Philadelphia

2656 Agate Street, Philadelphia

technical data · neighborhood and transit

Loading map…
2656 Agate Street, PhiladelphiaOpen map

Quick answers

Does 2656 Agate Street have open permits or code violations?
Philadelphia Department of Licenses and Inspections lists 60 permits, 24 not closed, and 60 violations, 10 open.
What is the 2026 conforming loan limit in Philadelphia County?
$832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
Is radon a problem here?
EPA radon zone 2, moderate potential.
What natural disasters is 2656 Agate Street at risk for?
FEMA's National Risk Index rates the area relatively high overall, with elevated inland flooding and heat wave risk.

Permits and code violations

24 permits not closed out. Unfinished permits pass to the next owner. 10 open violations.

  1. Plumbing permit Oct 2026Issued

    Plumbing permit (water distribution) for combo rp-2026-004532

  2. Plumbing permit Oct 2026Issued

    Plumbing permit (exterior building drainage) for combo rp-2026-004532

  3. Fire suppression permit Oct 2026Issued

    For the installation of an automatic fire suppression system in accordance with nfpa 13d throughout three story building to include 1-inch combined water service line as per approved plans. all work shall be done in accordance with approved plans/hydraulic calculations. if field conditions vary contact design engineer prior to the start of any work.

  4. Mechanical / fuel gas permit Sep 2026Issued

    Mechanical / fuel gas permit for combo rp-2026-004532

  5. Electrical permit Sep 2026Issued

    Electrical permit for combo rp-2026-004532

  6. Plumbing permit Aug 2026Issued

    Plumbing permit (interior) for combo rp-2026-004532

  7. Residential building permit Jul 2026Issued

    Erection of an attached structure for use as single-family household living. sheeting and shoring as prescribed in geo tech report. separate permits required for electrical, mechanical, plumbing and sprinkler (13d) work. (no underpinning on this permit and no excavation below five feet proposed). energy code compliance in accordance with 2018 iecc. prior to issuance of c.o submittal of air barrier checklist and envelope testing certificate is required. both to be completed by an approved party.

  8. Zoning permit Apr 2026Issued

    For the erection of an attached structure with a roof deck and roof deck access structure above. size and location as shown in the application / plans.

  9. Zoning permit Mar 2026Issued

    For the erection one story addition above the existing second floor and erection of accessory roof deck (for residential use only) with roof access structure all as part of an existing attached structure. size and location as shown in the application / plan

  10. Zoning permit Apr 2025Issued

    For the erection of third-story addition on an existing two-story structure nte 38' in height and roof deck accessed by a roof deck access structure in an existing single-family household living. size and location as shown in the application/plan, ** no roof deck permitted in the required front setback **

  11. Plumbing permit Mar 2024Completed

    Install 3 lavatories, 2 tub/showers, 3 water closets, 1 laundry sink, 1 kitchen sink & 1 dishwasher. total 10 fixtures

  12. Electrical permit Feb 2024Completed

    Wiring entire house installing 110volts smoke and monoxide detection, devices, and light fixtures. install 200 amp service

Philadelphia Department of Licenses and Inspections

Safety and environment

FEMA natural hazard risk

Relatively High

Highest for this area: inland flooding, heat wave, cold wave. These drive insurance cost here.

FEMA National Risk Index, census tract

Superfund site

1.9 mi

Franklin Slag Pile (MDC) (NPL Site). Check groundwater and vapor reports on the EPA site page.

EPA National Priorities List

Leaking fuel tanks

6 within 1,650 ft

Nearest: Us Gas 1, 2656 Frankford Ave (1,600 ft), open. 1 still open. Ask whether groundwater or soil vapor testing was done.

EPA UST Finder, leaking underground storage tank releases

Brownfield site

1,750 ft

2100 E Rush Street and 1 more within half a mile. Former industrial land in EPA's cleanup and reuse program.

EPA ACRES Brownfields

Toxic release facility

1,050 ft

Calbar Inc and 7 more within a mile. Reports chemical releases to air, water or land to EPA each year.

EPA Toxics Release Inventory

High-voltage line

700 ft

138 kV line run by PECO ENERGY CO.

HIFLD transmission lines

Radon potential

Moderate

Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.

EPA and USGS Geologic Radon Potential Map

Nearest public schools

1,950 ft

Kensington HS (1,950 ft), Hackett Horatio B Sch (2,050 ft), Memphis Street Academy CS @ JP Jones (2,300 ft). Confirm the assigned school with the district.

U.S. Department of Education, NCES

Conforming loan limit 2026

$832,750

Philadelphia County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.

FHFA Conforming Loan Limit Values, one-unit

Sunlight

How the sun hits 2656 Agate Street, Philadelphia

Have you lived here? Share your experience.

Leave a review

The Address Story

Every address has a context. Read its story.

Checking...

How much it costs to live here

Price, rent, mortgage, and the city's economic context, all in one place.

The money at this address

Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.

Estimated monthly rent–
Rent per square foot–
Rent per year–

Enter a rent and the yield calculation fills in on its own.

View sunlight on the mapThe report is free, with a Google account. The PDF also includes the QR code to the sunlight simulation.

Loan calculator for this address

Enter the listing price. The calculation uses only your numbers.

Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.

More on Agate Street

All addresses

Viewing recommendations

What's worth checking in person before deciding.

  • Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
  • Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
  • Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
  • Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
  • Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
  • Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.

Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.

The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.