qualify for rehabilitation tax credits.

National Park Service, National Register

High-voltage line

350 ft

138 kV line run by PECO ENERGY CO.

HIFLD transmission lines

Radon potential

Moderate

Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.

EPA and USGS Geologic Radon Potential Map

Nearest public schools

1,250 ft

Bodine William W HS (1,250 ft), Kearny Gen Philip Sch (1,600 ft), Young Scholars CS (1,900 ft). Confirm the assigned school with the district.

U.S. Department of Education, NCES

Major airport

8.2 mi

Philadelphia International (PHL). Aircraft may be audible under approach paths.

FAA large-hub airports

Conforming loan limit 2026

$832,750

Philadelphia County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.

FHFA Conforming Loan Limit Values, one-unit

Sunlight

How the sun hits 848 North 3rd Street, Philadelphia

Have you lived here? Share your experience.

Leave a review

The Address Story

Every address has a context. Read its story.

Checking...

How much it costs to live here

Price, rent, mortgage, and the city's economic context, all in one place.

The money at this address

Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.

Estimated monthly rent–
Rent per square foot–
Rent per year–

Enter a rent and the yield calculation fills in on its own.

View sunlight on the mapThe report is free, with a Google account. The PDF also includes the QR code to the sunlight simulation.

Loan calculator for this address

Enter the listing price. The calculation uses only your numbers.

Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.

More on North 3rd Street

All addresses

Viewing recommendations

What's worth checking in person before deciding.

  • Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
  • Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
  • Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
  • Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
  • Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
  • Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.

Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.

The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.