Philadelphia

4136 Lancaster Avenue, Philadelphia

technical data · neighborhood and transit

Loading map…
4136 Lancaster Avenue, PhiladelphiaOpen map

Quick answers

Does 4136 Lancaster Avenue have open permits or code violations?
Philadelphia Department of Licenses and Inspections lists 26 permits, 6 not closed, and 60 violations, 7 open.
What is the 2026 conforming loan limit in Philadelphia County?
$832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
Is radon a problem here?
EPA radon zone 2, moderate potential.
What natural disasters is 4136 Lancaster Avenue at risk for?
FEMA's National Risk Index rates the area relatively low overall, with elevated heat wave risk.

Permits and code violations

6 permits not closed out. Unfinished permits pass to the next owner. 7 open violations.

  1. General permit minor Jul 2026Issued

    For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall result in permit revocation. a separate permit from the philadelphia department of streets is required for any sidewalk and street closures. all means of pedestrian protection required at the site in accordance with the philadelphia building code chapter 33 shall be in place prior to start of work.

  2. Plumbing permit Aug 2022Completed

    Replace curb trap, fai, and house main drain

  3. Zoning permit Apr 2021Issued

    Personal services

  4. Demolition permit Feb 2021Expired

    For the complete demolition of an attached structure. valid sidewalk closure permit to be secured for proposed temporary fencing. pedestrian protection and protection of adjacent structure to be provided in accordance with section b-3306. <a covered walkway or sidewalk cloure shall be req'd within 9-ft of bldg facade in accordance with section b-3306 of the ibc. separate bldg and/or streets dept permit req'd.>

  5. Zoning permit Aug 2020Expired

    For the complete demolish ion of all structures on the lot

  6. Plumbing permit Jun 2020Expired

    For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall result in permit revocation. a separate permit from the philadelphia department of streets is required for any sidewalk and street closures. all means of pedestrian protection required at the site in accordance with the philadelphia building code chapter 33 shall be in place prior to start of work.

  7. Zoning permit Nov 2018Completed

    For the lot adjustment to create one(1) parcel "parcel j" from eight(8) opa accounts(4112 lanster ave,4114 lanster ave,4116 lanster ave,4118-20 lanster ave,4122 lanster ave,4124 lanster ave,4126 lanster ave and 4128 lancaster ave),"parcel a","parcel b","parcel c","parcel d","parcel e","parcel f","parcel g" and "parcel i".see app# 919081 for plans)

  8. Zoning permit Nov 2018Completed

    For the lot adjustment to create one(1) parcel "parcel j" from eight(8) opa accounts(4112 lanster ave,4114 lanster ave,4116 lanster ave,4118-20 lanster ave,4122 lanster ave,4124 lanster ave,4126 lanster ave and 4128 lancaster ave),"parcel a","parcel b","parcel c","parcel d","parcel e","parcel f","parcel g" and "parcel i".

  9. Demolition permit May 2017Completed

    For the complete demolition of a three-story structure as per plan. entire demolition to be performed by hand methods only. a covered walkway or sidewalk closure shall be required within 9 feet of building facade in accordance with section 3306 of the ibc. separate building and/or streets department permits may be required. any deviation will require an amended building permit. *permit received from downstairs*

  10. Zoning/use permit May 2017Completed

    Complete demo

  11. Plumbing permit Apr 2017Completed

    Seal 5" lateral & fai -pa1# 2017-0610689 remove house trap and hermetically sealing the lateral by a cap or plug per section p-606.1 of the philadelphia plumbing code 2004 - "self-certification's are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection"

  12. Alteration permit Jan 2017Completed

    Remove existing 3 story front masonry wall 16 x 30. replace with new 8 inch masonry wall on existing foundation. windows and door same location & shall comply with the 2009 international energy efficiency code, u factor of .35, and with emergency egress standards as per irc. new door opening for 36 inch door. ** horizontal reinforcement (durawall) every 24 inches. install returns into party walls for structural connection. flash and seal roof to new front. no other work allowed under this permit.

Philadelphia Department of Licenses and Inspections

Safety and environment

FEMA natural hazard risk

Relatively Low

Highest for this area: heat wave. These drive insurance cost here.

FEMA National Risk Index, census tract

Brownfield site

2,300 ft

Mt Hope Baptist Church. Former industrial land in EPA's cleanup and reuse program.

EPA ACRES Brownfields

Toxic release facility

4,950 ft

Silvi Concrete Of Philadelphia. Reports chemical releases to air, water or land to EPA each year.

EPA Toxics Release Inventory

Historic listing nearby

300 ft

Leader Theater. Exterior changes can need preservation review; listed buildings can qualify for rehabilitation tax credits.

National Park Service, National Register

Radon potential

Moderate

Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.

EPA and USGS Geologic Radon Potential Map

Nearest public schools

800 ft

Belmont CS (800 ft), Washington Martha Sch (1,350 ft), Philadelphia Learning Academy - West (1,850 ft). Confirm the assigned school with the district.

U.S. Department of Education, NCES

Major airport

6.7 mi

Philadelphia International (PHL). Aircraft may be audible under approach paths.

FAA large-hub airports

Conforming loan limit 2026

$832,750

Philadelphia County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.

FHFA Conforming Loan Limit Values, one-unit

Sunlight

How the sun hits 4136 Lancaster Avenue, Philadelphia

Have you lived here? Share your experience.

Leave a review

The Address Story

Every address has a context. Read its story.

Checking...

How much it costs to live here

Price, rent, mortgage, and the city's economic context, all in one place.

The money at this address

Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.

Estimated monthly rent–
Rent per square foot–
Rent per year–

Enter a rent and the yield calculation fills in on its own.

View sunlight on the mapThe report is free, with a Google account. The PDF also includes the QR code to the sunlight simulation.

Loan calculator for this address

Enter the listing price. The calculation uses only your numbers.

Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.

More on Lancaster Avenue

All addresses

Viewing recommendations

What's worth checking in person before deciding.

  • Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
  • Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
  • Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
  • Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
  • Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
  • Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.

Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.

The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.