Philadelphia

638 West Luzerne Street, Philadelphia

technical data · neighborhood and transit

Loading map…
638 West Luzerne Street, PhiladelphiaOpen map

Quick answers

Does 638 West Luzerne Street have open permits or code violations?
Philadelphia Department of Licenses and Inspections lists 9 permits, 4 not closed, and 15 violations.
What is the 2026 conforming loan limit in Philadelphia County?
$832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
Is radon a problem here?
EPA radon zone 2, moderate potential.
What natural disasters is 638 West Luzerne Street at risk for?
FEMA's National Risk Index rates the area relatively moderate overall, with elevated heat wave and cold wave risk.

Permits and code violations

4 permits not closed out. Unfinished permits pass to the next owner. No open violations.

  1. Zoning permit Jun 2026Issued

    Residential - household living - multi-family

  2. Plumbing permit Jan 2024Expired

    Repair vent pipe

  3. Electrical permit May 2021Expired

    Total rewire with 100 amp service. install all switches, outlets, and light fixtures smoke and carbon monoxide detectors as per nec codes 2014

  4. Residential building permit Feb 2021Expired

    Insulate 2nd floor ceiling drywall and paint 2nd floor ceiling paint interior install new kitchen cabinet and counters

  5. Residential building permit Nov 2020Completed

    Make safe permit - for (make safe per attached engineers report - sister one joist, remove & replace fire-damaged sheathing to the bay window, porch roof, and hole in the second floor roof. remove and replace fire-damaged gwb. reset loose chimney bricks.) to resolve case #cf-2020-065151. abutting sidewalk must be closed with fencing a minimum of 6? in height. separate streets department permit required for sidewalk closure. a separate permit is required for any additional alterations that are not specifically addressed on case #cf-2020-065151. in accordance with code bulletin pm-1801, a pa professional engineer is required to monitor repairs made under this permit. the engineer must submit a sealed statement to the department confirming that the structure is in sound condition at completion.?

  6. Use permit Mar 2019Completed

    Use to accessory parking on the vacant lot of the existing church per plan with all other previously approved uses. *no sign permit on this application*

  7. Use permit Aug 2017Completed

    Family daycare for maximum six (6) children for periods of less than twenty four (24) consecutive hours with accessory preparing and serving food. incidental to and part of a single family dwelling. operator of family daycare must reside in dwelling unit. no sign on this permit

  8. Plumbing permit Aug 2016Completed

    Install curb trap back, 3/4" water service, front rain conductor, main drain and fai-pa1#20162361677-"self-certification's are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection"

  9. Alteration permit Mar 2012Completed

    Remove and replace water damaged sheetrock ceilings; insulate as needed prior to installing rock. applicant agrees to limit the construction to comply with ez permit standard for interior alterations, dated january 1, 2011. deviation from the standard will result in revocation of this permit and imposition of further penalties.

Philadelphia Department of Licenses and Inspections

Safety and environment

FEMA natural hazard risk

Relatively Moderate

Highest for this area: heat wave, cold wave, winter weather. These drive insurance cost here.

FEMA National Risk Index, census tract

Leaking fuel tanks

3 within 1,650 ft

Nearest: Septa Luzerne Depot, 3900 N 10th St (1,200 ft), open. 2 still open. Ask whether groundwater or soil vapor testing was done.

EPA UST Finder, leaking underground storage tank releases

High-voltage line

900 ft

230 kV line run by PECO ENERGY CO.

HIFLD transmission lines

Radon potential

Moderate

Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.

EPA and USGS Geologic Radon Potential Map

Nearest public schools

1,100 ft

McClure Alexander K Sch (1,100 ft), Taylor Bayard Sch (1,900 ft), Esperanza Academy CS (1,950 ft). Confirm the assigned school with the district.

U.S. Department of Education, NCES

Conforming loan limit 2026

$832,750

Philadelphia County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.

FHFA Conforming Loan Limit Values, one-unit

Sunlight

How the sun hits 638 West Luzerne Street, Philadelphia

Have you lived here? Share your experience.

Leave a review

The Address Story

Every address has a context. Read its story.

Checking...

How much it costs to live here

Price, rent, mortgage, and the city's economic context, all in one place.

The money at this address

Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.

Estimated monthly rent–
Rent per square foot–
Rent per year–

Enter a rent and the yield calculation fills in on its own.

View sunlight on the mapThe report is free, with a Google account. The PDF also includes the QR code to the sunlight simulation.

Loan calculator for this address

Enter the listing price. The calculation uses only your numbers.

Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.

More on West Luzerne Street

All addresses

Viewing recommendations

What's worth checking in person before deciding.

  • Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
  • Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
  • Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
  • Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
  • Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
  • Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.

Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.

The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.