Quick answers

Does 413 Poplar Street have open permits or code violations?
Philadelphia Department of Licenses and Inspections lists 54 permits, 4 not closed, and 38 violations, 2 open.
What is the 2026 conforming loan limit in Philadelphia County?
$832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
Is radon a problem here?
EPA radon zone 2, moderate potential.
What natural disasters is 413 Poplar Street at risk for?
FEMA's National Risk Index rates the area relatively moderate overall, with elevated heat wave risk.

Permits and code violations

4 permits not closed out. Unfinished permits pass to the next owner. 2 open violations.

  1. General permit minor Sep 2025Completed

    For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall result in permit revocation. a separate permit from the philadelphia department of streets is required for any sidewalk and street closures. all means of pedestrian protection required at the site in accordance with the philadelphia building code chapter 33 shall be in place prior to start of work.

  2. Plumbing permit May 2025Completed

    Replace curb trap and main drain, install fai

  3. Mechanical / fuel gas permit Apr 2023Completed

    Ez permit ductwork & warm-air appliances- for mechanical work to include the installation as per attached standards. deviations from these standards require submission of construction and site plans. 2 systems 3 ton each 70,000 btu 1,200 cfm, with duct work, condensers in the rear yard

  4. Plumbing permit Jul 2022Completed

    For the erection of a four (4) story single-family dwelling of type vb construction with garage and roof deck. building to be fully sprinklered with a minimum of a nfpa 13r automatic sprinkler system. all work to be done per approved plans and in accordance with 2018 ibc. separate permits required for mechanical, electrical, plumbing, and fire suppression work. energy code compliance in accordance with 2018 iecc. prior to issuance of c.o., submittal of air barrier checklist and envelope testing certificate is required. both to be completed by an approved party. **includes underpinning**

  5. Plumbing permit Jul 2022Completed

    For the erection of a four (4) story single-family dwelling of type vb construction with garage and roof deck. building to be fully sprinklered with a minimum of a nfpa 13r automatic sprinkler system. all work to be done per approved plans and in accordance with 2018 ibc. separate permits required for mechanical, electrical, plumbing, and fire suppression work. energy code compliance in accordance with 2018 iecc. prior to issuance of c.o., submittal of air barrier checklist and envelope testing certificate is required. both to be completed by an approved party. **includes underpinning**

  6. General permit minor Jul 2022Completed

    For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall result in permit revocation. a separate permit from the philadelphia department of streets is required for any sidewalk and street closures. all means of pedestrian protection required at the site in accordance with the philadelphia building code chapter 33 shall be in place prior to start of work.

  7. Plumbing permit Jun 2022Completed

    Ezplum - water distribution permit - complete plumbing system for new sfd to include baths, kitchen / laundry, dwh, new water and sewer service, curb trap incl with bldg drain. plumbing permit (water distribution) for combo rp-2020-016344.

  8. Plumbing permit Jun 2022Completed

    Ezplum - exterior building drainage permit - complete plumbing system for new sfd to include baths, kitchen / laundry, dwh, new water and sewer service, curb trap incl with bldg drain. plumbing permit (exterior building drainage) for combo rp-2020-016344.

  9. Electrical permit Apr 2022Completed

    New 200 amp service. wire throughout as per nec 2014

  10. Electrical permit Apr 2022Completed

    New 200 amp service wire throughout as per nec 2014

  11. Plumbing permit Mar 2022Completed

    For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall result in permit revocation. a separate permit from the philadelphia department of streets is required for any sidewalk and street closures. all means of pedestrian protection required at the site in accordance with the philadelphia building code chapter 33 shall be in place prior to start of work.

  12. Plumbing permit Mar 2022Completed

    For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall result in permit revocation. a separate permit from the philadelphia department of streets is required for any sidewalk and street closures. all means of pedestrian protection required at the site in accordance with the philadelphia building code chapter 33 shall be in place prior to start of work.

Philadelphia Department of Licenses and Inspections

Safety and environment

FEMA natural hazard risk

Relatively Moderate

Highest for this area: heat wave. These drive insurance cost here.

FEMA National Risk Index, census tract

Leaking fuel tanks

1 within 1,650 ft

Nearest: 801 805 N 2nd St, 801 805 N 2nd St (1,450 ft), no further action. Every release here is closed by the state regulator.

EPA UST Finder, leaking underground storage tank releases

Brownfield site

800 ft

1019 27 N 3rd Street and 5 more within half a mile. Former industrial land in EPA's cleanup and reuse program.

EPA ACRES Brownfields

Toxic release facility

2,350 ft

American Freight Warehousing Co and 4 more within a mile. Reports chemical releases to air, water or land to EPA each year.

EPA Toxics Release Inventory

High-voltage line

950 ft

138 kV line run by PECO ENERGY CO.

HIFLD transmission lines

Radon potential

Moderate

Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.

EPA and USGS Geologic Radon Potential Map

Nearest public schools

850 ft

Bodine William W HS (850 ft), Young Scholars CS (1,250 ft), Kearny Gen Philip Sch (1,350 ft). Confirm the assigned school with the district.

U.S. Department of Education, NCES

Major airport

8.3 mi

Philadelphia International (PHL). Aircraft may be audible under approach paths.

FAA large-hub airports

Conforming loan limit 2026

$832,750

Philadelphia County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.

FHFA Conforming Loan Limit Values, one-unit

Sunlight

How the sun hits 413 Poplar Street, Philadelphia

Have you lived here? Share your experience.

Leave a review

The Address Story

Every address has a context. Read its story.

Checking...

How much it costs to live here

Price, rent, mortgage, and the city's economic context, all in one place.

The money at this address

Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.

Estimated monthly rent–
Rent per square foot–
Rent per year–

Enter a rent and the yield calculation fills in on its own.

View sunlight on the mapThe report is free, with a Google account. The PDF also includes the QR code to the sunlight simulation.

Loan calculator for this address

Enter the listing price. The calculation uses only your numbers.

Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.

More on Poplar Street

All addresses

Viewing recommendations

What's worth checking in person before deciding.

  • Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
  • Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
  • Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
  • Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
  • Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
  • Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.

Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.

The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.