Does 2934 Page Street have open permits or code violations?
Philadelphia Department of Licenses and Inspections lists 33 permits, 7 not closed, and 60 violations, 9 open.
What is the 2026 conforming loan limit in Philadelphia County?
$832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
Is radon a problem here?
EPA radon zone 2, moderate potential.
What natural disasters is 2934 Page Street at risk for?
FEMA's National Risk Index rates the area relatively moderate overall, with elevated heat wave and cold wave risk.

Permits and code violations

7 permits not closed out. Unfinished permits pass to the next owner. 9 open violations.

  1. Residential building permit Apr 2026Expired

    Make safe permit- for (removal and replacement of up to 10% floor joists in-kind and subfloor.) to resolve case #cf-2026-025840. abutting sidewalk must be closed with fencing a minimum of 6’ in height. separate streets department permit required for sidewalk closure. a separate permit is required for any additional alterations that are not specifically addressed on case #cf-2026-025840. “in accordance with code bulletin pm-1801, a pa professional engineer is required to monitor repairs made under this permit. the engineer must submit a sealed statement to the department confirming that the structure is in sound condition at completion.”

  2. Electrical permit Nov 2024Completed

    Installation of solar array in accordance with signed standard

  3. General permit minor Nov 2024Expired

    For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall result in permit revocation. a separate permit from the philadelphia department of streets is required for any sidewalk and street closures. all means of pedestrian protection required at the site in accordance with the philadelphia building code chapter 33 shall be in place prior to start of work.

  4. Mechanical / fuel gas permit Apr 2024Completed

    For the installation of new hvac appliances, grilles / registers / diffusers, and associated ductwork throughout a five (5) dwelling building. all work to be done per approved plans and in accordance with 2018 imc. appliances to be installed in accordance with manufacturer specifications. separate permits to be obtained for all other work. if site conditions vary, contact design engineer prior to start of work. see cp-2022-007341 for associated building permit.

  5. Electrical permit Jan 2024Completed

    Install a 600 amp service, (6) gang meter bank, (5) 125 amp panels & feeders, (1) 100 amp panel & feeder. install wiring throughout the common areas & five dwelling units, install lights normal & emergency, switches, sensors, receptacles & smoke alarms. provide power for the mechanical & hvac equipment. install a new fire alarm system throughout. all work in accordance with the 2017 nec.

  6. Fire suppression permit Jan 2024Completed

    For installation of sprinkler system per nfpa 13r with 2-inch fire service line and bfp device as per approved plans.

  7. Plumbing permit Nov 2023Completed

    Install 1-1/2 inch water service, 1 building drain, 1 curb trap, 1 fai, 8 water closets, 8 lavatories, 8 shower/tubs, 5 kitchen sinks, 5 hub drains, 5 washing machine boxes, 7 backwater valves, 1 backflow preventer, 1 floor drain, 4 roof drains, 1 sump pump, 5 hot water heaters and 1 hose bibbs according to the 2018 ppc and per plans.

  8. Commercial building permit Sep 2023Completed

    For the construction of an attached structure with basement for multi-family household living for five (5) dwelling units (including one (1) type b unit) as per approved plans and in accordance with the 2018 ibc. if field conditions vary contact design engineer prior to the start of any work. building to be fully sprinklered throughout with nfpa 13r minimum. separate permits required for mechanical, electrical, plumbing, and fire supression work. protection of pedestrians, public right-of-way, and adjacent properties required at all times. **includes underpinning**

  9. Mechanical / fuel gas permit Aug 2023Completed

    Ez permit ductwork & warm-air appliances - for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site plans. install new hvac system, new ductwork, and 10 diffusers

  10. Zoning permit Dec 2022Completed

    Amendment 8/10/23 to document footprint change. for the erection of an attached structure. size and location as shown in plan.

  11. Zoning permit Nov 2022Completed

    For a lot adjustment to create one (1) lot (premises c) from two (2) existing lots (2937 page st & 2939 page st). size and locationa as shown in plan.

  12. Residential building permit May 2022Completed

    Make safe permit to comply with case violations 672536 and cf-2021-099956 to include repair/replacement of exterior walls and roof/floor joists per approved plans and in accordance with code bulletin pm-1801. licensed pa professional engineer is required to monitor repairs made under this permit. the engineer must submit a sealed statement to the department confirming that the structure is in sound condition at completion. separate permits required for additional alterations not addressed in approved plans.

Philadelphia Department of Licenses and Inspections

Safety and environment

FEMA natural hazard risk

Relatively Moderate

Highest for this area: heat wave, cold wave. These drive insurance cost here.

FEMA National Risk Index, census tract

Leaking fuel tanks

4 within 1,650 ft

Nearest: Fleet Site 015, 2601 W Glenwood Ave (1,100 ft), open. 1 still open. Ask whether groundwater or soil vapor testing was done.

EPA UST Finder, leaking underground storage tank releases

Brownfield site

1,050 ft

Home Ownership Project and 2 more within half a mile. Former industrial land in EPA's cleanup and reuse program.

EPA ACRES Brownfields

Toxic release facility

3,900 ft

Halpern Co. Reports chemical releases to air, water or land to EPA each year.

EPA Toxics Release Inventory

High-voltage line

700 ft

230 kV line run by PECO ENERGY CO.

HIFLD transmission lines

Radon potential

Moderate

Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.

EPA and USGS Geologic Radon Potential Map

Nearest public schools

650 ft

Blaine James G Sch (650 ft), Gideon Edward Sch (950 ft), Strawberry Mansion HS (1,350 ft). Confirm the assigned school with the district.

U.S. Department of Education, NCES

Major airport

8.5 mi

Philadelphia International (PHL). Aircraft may be audible under approach paths.

FAA large-hub airports

Conforming loan limit 2026

$832,750

Philadelphia County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.

FHFA Conforming Loan Limit Values, one-unit

Sunlight

How the sun hits 2934 Page Street, Philadelphia

Have you lived here? Share your experience.

Leave a review

The Address Story

Every address has a context. Read its story.

Checking...

How much it costs to live here

Price, rent, mortgage, and the city's economic context, all in one place.

The money at this address

Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.

Estimated monthly rent–
Rent per square foot–
Rent per year–

Enter a rent and the yield calculation fills in on its own.

View sunlight on the mapThe report is free, with a Google account. The PDF also includes the QR code to the sunlight simulation.

Loan calculator for this address

Enter the listing price. The calculation uses only your numbers.

Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.

More on Page Street

All addresses

Viewing recommendations

What's worth checking in person before deciding.

  • Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
  • Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
  • Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
  • Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
  • Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
  • Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.

Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.

The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.