3254 Miller Street, Philadelphia
technical data · neighborhood and transit
Permits and code violations
2 permits not closed out. Unfinished permits pass to the next owner. 3 open violations.
- Electrical permit Sep 2025Completed
Replacement of the 100 amp exterior electrical service.
- Electrical permit May 2025Completed
Full house rewire fishing old-work, with all new outlets, switches, circuit breakers, fixtures, smoke and co2 detectors, from existing 100a service, as per 2017 nec
- Zoning permit May 2024Issued
Residential - household living - two-family
- General permit minor Oct 2023Completed
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall result in permit revocation. a separate permit from the philadelphia department of streets is required for any sidewalk and street closures. all means of pedestrian protection required at the site in accordance with the philadelphia building code chapter 33 shall be in place prior to start of work.
- Electrical permit Oct 2023Completed
Installation of solar array in accordance with signed standard.
- General permit minor Oct 2021Expired
This application is for exterior alterations to apply stucco.
- Plumbing permit Dec 2020Completed
For installation of [1]kitchen sink, [2]water closets, [2]lavatories, [1]laundry sink, and [1]tub/shower as per 2018ppc.
- Mechanical / fuel gas permit Oct 2020Completed
Ez permit decks- for new decks to an existing one family dwelling as per attached standards. deviations from these standards require submission of construction and site plans. department of streets is required for any sidewalk and street closures. all means of pedestrian protection required at the site in accordance with the philadelphia building code chapter 33 shall be in place prior to start of work. gas furnace 95% efficient, 60,000 btu, with 8 diffusers, with 2.5 ton a/c 2.5 tons located in the back yard,
- Electrical permit Aug 2020Completed
200 amp single phase service. 20 high hats. wiring, receptacles, and fixtures through out per 2014 nec.
- Residential building permit Jul 2020Completed
Interior renovation of existing single family dwelling. installation of new roof framing.
- Plumbing permit May 2017Completed
Replace house trap & fai pa20171200212 (sfd)self certification's are no longer permitted","all excavations and plumbing trenches in excess of 5 ft in depth must have approved shoring in place at the time of inspection"
- Plumbing permit Dec 2016Completed
Install lav and water closet on first floor.the installation will comply with the philadephia plubming code 2004
Philadelphia Department of Licenses and Inspections
Have you lived here? Share your experience.
Leave a reviewThe Address Story
Every address has a context. Read its story.
How much it costs to live here
Price, rent, mortgage, and the city's economic context, all in one place.
The money at this address
Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.
Enter a rent and the yield calculation fills in on its own.
Loan calculator for this address
Enter the listing price. The calculation uses only your numbers.
Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.
More on Miller Street
All addressesViewing recommendations
What's worth checking in person before deciding.
- Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
- Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
- Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
- Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
- Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
- Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.
The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.