Philadelphia

801 Arch Street, Philadelphia

technical data · neighborhood and transit

Loading map…
801 Arch Street, PhiladelphiaOpen map

Quick answers

Does 801 Arch Street have open permits or code violations?
Philadelphia Department of Licenses and Inspections lists 60 permits, 7 not closed, and 19 violations, 7 open.
What is the 2026 conforming loan limit in Philadelphia County?
$832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
Is radon a problem here?
EPA radon zone 2, moderate potential.
What natural disasters is 801 Arch Street at risk for?
FEMA's National Risk Index rates the area relatively moderate overall, with elevated heat wave and cold wave risk.

Permits and code violations

7 permits not closed out. Unfinished permits pass to the next owner. 7 open violations.

  1. Mechanical / fuel gas permit Mar 2026Completed

    For the installation of appliances to be installed in accordance with the manufacturer’s specifications. for use as previously approved. all work to be done per approved plans. if field conditions vary contact design engineer prior to the start of any work. separate permits to be obtained for all other work.

  2. Plumbing permit Feb 2026Completed

    Renovate existing space with new sinks all work to be performed in strict compliance with 2018 ppc and plumbing ez standard.

  3. Electrical permit Feb 2026Completed

    Installation of power, lighting and new branch circuits

  4. Fire suppression permit Feb 2026Completed

    Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans. relocate 10 sprinklers for new bakery layout

  5. Commercial building permit Feb 2026Completed

    For level ii interior alterations (new bakery tenant fit-out) without a change in previously approved use and occupancy classification (group b take-out restaurant) in suite #101 at the 1st floor. existing building is fully sprinklered. all work to be done per approved plans and in accordance with 2018 iebc. separate permits required for mechanical, electrical, plumbing, and fire suppression work.

  6. Electrical permit Jan 2025Completed

    Adding monitor module to connect fire suppression system to fire alarm panel.

  7. Fire suppression permit Oct 2024Issued

    Ez kitchen fire suppression- for the installation of new wet chemical kitchen fire suppression system as per attached standard. deviations from these standards require submission of construction and site plans. installation of two pre-engineered ansul r-102 kitchen fire suppression systems.

  8. Plumbing permit Jul 2024Issued

    Install 1 mop sink, 1 lavatory, 1 water closet, 1 hub drain, 2 floor drain, 1 floor sink, 1 grease interceptor, 1 hot water heater, 1 three compartment sink and 2 hand sinks according to the 2018 ppc and per plans.

  9. General permit Apr 2024Completed

    For the erection of one (1) accessory flatwall sign as per plans. separate permit required for electrical work.

  10. Zoning permit Apr 2024Completed

    For erection of one (1) illuminated flat wall sign on existing structure. size and location as shown on the application / plan.

  11. General permit Apr 2024Completed

    For the installation of one (1) non-illuminated flat wall sign per approved plans.

  12. Mechanical / fuel gas permit Mar 2024Issued

    Mechanical / fuel gas permit for combo cp-2023-003232

Philadelphia Department of Licenses and Inspections

Safety and environment

FEMA natural hazard risk

Relatively Moderate

Highest for this area: heat wave, cold wave. These drive insurance cost here.

FEMA National Risk Index, census tract

Superfund site

2.6 mi

Martin Aaron, Inc. (NPL Site). Check groundwater and vapor reports on the EPA site page.

EPA National Priorities List

Leaking fuel tanks

8 within 1,650 ft

Nearest: Greyhound Lines, 1001 Filbert St (1,000 ft), open. 1 still open. Ask whether groundwater or soil vapor testing was done.

EPA UST Finder, leaking underground storage tank releases

Toxic release facility

1,450 ft

U S Department Of The Treasury U S Mint At Philadelphia and 3 more within a mile. Reports chemical releases to air, water or land to EPA each year.

EPA Toxics Release Inventory

Radon potential

Moderate

Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.

EPA and USGS Geologic Radon Potential Map

Nearest public schools

1,250 ft

National Constitution Center HS (1,250 ft), Folk Arts-Cultural Treasures CS (2,100 ft), Mastery CHS-Lenfest Campus (2,250 ft). Confirm the assigned school with the district.

U.S. Department of Education, NCES

Major airport

7.3 mi

Philadelphia International (PHL). Aircraft may be audible under approach paths.

FAA large-hub airports

Conforming loan limit 2026

$832,750

Philadelphia County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.

FHFA Conforming Loan Limit Values, one-unit

Sunlight

How the sun hits 801 Arch Street, Philadelphia

Have you lived here? Share your experience.

Leave a review

The Address Story

Every address has a context. Read its story.

Checking...

How much it costs to live here

Price, rent, mortgage, and the city's economic context, all in one place.

The money at this address

Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.

Estimated monthly rent–
Rent per square foot–
Rent per year–

Enter a rent and the yield calculation fills in on its own.

View sunlight on the mapThe report is free, with a Google account. The PDF also includes the QR code to the sunlight simulation.

Loan calculator for this address

Enter the listing price. The calculation uses only your numbers.

Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.

More on Arch Street

All addresses

Viewing recommendations

What's worth checking in person before deciding.

  • Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
  • Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
  • Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
  • Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
  • Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
  • Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.

Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.

The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.