- Does 839 Winton Street have open permits or code violations?
- Philadelphia Department of Licenses and Inspections lists 37 permits, 3 not closed, and 60 violations, 7 open.
- What is the 2026 conforming loan limit in Philadelphia County?
- $832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
- Is radon a problem here?
- EPA radon zone 2, moderate potential.
- What natural disasters is 839 Winton Street at risk for?
- FEMA's National Risk Index rates the area relatively high overall, with elevated inland flooding and heat wave risk.
Permits and code violations
3 permits not closed out. Unfinished permits pass to the next owner. 7 open violations.
- Plumbing permit Jun 2026Completed
Repair/replace curb trap.
- Electrical permit May 2024Completed
200amp panel x1 15 amp afci circuit x7 20 amp afci circuit x13 15 amp duplex x15 20 amp duplex x5 light switch x7 3way light switch x4 light fixture x9 door light x1 lamp holder x3 smoke & carbon monoxide detector x3 smoke detector x3 fish only per 2017 nec
- Site / utility permit Apr 2024Completed
Site / utility permit for rp-2023-007506
- Plumbing permit Apr 2024Completed
Replace interior drain, stack & yard drain. sewage ejection pit with bathroom group, sump pit and pump, washing machine box (laundry sink), half bath 1st floor, ks, bathroom group 2nd floor.
- Mechanical / fuel gas permit Apr 2024Completed
Ez permit ductwork & warm-air appliances - for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site plans. install new 92% 80k btu furnace, 3.5 ton ac, ductwork, and 11 diffusers.
- Zoning permit Mar 2024Issued
For the erection of one-story addition above the existing second floor of an attached structure with eight feet (8 ft) front setback (above 2nd floor) and accessory roof deck (for residential use only) with roof access structure. size and location as shown in the application / plan.
- Electrical permit Mar 2024Completed
Electrical installation for home renovation. -installation of electrical wiring, receptacles, fixtures, and devices (non decor switches, and receptacles). -install electrical service equipment 200 amp meter socket, panel, and service cable. -wafer lights to be installed. -no electrical appliances to be installed; such as electric range, dryer, water heater, fireplace. -#14 awg and #12 awg wiring, devices, circuits to be installed as per 2017 nec.
- Residential building permit Jan 2024Completed
For the erection of a rear addition, for underpinning to lower basement floor slab and for level 3 alterations to th existing structure as per plans.
- Zoning permit Dec 2023Completed
For the erection of additon at the rear of existing attached structure. size and location as shown in the application/plans.
- Plumbing permit Nov 2023Completed
Replace curb trap fai
- Electrical permit Mar 2023Completed
Install 200amp service, wiring throughout, install outlets, switches, smoke detectors, grounding system as per 2017 nec
- Mechanical / fuel gas permit Feb 2023Completed
Ez permit ductwork & warm-air appliances- for mechanical work to include the installation as per attached standards. deviations from these standards require submission of construction and site plans. (rp-2021-011229) ductwork (2) 92% efficiency gas furnace 60,000 btu (2) coil 2,5 ton (2) ac unit 14 seer 2,5 ton
Philadelphia Department of Licenses and Inspections
Safety and environment
FEMA natural hazard risk
Relatively High
Highest for this area: inland flooding, heat wave, cold wave, winter weather. These drive insurance cost here.
FEMA National Risk Index, census tract
Superfund site
1.7 mi
Publicker Industries Inc. (Deleted NPL Site). Check groundwater and vapor reports on the EPA site page.
EPA National Priorities List
Leaking fuel tanks
3 within 1,650 ft
Nearest: Walt Whitman Bridge, Drpa Administration Building (200 ft), no further action. Every release here is closed by the state regulator.
EPA UST Finder, leaking underground storage tank releases
Brownfield site
1,400 ft
Growing Home Garden. Former industrial land in EPA's cleanup and reuse program.
EPA ACRES Brownfields
Toxic release facility
3,900 ft
Catalyst International Gasket Materials Corp and 4 more within a mile. Reports chemical releases to air, water or land to EPA each year.
EPA Toxics Release Inventory
Radon potential
Moderate
Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.
EPA and USGS Geologic Radon Potential Map
Nearest public schools
650 ft
Key Francis Scott Sch (650 ft), Southwark Sch (1,300 ft), South Philadelphia HS (2,050 ft). Confirm the assigned school with the district.
U.S. Department of Education, NCES
Major airport
5.5 mi
Philadelphia International (PHL). Aircraft may be audible under approach paths.
FAA large-hub airports
Conforming loan limit 2026
$832,750
Philadelphia County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.
FHFA Conforming Loan Limit Values, one-unit
Have you lived here? Share your experience.
Leave a reviewThe Address Story
Every address has a context. Read its story.
How much it costs to live here
Price, rent, mortgage, and the city's economic context, all in one place.
The money at this address
Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.
Enter a rent and the yield calculation fills in on its own.
Loan calculator for this address
Enter the listing price. The calculation uses only your numbers.
Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.
More on Winton Street
All addressesViewing recommendations
What's worth checking in person before deciding.
- Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
- Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
- Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
- Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
- Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
- Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.
The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.