Philadelphia

230 North 23rd Street, Philadelphia

Apartment building

technical data · neighborhood and transit

Loading map…
230 North 23rd Street, PhiladelphiaOpen map

Quick answers

Is 230 North 23rd Street in a flood zone?
Yes. FEMA maps it in Zone AE, a high-risk flood area. Federally backed lenders require flood insurance.
Does 230 North 23rd Street have open permits or code violations?
Philadelphia Department of Licenses and Inspections lists 13 permits, 1 not closed, and 4 violations.
What is the 2026 conforming loan limit in Philadelphia County?
$832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
Is radon a problem here?
EPA radon zone 2, moderate potential.
What natural disasters is 230 North 23rd Street at risk for?
FEMA's National Risk Index rates the area relatively high overall, with elevated inland flooding and heat wave risk.

Permits and code violations

1 permit not closed out. Unfinished permits pass to the next owner. No open violations.

  1. General permit Feb 2023Completed

    For the installation of two (2) illuminated wall signs as per approved plans. separate permits required for electrical work.

  2. Electrical permit Dec 2022Completed

    New construction of a seven (7) story structure with a roof deck accommodating one hundred eighty (180) dwelling units as per approved plans. level 3 through 7 to be modular construction – type iiia. scope of work to include the following; complete 13.2kv service, (1) 1725kva transformer, (1) 112.5kva transformer for fire pump, all panel boards and disconnects, all wiring, devices and lighting for forty (40) conventionally built apartments. all wiring, devices, and lighting for hallways, exterior and roof deck as per 2017 nec.

  3. Mechanical / fuel gas permit Nov 2022Completed

    For the installation of hvac appliances, grilles/registers/diffusers, and associated ductwork at the 3rd through 7th floors. all work to be done per approved plans and in accordance with 2018 imc. separate permits to be obtained for all other work. if site conditions vary, contact design engineer prior to start of work. see cp-2020-005469 for associated building permit.

  4. Plumbing permit Nov 2022Completed

    Plumbing scope primarily on levels 3 through 7, already built and plumbed (modular construction – type iiia). plumber to only make final connection to newly installed sanitary waste and vent stacks installed by modular manufaturer. to stub-down through 3rd floor podium to be continued by other. install (5) mop sinks(other); (4) hose bibs; (2) outdoor sinks(other

  5. Mechanical / fuel gas permit Oct 2022Completed

    For the installation of a new hvac systems, associated duct work, rooftop units, and registers/diffusers as per approved plans. separate permit required for electrical, plumbing, fire suppression

  6. Fire suppression permit Jul 2022Completed

    For the installation of a 6-inch fire service line for an automatic fire suppression sprinkler system with a backflow prevention assembly, standpipes, and fire pump in accordance with nfpa 13. all work shall be done in accordance with approved plans/hydraulic calculations.

  7. Zoning permit Jun 2022Completed

    For the erection of two statically illuminated flat wall signs accessory to the existing apartment building , size and location as shown on the plans.

  8. Plumbing permit Mar 2022Completed

    Install 4 inch water service, 1 house drain, 1 curb trap, 1 fai, 2 booster pumps, 3 sump pumps, 1 mop sink, 37 washing machine boxes, 1 ice maker, 1 hose bibb, 6 floor drains, 3 floor sinks, 1 backflow preventers, 14 roof drains, 40 hot water heaters, 40 kitchen sinks, 42 shower/tubs and 42 water closets according to the 2018 ppc.

  9. Electrical permit Feb 2022Completed

    Installation of (2) 100 amp 240v temporary overhead services. (2) quad receptacles per service. all work per nec2017

  10. General permit Nov 2021Completed

    Tank removal permit - removal of one (1) 2,500 gallon heating oil underground storage tank (ust) remove any petroleum product/water from tank, clean tank, conduct a confirmatory soil sampling of surrounding soil. contingency plan in place in the case contaminated soils discovered and backfill. all work completed in accordance with padep ust removal guidelines. provide the city of philadelphia with a tank closure report. no other work apprvoed on this must back fill after excavation

  11. Commercial building permit Dec 2020Completed

    New construction of a seven (7) story structure for use as one hundred eighty (180) dwelling units as per approved plans. building to utilize horizontal separations to create two (2) separate buildings with two (2) different construction types (1st & 2nd floors - type ia and 3rd through 7th floors - type iiia). levels 3 through 7 to be of modular construction. fire retardant treated studs and sheathing required for type iii construction. building to be fully sprinklered per nfpa 13 and include standpipes per nfpa 14. fire watch required per code bulletin f-2001. *2018 ibc review* **separate permits required for mep & fire suppression work** amendment approved 8/4/23 amend new construction permit cp-2020-005469 to update deck construction details as per approved plans. amendment approved 10/23/23 amend new construction permit cp-2020-005469 to include installation of pre-manufactured pergola on roof top deck as per approved plans.

  12. Zoning permit Nov 2020Issued

    Residential - household living - multi-family

Philadelphia Department of Licenses and Inspections

Safety and environment

FEMA natural hazard risk

Relatively High

Highest for this area: inland flooding, heat wave. These drive insurance cost here.

FEMA National Risk Index, census tract

FEMA flood zone

Zone AE

Special Flood Hazard Area: a 1% or higher chance of flooding each year. Lenders backed by federal programs require flood insurance here. Ask for the elevation certificate and an insurance quote before you commit.

FEMA National Flood Hazard Layer (FIRM)

Leaking fuel tanks

3 within 1,650 ft

Nearest: Police Site 014, 2001 Pennsylvania Ave (1,600 ft), open. 1 still open. Ask whether groundwater or soil vapor testing was done.

EPA UST Finder, leaking underground storage tank releases

Radon potential

Moderate

Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.

EPA and USGS Geologic Radon Potential Map

Nearest public schools

1,950 ft

Russell Byers CS (1,950 ft), Greenfield Albert M Sch (2,450 ft), Freire CS (2,500 ft). Confirm the assigned school with the district.

U.S. Department of Education, NCES

Major airport

6.9 mi

Philadelphia International (PHL). Aircraft may be audible under approach paths.

FAA large-hub airports

Conforming loan limit 2026

$832,750

Philadelphia County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.

FHFA Conforming Loan Limit Values, one-unit

Sunlight

How the sun hits 230 North 23rd Street, Philadelphia

Building typeApartment building

Have you lived here? Share your experience.

Leave a review

The Address Story

Every address has a context. Read its story.

Checking...

How much it costs to live here

Price, rent, mortgage, and the city's economic context, all in one place.

The money at this address

Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.

Estimated monthly rent–
Rent per square foot–
Rent per year–

Enter a rent and the yield calculation fills in on its own.

View sunlight on the mapThe report is free, with a Google account. The PDF also includes the QR code to the sunlight simulation.

Loan calculator for this address

Enter the listing price. The calculation uses only your numbers.

Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.

More on North 23rd Street

All addresses

Viewing recommendations

What's worth checking in person before deciding.

  • Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
  • Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
  • Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
  • Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
  • Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
  • Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.

Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.