Philadelphia

808 North Uber Street, Philadelphia

technical data · neighborhood and transit

Loading map…
808 North Uber Street, PhiladelphiaOpen map

Quick answers

Does 808 North Uber Street have open permits or code violations?
Philadelphia Department of Licenses and Inspections lists 36 permits, 3 not closed, and 11 violations, 1 open.
What is the 2026 conforming loan limit in Philadelphia County?
$832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
Is radon a problem here?
EPA radon zone 2, moderate potential.
What natural disasters is 808 North Uber Street at risk for?
FEMA's National Risk Index rates the area relatively moderate overall, with elevated inland flooding and heat wave risk.

Permits and code violations

3 permits not closed out. Unfinished permits pass to the next owner. 1 open violation.

  1. Zoning permit Aug 2024Issued

    Limited lodging

  2. Zoning permit Jun 2024Issued

    For the erection of a rear deck at the second story level of an existing attached structure. size and location as shown on plan.

  3. Zoning permit Jun 2024Issued

    For the erection of a rear deck at the second story level of an existing attached structure. size and location as shown on plan.

  4. Mechanical / fuel gas permit Feb 2021Completed

    For the installation of a new hvac system including 6 systems, 2 ton, 800 cfm, 40,000 btu for each of them. 42 registers and the condenser will be placed in the rear yard. with duct work as per plans.

  5. Plumbing permit Nov 2020Completed

    Install curb trap, vent, house drain and 2" water service ppc 2018

  6. Plumbing permit Sep 2020Completed

    Pipe in for 6 units, 18 bathrooms, 6 kitchen sinks, 6 washer boxes

  7. Electrical permit Aug 2020Completed

    New 600 amp service, 7 gang meter bank, (4) 150 amp panels, (2) 125 amp panels (1) 100 amp house panel, wiring (6) units throughout lights, switches, receptacles,hvac equipment, . install a new fire alarm system throughout as per the 2017 nec & 2016 nfpa-72.

  8. Fire suppression permit Aug 2019Completed

    For the installation of an automatic wet sprinkler system throughout a four (4) story multi-family structure with basement in accordance with nfpa 13 to include a new two (2) inch fire service line and a new two (2) inch backflow prevention device as per approved plans. all work shall be performed by a fire suppression contractor licensed by the city of philadelphia.

  9. Plumbing permit May 2019Completed

    1.5 water service complete, curb trap, fai & house drain pa20191203845 "self-certification's are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection"

  10. Fire suppression permit Mar 2019Completed

    For the installation of an automatic fire suppression system in accordance with nfpa 13 throughout new three story buidling with five dwelling units to include new backflow prevention assembly and 2-inch fire service line as per approved plans.

  11. Plumbing permit Mar 2019Completed

    Install 1 1/2" water service main to meter install 6" curb trap and fai install 4" main drain

  12. Zoning/use permit Feb 2019Completed

    For the erection of an addition(rear deck) to an existing attached structure. size and location as shown in the application/plan. for use as a previously approved multi-family (six (6) dwelling units) household living.

Philadelphia Department of Licenses and Inspections

Safety and environment

FEMA natural hazard risk

Relatively Moderate

Highest for this area: inland flooding, heat wave. These drive insurance cost here.

FEMA National Risk Index, census tract

Leaking fuel tanks

3 within 1,650 ft

Nearest: Amoco Sta Phila Ridge Ave, 1840 Ridge Ave (1,300 ft), open. 2 still open. Ask whether groundwater or soil vapor testing was done.

EPA UST Finder, leaking underground storage tank releases

Brownfield site

450 ft

835 87 N 19th Street 1825 Wylie Street and 1 more within half a mile. Former industrial land in EPA's cleanup and reuse program.

EPA ACRES Brownfields

Toxic release facility

3,050 ft

Smithkline Beecham Pharmaceuticals. Reports chemical releases to air, water or land to EPA each year.

EPA Toxics Release Inventory

High-voltage line

650 ft

138 kV line run by PECO ENERGY CO.

HIFLD transmission lines

Radon potential

Moderate

Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.

EPA and USGS Geologic Radon Potential Map

Nearest public schools

1,250 ft

Bache-Martin Sch (1,250 ft), Waring Laura W Sch (1,750 ft), Franklin LC (2,300 ft). Confirm the assigned school with the district.

U.S. Department of Education, NCES

Major airport

7.7 mi

Philadelphia International (PHL). Aircraft may be audible under approach paths.

FAA large-hub airports

Conforming loan limit 2026

$832,750

Philadelphia County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.

FHFA Conforming Loan Limit Values, one-unit

Sunlight

How the sun hits 808 North Uber Street, Philadelphia

Have you lived here? Share your experience.

Leave a review

The Address Story

Every address has a context. Read its story.

Checking...

How much it costs to live here

Price, rent, mortgage, and the city's economic context, all in one place.

The money at this address

Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.

Estimated monthly rent–
Rent per square foot–
Rent per year–

Enter a rent and the yield calculation fills in on its own.

View sunlight on the mapThe report is free, with a Google account. The PDF also includes the QR code to the sunlight simulation.

Loan calculator for this address

Enter the listing price. The calculation uses only your numbers.

Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.

More on North Uber Street

All addresses

Viewing recommendations

What's worth checking in person before deciding.

  • Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
  • Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
  • Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
  • Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
  • Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
  • Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.

Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.

The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.