5014 Newhall Street, Philadelphia
technical data · neighborhood and transit
Quick answers
- Does 5014 Newhall Street have open permits or code violations?
- Philadelphia Department of Licenses and Inspections lists 20 permits, 10 not closed, and 58 violations, 5 open.
- What is the 2026 conforming loan limit in Philadelphia County?
- $832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
- Is radon a problem here?
- EPA radon zone 1, the highest potential. Test for radon before you buy.
- What natural disasters is 5014 Newhall Street at risk for?
- FEMA's National Risk Index rates the area relatively moderate overall, with elevated heat wave and cold wave risk.
Permits and code violations
10 permits not closed out. Unfinished permits pass to the next owner. 5 open violations.
- Fire suppression permit Jan 2026Issued
For installation of a two-inch fire service line, two-inch backflow preventer and fire sprinkler system in accordance with approved plans, hydraulic calculations and nfpa 13.
- Mechanical / fuel gas permit Jan 2026Completed
For the installation of appliances to be installed in accordance with the manufacturer’s specifications. for use as previously approved. all work to be done per approved plans. if field conditions vary contact design engineer prior to the start of any work. separate permits to be obtained for all other work.
- Electrical permit Dec 2025Completed
Complete rewire throughout. install a new 400 amps service and grounding, lighting, receptacles, smoke/co alarms, and power to equipment as per 2017 nec.
- Plumbing permit Apr 2025Issued
Renovation of an existing residential triplex fixture replacements only without piping of existing 3 water closets, 3 lavatory sinks, 3 bathtubs , 3 clothes washers, 3 kitchen sinks, and 3 hot water heaters
- Commercial building permit Mar 2025Issued
For level iii alterations and addition to an existing apartment building (r-2 occupancy, va construction classification) with three (3) dwelling units, alterations to include structural repairs, the erection of an addiiton, roof deck (accessed from the 3rd floor), partition walls, provide finishes/furnishings and accessibility improvements throughout. building to be fully sprinklered in accordance with nfpa 13. all work to be done per approved plans. if field conditions vary contact design engineer prior to the start of any work. separate permits to be obtained for all other work. **no more than 2/3 of all structural framing members may be removed/replaced under this permit** **amendment (7-15-2026) for compliant changes to rear accessible ramp as per the approved amended construction documents (changes in revision clouds)
- Zoning permit Feb 2025Issued
For the erection of an addition at the rear and roof deck above existing two story portion of semi-detached structure. size and location as shown in plan.
- Commercial building permit Nov 2024Completed
**make safe permit** for replacement of exterior walls and joist to comply with violation case #cf-2024-100861. not to exceed scope of work noted in engineer's report and shown on approved plans. separate permits required for any additional alterations that are not specifically addressed on the violations. in accordance with code bulletin pm-1801, a pa professional engineer is required to monitor repairs made under this permit. the engineer must submit a sealed statement to the department confirming that the structure is in sound condition at completion.
- Zoning permit Sep 2024Issued
For the erection of an addition at the rear and roof deck above existing two story portion of semi-detached structure. size and location as shown in plan.
- Zoning permit Apr 2024Issued
For the erection of a rear roof deck accessed from rear of 3rd floor. size and location as per plans.
- Plumbing permit May 2023Completed
Repair curb trap fai
- Zoning permit Mar 2023Issued
Limited lodging
- Electrical permit Apr 2022Expired
Install 200amp service with 40 space panel, install 100amp subpanel - 3rd floor; rewire all outlets, lights & switches throughout by fishing as per 2014 nec
Philadelphia Department of Licenses and Inspections
Safety and environment
FEMA natural hazard risk
Relatively Moderate
Highest for this area: heat wave, cold wave. These drive insurance cost here.
FEMA National Risk Index, census tract
Brownfield site
750 ft
Oshun Family Services Center and 1 more within half a mile. Former industrial land in EPA's cleanup and reuse program.
EPA ACRES Brownfields
Toxic release facility
4,500 ft
Cage Graphic Arts and 1 more within a mile. Reports chemical releases to air, water or land to EPA each year.
EPA Toxics Release Inventory
Radon potential
High
Average indoor levels here can exceed 4 pCi/L, EPA's action level. A $15 test kit settles it before you buy.
EPA and USGS Geologic Radon Potential Map
Nearest public schools
900 ft
Fitler Academics Plus (900 ft), Kelly John B Sch (1,000 ft), Mastery CS John Wister Elementary (3,250 ft). Confirm the assigned school with the district.
U.S. Department of Education, NCES
Conforming loan limit 2026
$832,750
Philadelphia County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.
FHFA Conforming Loan Limit Values, one-unit
Have you lived here? Share your experience.
Leave a reviewThe Address Story
Every address has a context. Read its story.
How much it costs to live here
Price, rent, mortgage, and the city's economic context, all in one place.
The money at this address
Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.
Enter a rent and the yield calculation fills in on its own.
Loan calculator for this address
Enter the listing price. The calculation uses only your numbers.
Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.
More on Newhall Street
All addressesViewing recommendations
What's worth checking in person before deciding.
- Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
- Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
- Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
- Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
- Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
- Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.
The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.