255 West Mayfield Street, Philadelphia
technical data · neighborhood and transit
Quick answers
- Does 255 West Mayfield Street have open permits or code violations?
- Philadelphia Department of Licenses and Inspections lists 19 permits, 9 not closed, and 12 violations, 1 open.
- What is the 2026 conforming loan limit in Philadelphia County?
- $832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
- Is radon a problem here?
- EPA radon zone 2, moderate potential.
- What natural disasters is 255 West Mayfield Street at risk for?
- FEMA's National Risk Index rates the area relatively moderate overall, with elevated heat wave and cold wave risk.
Permits and code violations
9 permits not closed out. Unfinished permits pass to the next owner. 1 open violation.
- Demolition permit Sep 2026Issued
For the complete demolition of the damaged attached structure by hand demolition to resolve case cf-2021-010645. all permitted demolition activity to be in accordance with approved site safety demolition plan & such plan to be maintained on site at all times in accordance with philadelphia administrative code. any deviation will require an amended building permit. pedestrian protection to be in place prior to start of work and to be maintained during all demolition activities. *a covered walkway or sidewalk closure shall be required within five (5) feet of building facades in accordance with section 3306 of the ibc. separate building and/or streets department permits are required. if field conditions vary contact design professional prior to the start of any work.
- Plumbing permit Sep 2026Completed
Seal lateral pa20262593587 remove house trap and hermetically sealing the lateral by a cap or plug ."all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection"
- Zoning permit Sep 2026Issued
Complete demolition of existing structure/s on the lot to become a vacant lot
- Electrical permit Apr 2026Issued
Provide temp power for construction for playground on lot using existing aerial conductor and meter on site. see note below from site permit:
- Electrical permit Apr 2026Issued
Electrical permit for combo sp-2026-000183
- Site / utility permit Apr 2026Issued
For sitework with onsite utility services. separate permit required for mechanical, electrical and plumbing work.
- Plumbing permit Jan 2026Issued
Plumbing permit for combo sp-2025-001594 installation of on-site stormwater piping, outlet structure, and rcp connection to city infrastructure. all work to be performed in strict compliance with 2018 ppc and approved plans.
- Site / utility permit Jan 2026Issued
For site work associated with new recreational park facility to include grading, curb replacement, sidewalk replacement, and on-site utilities as per approved plans. no building construction on this permit. see zp-2024-004847 for zoning approval. see sr-2024-024850 for streets department approval. *2018 ibc review* **separate permits required for electrical and plumbing work**
- Site / utility permit Dec 2025Issued
Sitework associated with new recreational park facility to include seating areas, planters, lighting and playground structure as per approved plans. no building construction on this permit. *2018 ibc review* **separate permits required for any electrical or plumbing work**
- Zoning permit Jun 2025Issued
For the erection of a park & open space for active recreation, including playground equipment, six (6) accessory detached structures and related landscaping improvements. size and location as shown on the application & plans.
- Demolition permit Mar 2025Completed
Sub demolition permit for cf-2020-076740. for the complete demolition of a property as part of the city of philadelphia demolition program. add'l specs: replace front sidewalk. (2) stucco c/w 3025, 3029 n. 3rd st. erosion control mat with topsoil and seed. 4' corral fence across front of property.
- Plumbing permit Mar 2025Completed
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall result in permit revocation. a separate permit from the philadelphia department of streets is required for any sidewalk and street closures. all means of pedestrian protection required at the site in accordance with the philadelphia building code chapter 33 shall be in place prior to start of work.
Philadelphia Department of Licenses and Inspections
Safety and environment
FEMA natural hazard risk
Relatively Moderate
Highest for this area: heat wave, cold wave, winter weather. These drive insurance cost here.
FEMA National Risk Index, census tract
Superfund site
2.9 mi
Franklin Slag Pile (MDC) (NPL Site). Check groundwater and vapor reports on the EPA site page.
EPA National Priorities List
Radon potential
Moderate
Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.
EPA and USGS Geologic Radon Potential Map
Nearest public schools
800 ft
Pan American Academy CS (800 ft), Potter-Thomas Sch (1,350 ft), Sheppard Isaac Sch (1,600 ft). Confirm the assigned school with the district.
U.S. Department of Education, NCES
Conforming loan limit 2026
$832,750
Philadelphia County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.
FHFA Conforming Loan Limit Values, one-unit
Have you lived here? Share your experience.
Leave a reviewThe Address Story
Every address has a context. Read its story.
How much it costs to live here
Price, rent, mortgage, and the city's economic context, all in one place.
The money at this address
Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.
Enter a rent and the yield calculation fills in on its own.
Loan calculator for this address
Enter the listing price. The calculation uses only your numbers.
Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.
More on West Mayfield Street
All addressesViewing recommendations
What's worth checking in person before deciding.
- Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
- Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
- Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
- Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
- Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
- Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.
The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.