433 Ripka Street, Philadelphia
technical data · neighborhood and transit
Permits and code violations
Every permit on file is closed out. No open violations.
- Plumbing permit Nov 2025Completed
Repair/replace sanitary and storm ct & fai.
- Plumbing permit Feb 2024Completed
Repair/replace ct & fai
- Electrical permit Dec 2021Completed
Rewire new kitchen, demo old wires from kitchen, add recessed lights in kitchen, rewire 2nd floor rear bedroom, rewire 2nd floor bathroom, add new light fixtures in basement, install power to air conditioner, install new power for heater. all work performed under 2014 nec
- Plumbing permit Dec 2021Completed
Full rough in and finish work for a 1.5 bathroom house which includes 2- water closets, 2- lavs, 1- tub shower combo, 1- kitchen sink, 1- water heater.
- Mechanical / fuel gas permit Dec 2021Completed
Ez permit ductwork & warm-air appliances for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site plans. install all new hvac, new heater, new air conditioner. installing 10 vents and register covers. install new ductwork. (1) ac condenser unit to be installed in the backyard. 2.5-ton ac condenser and 60,000 btu heater
- Residential building permit Oct 2021Completed
**contractor has a notorized letter with no employees, sole worker**must upload sub-contractor information if applicable** ez permit standards alterations - for alterations to an existing one family dwelling as per attached standard. deviations from this standard will result in permit revocation and require submission of construction plans. structural alteration or repair is expressly prohibited under this permit. prohibited structural work any modifications to exterior walls, party walls, floor/roof framing or foundations, including underpinning, excavation, and removal of foundation slab. work in the basement or cellar is not included on the ez alt permit. separate permits required for mechanical, electric and plumbing. per the contractor, the following work will completed under the permit: new kitchen, new flooring, new hall bath, new plumbing, and electrical fixtures, no change in pipes or wiring. new hvac, replace front porch floor sheathing. no structural work is proposed.
- Plumbing permit Apr 2021Completed
Curb trap, fresh air inlet
- Mechanical permit Feb 2019Completed
Ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standard. deviations from this standard will result in permit revocation and require submission of construction plans.
- Alteration permit Dec 2018Completed
Replace six windows in existing openings, install tile floors and repair sheetrock
- Plumbing permit Nov 2018Completed
Replace toilet, vanity and tub. hook to existing waste & water lines. replacing water heater
- Electrical permit Oct 2018Completed
Remove and replace 100a main breaker panel & all associated branch circuit breakers. rewire 2nd fl, living room and front of basement to code. re feed existing circuits to remain as per 2011 nec (north dist)
- Plumbing permit Sep 2017Completed
Replace water heater
Philadelphia Department of Licenses and Inspections
Have you lived here? Share your experience.
Leave a reviewThe Address Story
Every address has a context. Read its story.
How much it costs to live here
Price, rent, mortgage, and the city's economic context, all in one place.
The money at this address
Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.
Enter a rent and the yield calculation fills in on its own.
Loan calculator for this address
Enter the listing price. The calculation uses only your numbers.
Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.
More on Ripka Street
All addressesViewing recommendations
What's worth checking in person before deciding.
- Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
- This is a house, not an apartment. Check the lot boundaries, car access, and how water drains from the yard after rain, including whether the neighboring lot sits higher and could send water toward the property.
- Check the condition of the fence, yard, and sidewalk out front: who is responsible for upkeep, and whether there are any boundary disputes with neighbors.
- Check the roof, gutters, and downspouts for signs of leaks or recent repairs, especially if it has rained recently.
- Ask to see the construction documents (permit, sign-off) and check for visible cracks on the facade or in the attic/basement.
- Check the sewer connection (public network or septic tank) and the water source (public network or well), including pressure and water quality.
- Schedule a viewing in the evening too, on a weekday, to see street traffic, streetlights, and how quiet the neighborhood is after 8 PM.
Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.