Philadelphia

839 North 50th Street, Philadelphia

technical data · neighborhood and transit

Loading map…
839 North 50th Street, PhiladelphiaOpen map

Permits and code violations

10 permits not closed out. Unfinished permits pass to the next owner. 4 open violations.

  1. Administrative permit May 2026Completed

    For the certificate of occupancy for the use of child day care (e occupancy) on the first floor of an existing building. no work is permitted under this permit.

  2. General permit Feb 2025Expired

    For the installation of solar panels and related appurtenances as noted on the approved plan. all work to be done per approved plans. if field conditions vary contact design engineer prior to the start of any work. separate permits required for all other work. *separate electrical permit required*

  3. Electrical permit Dec 2024Expired

    Installation of rooftop-mounted 6.56kw solar photovoltaic pv system, consisting of (16) solar photovoltaic modules according to the 2017 nec and per plans.

  4. Zoning permit Nov 2024Issued

    For the erection of roof mounted solar collector panels on an existing two-story structure, size and location as shown on the plan. note: plan approved for solar panel installation only, no building addition or changes included.

  5. Zoning permit Dec 2023Issued

    Child care - child care center

  6. Electrical permit Dec 2023Completed

    Install 300a service w/3gang meter, complete wiring to include all emergency lighting, 110v interconnected smoke alarms,receptacles in daycare space to be tamper-resistant. install complete fire alarm system w/ low frequency sound in all living rooms and bedrooms,residential tenants load center to be a 90a mcb panel w/ a 100a mcb in meter-bank,. all work is to be done according to approved drawings-2017 nec, 2016 nfpa-72, 2018 phila fire code.

  7. Mechanical / fuel gas permit Nov 2023Completed

    For the installation of a fule gas piping and a new hvac system including mechanical appliances, registers and diffusers with all associated ductwork and accessories as per plans.

  8. Electrical permit Sep 2023Cancelled

    Installation of solar array in accordance with signed standard.

  9. Plumbing permit Sep 2023Completed

    Plumbing as noted per plans.

  10. Plumbing permit May 2023Completed

    Repair/replace ct & fai

  11. Commercial building permit Apr 2023Completed

    Interior ant exterior alteration to an existing structure. all work to be done per approved plans and in accordance with 2018 iebc and 2009 icc / ansi a117.1 standard. separate permits to be obtained for all other work. if site conditions vary, contact design professional prior to start of work. 10/11/2023 amendment: amend original permit for the basement framing plan. all work to be done per approved plans and in accordance with 2018 iebc and 2009 icc / ansi a117.1 standard. separate permits to be obtained for all other work. if site conditions vary, contact design professional prior to start of work.

  12. General permit minor Dec 2022Completed

    For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall result in permit revocation. a separate permit from the philadelphia department of streets is required for any sidewalk and street closures. all means of pedestrian protection required at the site in accordance with the philadelphia building code chapter 33 shall be in place prior to start of work.

Philadelphia Department of Licenses and Inspections

Safety and environment

Major airport

6.6 mi

Philadelphia International (PHL). Aircraft may be audible under approach paths.

FAA large-hub airports

Sunlight

How the sun hits 839 North 50th Street, Philadelphia

Have you lived here? Share your experience.

Leave a review

The Address Story

Every address has a context. Read its story.

Checking...

How much it costs to live here

Price, rent, mortgage, and the city's economic context, all in one place.

The money at this address

Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.

Estimated monthly rent–
Rent per square foot–
Rent per year–

Enter a rent and the yield calculation fills in on its own.

View sunlight on the mapThe report is free, with a Google account. The PDF also includes the QR code to the sunlight simulation.

Loan calculator for this address

Enter the listing price. The calculation uses only your numbers.

Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.

More on North 50th Street

All addresses

Viewing recommendations

What's worth checking in person before deciding.

  • Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
  • Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
  • Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
  • Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
  • Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
  • Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.

Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.

The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.