7537 Valley Avenue, Philadelphia
technical data · neighborhood and transit
Permits and code violations
Every permit on file is closed out. No open violations.
- Electrical permit Mar 2024Completed
Install 200 amp electrical service, meter socket and circuit breaker panel with proper grounding. relocate switch according to the 2017 nec.
- Plumbing permit May 2020Completed
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall result in permit revocation. a separate permit from the philadelphia department of streets is required for any sidewalk and street closures. all means of pedestrian protection required at the site in accordance with the philadelphia building code chapter 33 shall be in place prior to start of work. replace curb trap
- Electrical permit Oct 2014Completed
Rewire kitchen as per nec 2008 (sfd)
- Alteration permit Aug 2014Completed
200 square feet of interior alterations - single family dwelling - applicant agrees to limit the construction to comply with ez permit standard for interior alterations, dated jan 2011. deviations from this standard will result in the revocation of this permit and imposition of further penalties. permit issued to resident homeowner. separate permits required for plumbing, electric and hvac. call inspector at district office at least 24 hours prior to starting work.
Philadelphia Department of Licenses and Inspections
Have you lived here? Share your experience.
Leave a reviewThe Address Story
Every address has a context. Read its story.
How much it costs to live here
Price, rent, mortgage, and the city's economic context, all in one place.
The money at this address
Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.
Enter a rent and the yield calculation fills in on its own.
Loan calculator for this address
Enter the listing price. The calculation uses only your numbers.
Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.
More on Valley Avenue
All addressesViewing recommendations
What's worth checking in person before deciding.
- Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
- Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
- Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
- Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
- Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
- Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.
The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.