Philadelphia

2459 North 29th Street, Philadelphia

technical data · neighborhood and transit

Loading map…
2459 North 29th Street, PhiladelphiaOpen map

Quick answers

Does 2459 North 29th Street have open permits or code violations?
Philadelphia Department of Licenses and Inspections lists 30 permits, 4 not closed, and 60 violations, 4 open.
What is the 2026 conforming loan limit in Philadelphia County?
$832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
Is radon a problem here?
EPA radon zone 2, moderate potential.
What natural disasters is 2459 North 29th Street at risk for?
FEMA's National Risk Index rates the area relatively low overall, with elevated heat wave risk.

Permits and code violations

4 permits not closed out. Unfinished permits pass to the next owner. 4 open violations.

  1. Demolition permit Mar 2024Completed

    Sub demolition permit for cf-2024-014116. for the complete demolition of a sfd as part of the city of philadelphia demolition program. add'l specs: no sidewalk. no sidewalk. clean adjacent lot at 2458 n. dover st.

  2. Plumbing permit Mar 2024Completed

    For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall result in permit revocation. a separate permit from the philadelphia department of streets is required for any sidewalk and street closures. all means of pedestrian protection required at the site in accordance with the philadelphia building code chapter 33 shall be in place prior to start of work.

  3. Residential building permit Nov 2022Completed

    For the removal and reconstruction of the front façade wall with wood framed construction. work to include a structural reinforcement of the front foundation wall per plans. separate permits required for any associated mep work.

  4. Fire suppression permit Jun 2022Completed

    For the installation of a two-inch fire service line, two-inch backflow preventer and fire sprinkler system in accordance with approved plans, hydraulic calculations and nfpa 13r.

  5. Commercial building permit Apr 2022Completed

    For change of occupancy to r-2 and level ii alterations to include partitions, fixtures, furnishings, finishes as per approved plans. building to be fully sprinklered per nfpa 13r minimum. separate permits required for mep and fire suppression work. *2018 iebc*

  6. Demolition permit Mar 2022Completed

    For the complete demolition of a sfd as part of the city of philadelphia demolition program. * add'l specs: 1 stucco c/w 2461 n 29th st. erosion control mat with seed on lot

  7. Residential building permit Nov 2021Expired

    Make safe permit to resolve case violation # cf-2021-057291 for shoring of interior frontage to support during repairs, side rear wall reset and repair bulge, and the rear shed roof structure removal, reframe and repair. as per approved engineered plans and engineer report. if field conditions vary contact the design engineer prior to the start of any work. separate permits will be required for any additional alterations not addressed in the engineer's report / plans. abutting sidewalk must be closed with fencing a minimum of 6 ft. in height. separate streets department permit required for sidewalk closure. in accordance with code bulletin pm-1801, a pa professional engineer is required to monitor repairs made under this permit. the engineer must submit a sealed statement to the department confirming that the structure is in sound condition at completion.

  8. Zoning permit Mar 2021Issued

    Residential - household living - multi-family

  9. Alteration permit Oct 2019Completed

    Make safe permit - install 5/8" star-bolts 4' o.c. and 4' from the corners of the front facade at the 2nd floor level thru the rim joist and 2-floor joists with 4"x4" plate washers and double nuts and adding wood blocking between the joists along the bolt line as per engineer's report/sketch to resolve case # 574139. abutting sidewalk must be closed with fencing a minimum of 6' in height. separate streets department permit required for sidewalk closure. a separate permit is required for any additional alterations that are not specifically addressed on case #574139. **contractor has no employees per notarized letter**

  10. Alteration permit Nov 2018Completed

    Make safe permit to resolve case #625904 as per engineer's report, remove and replace 1st floor rear roof with like and same. only with the presence of the engineer of record,the contractor will support existing portion of bulged first floor wall (=/- 13'x12') and repair/ replace masonry as per engineers guidence as per notarized letter contractor has no employees

  11. Electrical permit Dec 2015Completed

    Inst 200a meter board 3-gang to exist 200a serv 1-200a pnl 100a sub-feed cable & pnl, 1-house pnl, 44-out, 22-sw, 9-flor & 17-ceil lgts, 2-hvac ckts,4-ex lgts,3-bathfan lgts as per nec 2008 & fire alarm as per nfpa 72

  12. Mechanical permit Nov 2015Completed

    Installation of two forced air/gas heater 90,000-btu and 70,000-btu,and all necessary ductwork.

Philadelphia Department of Licenses and Inspections

Safety and environment

FEMA natural hazard risk

Relatively Low

Highest for this area: heat wave. These drive insurance cost here.

FEMA National Risk Index, census tract

Leaking fuel tanks

2 within 1,650 ft

Nearest: Walton Sch 442, 28th & Huntington (750 ft), no further action. Every release here is closed by the state regulator.

EPA UST Finder, leaking underground storage tank releases

Brownfield site

1,500 ft

2400 North 32nd Street and 5 more within half a mile. Former industrial land in EPA's cleanup and reuse program.

EPA ACRES Brownfields

Toxic release facility

3,600 ft

Sun Chemical Corp and 3 more within a mile. Reports chemical releases to air, water or land to EPA each year.

EPA Toxics Release Inventory

Radon potential

Moderate

Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.

EPA and USGS Geologic Radon Potential Map

Nearest public schools

1,350 ft

Wright Richard R Sch (1,350 ft), Allen Dr Ethel Sch (1,850 ft), Strawberry Mansion HS (1,850 ft). Confirm the assigned school with the district.

U.S. Department of Education, NCES

Major airport

9.0 mi

Philadelphia International (PHL). Aircraft may be audible under approach paths.

FAA large-hub airports

Conforming loan limit 2026

$832,750

Philadelphia County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.

FHFA Conforming Loan Limit Values, one-unit

Sunlight

How the sun hits 2459 North 29th Street, Philadelphia

Have you lived here? Share your experience.

Leave a review

The Address Story

Every address has a context. Read its story.

Checking...

How much it costs to live here

Price, rent, mortgage, and the city's economic context, all in one place.

The money at this address

Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.

Estimated monthly rent–
Rent per square foot–
Rent per year–

Enter a rent and the yield calculation fills in on its own.

View sunlight on the mapThe report is free, with a Google account. The PDF also includes the QR code to the sunlight simulation.

Loan calculator for this address

Enter the listing price. The calculation uses only your numbers.

Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.

More on North 29th Street

All addresses

Viewing recommendations

What's worth checking in person before deciding.

  • Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
  • Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
  • Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
  • Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
  • Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
  • Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.

Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.

The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.