Philadelphia

623 South 4th Street, Philadelphia

technical data · neighborhood and transit

Loading map…
623 South 4th Street, PhiladelphiaOpen map

Permits and code violations

11 permits not closed out. Unfinished permits pass to the next owner. 11 open violations.

  1. Plumbing permit Oct 2026Issued

    Curb trap, fai - approved plumbing repair work per ez permit standard for plumbing

  2. Zoning permit Jun 2026Issued

    For the erection of an addition (w/roof deck accessed by pilot house enclosing access stairs only), to an existing attached structure, size and location as shown on plan/application.

  3. Plumbing permit Apr 2026Completed

    Alterations to existing prepared food shop. interior installation of drainage, waste, vent, and water supply for listed fixtures. all materials shall be metallic to roof extension. venting to be designed and installed in accordance with section 919 philadelphia single stack vent system. all work to be installed in strict compliance with 2018 ppc and approved plans

  4. Electrical permit Jan 2026Completed

    Run 1 line for countertop outlets, and also a 20 amp line for appliance circuit. fishing wiring only

  5. Commercial building permit Dec 2025Completed

    For level ii alterations to an existing attached structure. alterations to include partial demo and the erection of partition walls, provide finishes/furnishings and accessibility improvements throughout. for use as eating and drinking establishment-prepared food shop. all work to be done per approved plans. ***************** separate permits to be obtained for all other work. ******************************************

  6. Commercial building permit Nov 2025Completed

    For level ii interior alterations for the change of occupancy at the third floor to be single family dwelling (r3 occupancy) with an existing sit-down restaurant use on first floor and dining/ dancing on the second floor in an existing building. all work to be done per approved plans. if field conditions vary contact design engineer prior to the start of any work. separate permits to be obtained for all other work.

  7. Zoning permit Sep 2025Issued

    Eating and drinking establishments - prepared food shop

  8. Zoning permit Sep 2025Issued

    Residential - household living - single-family

  9. Plumbing permit Nov 2024Completed

    Replace curb trap, fai, and main drain

  10. Plumbing permit Dec 2023Completed

    Repair/replace ct & fai.

  11. Electrical permit Mar 2023Completed

    Replace outdated 100a electrical sub-panel for store (missing cover) with new 100a m.l. panel. existing 100a disconnect to remain as per 2017 nec

  12. Zoning permit Feb 2023Issued

    Limited lodging

Philadelphia Department of Licenses and Inspections

Safety and environment

Major airport

6.8 mi

Philadelphia International (PHL). Aircraft may be audible under approach paths.

FAA large-hub airports

Sunlight

How the sun hits 623 South 4th Street, Philadelphia

Have you lived here? Share your experience.

Leave a review

The Address Story

Every address has a context. Read its story.

Checking...

How much it costs to live here

Price, rent, mortgage, and the city's economic context, all in one place.

The money at this address

Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.

Estimated monthly rent–
Rent per square foot–
Rent per year–

Enter a rent and the yield calculation fills in on its own.

View sunlight on the mapThe report is free, with a Google account. The PDF also includes the QR code to the sunlight simulation.

Loan calculator for this address

Enter the listing price. The calculation uses only your numbers.

Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.

More on South 4th Street

All addresses

Viewing recommendations

What's worth checking in person before deciding.

  • Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
  • Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
  • Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
  • Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
  • Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
  • Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.

Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.

The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.