2994 Cedar Street, Philadelphia
technical data · neighborhood and transit
Quick answers
- Does 2994 Cedar Street have open permits or code violations?
- Philadelphia Department of Licenses and Inspections lists 17 permits, all closed, and 41 violations, 5 open.
- What is the 2026 conforming loan limit in Philadelphia County?
- $832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
- Is radon a problem here?
- EPA radon zone 2, moderate potential.
- What natural disasters is 2994 Cedar Street at risk for?
- FEMA's National Risk Index rates the area relatively moderate overall, with elevated heat wave and cold wave risk.
Permits and code violations
Every permit on file is closed out. 5 open violations.
- Electrical permit Dec 2025Completed
Install 200a service wiring through out, install light fixtures, switches, receptacles and hard wire smoke alarm, grounding as per 2017 nec
- Mechanical / fuel gas permit Nov 2025Completed
Ez permit ductwork & warm-air appliances - for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site plans. install 60k btu 92% heater, 2 ton ac, ductwork, and 8 diffusers.
- Plumbing permit Nov 2025Completed
Installing 10 fixtures 2 shower/tubs 3 lavs 3 toilets 1 washer 1 ks
- Residential building permit Oct 2025Completed
Ez permit standards alterations- for alterations to an existing one family dwelling as per attached standard. deviations from this standard will result in permit revocation and require submission of construction plans. separate permits are required for plumbing and electrical work and the installation of heating/cooling appliances. structural alteration or repair is expressly prohibited under this permit. prohibited structural work includes any modification to exterior walls, party walls, floor/roof framing or foundations; including underpinning, excavation, and removal of foundation slab.no work may be performed in the basement or cellar.
- Electrical permit Oct 2022Completed
Installation of solar array in accordance with signed standard.
- Electrical permit Jan 2018Completed
Install 100a service with ground rod and continuous ground. install 5- porcelain light fixtures, 1- 20a gfi receptacles and circuit in kitchen and bathroom. replace 10- fixtures... per 2008 nec for a one family building
- Plumbing permit Oct 2017Completed
Replace rainleader/cesspool and main drain in basement
- Alteration permit May 2015Completed
Interior alterations to include bathroom on 1st floor. applicant agrees to limit the construction to comply with ez permit standard for interior alterations, dated january 2011. deviation from the standard will result in revocation of this permit and imposition of further penalties. all necessary mechanical, electrical, plumbing and fire suppression permits to be obtained, as necessary.
- Plumbing permit Apr 2015Completed
Re-rough bathroom on 1st floor - the installation will comply with the philadelphia plumbing code 2004
- Plumbing permit Mar 2015Completed
Rem & rep lateral, ct pa20150650632 "self-certification's are no longer permitted" - "all excavations & plumbing trenches in excess of 5' in depth must have approved shoring in place at the time of inspection
- Plumbing permit Sep 2013Completed
Replace curb trap & pipe connect to existing pipe line (sfd) pa20132731987
- Plumbing permit Sep 2011Completed
Plumbing alterations throughout - (3)piece bathroom, kitchen sink, laundry tub, rainwater conductor, house drain and soil stack replacement
Philadelphia Department of Licenses and Inspections
Safety and environment
FEMA natural hazard risk
Relatively Moderate
Highest for this area: heat wave, cold wave. These drive insurance cost here.
FEMA National Risk Index, census tract
Superfund site
1.4 mi
Franklin Slag Pile (MDC) (NPL Site). Check groundwater and vapor reports on the EPA site page.
EPA National Priorities List
Brownfield site
2,200 ft
2100 E Rush Street. Former industrial land in EPA's cleanup and reuse program.
EPA ACRES Brownfields
Toxic release facility
1,600 ft
Rhone Poulenc Inc Walsh Div and 14 more within a mile. Reports chemical releases to air, water or land to EPA each year.
EPA Toxics Release Inventory
Radon potential
Moderate
Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.
EPA and USGS Geologic Radon Potential Map
Nearest public schools
650 ft
Memphis Street Academy CS @ JP Jones (650 ft), Richmond Sch (850 ft), Mastbaum Jules E Area Vocational-Technical School (2,500 ft). Confirm the assigned school with the district.
U.S. Department of Education, NCES
Conforming loan limit 2026
$832,750
Philadelphia County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.
FHFA Conforming Loan Limit Values, one-unit
Have you lived here? Share your experience.
Leave a reviewThe Address Story
Every address has a context. Read its story.
How much it costs to live here
Price, rent, mortgage, and the city's economic context, all in one place.
The money at this address
Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.
Enter a rent and the yield calculation fills in on its own.
Loan calculator for this address
Enter the listing price. The calculation uses only your numbers.
Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.
More on Cedar Street
All addressesViewing recommendations
What's worth checking in person before deciding.
- Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
- Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
- Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
- Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
- Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
- Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.
The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.