2235 Page Street, Philadelphia
technical data · neighborhood and transit
Quick answers
- Does 2235 Page Street have open permits or code violations?
- Philadelphia Department of Licenses and Inspections lists 23 permits, 3 not closed, and 60 violations, 3 open.
- What is the 2026 conforming loan limit in Philadelphia County?
- $832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
- Is radon a problem here?
- EPA radon zone 2, moderate potential.
- What natural disasters is 2235 Page Street at risk for?
- FEMA's National Risk Index rates the area relatively moderate overall, with elevated heat wave and cold wave risk.
Permits and code violations
3 permits not closed out. Unfinished permits pass to the next owner. 3 open violations.
- Electrical permit Jun 2024Completed
Electrical permit for combo rp-2024-005777
- Plumbing permit Jun 2024Expired
Plumbing permit (interior) for combo rp-2024-005777
- Residential building permit Jun 2024Expired
Ez permit standards alterations- for alterations to an existing one family dwelling as per attached standard. deviations from this standard will result in permit revocation and require submission of construction plans. separate permits are required for plumbing and electrical work and the installation of heating/cooling appliances. structural alteration or repair is expressly prohibited under this permit. prohibited structural work includes any modification to exterior walls, party walls, floor/roof framing or foundations; including underpinning, excavation, and removal of foundation slab.no work may be performed in the basement or cellar. bathroom adaptations on the 1nd floor. phdc project wo:194530
- Residential building permit Oct 2023Completed
For partial demolition of a single-story portion of the rear first story, and for alterations to close-up the rear exterior wall, relocate the kitchen on the interior, and to replace the exterior rear door and exterior rear steps to grade, to an existing two (2) story attached structure used as group r-3 (sfd), as per plans; no other work on this permit; if field conditions vary contact design engineer prior to the start of any work; compliance with philadelphia fire and property maintenance codes required prior to occupancy; see zp-2023-011072 for zoning approval of partial demolition.
- Zoning permit Oct 2023Completed
For partial demolition at the rear of existing attached structure. size and location as shown in plan.
- Electrical permit Oct 2023Completed
100a svc, 32 space panel, replace fixture, (20) replace recpts, (15) replace switches. no fishing or wiremold as per nec 2017
- Electrical permit May 2023Completed
Install 100 amp service w/ 30 circuit panel, fixtures, gfi's, receptacles, exterior fixtures, and replace receptacles and fixtures. fishing wire through walls only nec 17
- Plumbing permit May 2023Completed
Repair/replace rear area drains
- Plumbing permit Nov 2022Completed
Installation of two full bath room and one kitchen sink
- Electrical permit Nov 2022Completed
Replace outlet and devices 20 with new boxes only as per 2014 nec
- Residential building permit Oct 2022Completed
**contractor has a notarized letter with no employees, sole worker** ez permit standards alterations - (plaster removal, drywall installation, painting, kitchen cabinets, vinyl flooring, window installation). for alterations to an existing one family dwelling as per attached standard. deviations from this standard will result in permit revocation and require submission of construction plans. structural alteration or repair is expressly prohibited under this permit. prohibited structural work any modifications to exterior walls, party walls, floor/roof framing or foundations, including underpinning, excavation, and removal of foundation slab. work in the basement or cellar is not included on the ez alt permit. separate permits required for mechanical, electric and plumbing.
- Electrical permit Aug 2021Completed
Replace 100amp service install ground-fault receptacle and dedicated circuit using wire mold. as per 2014 nec.
Philadelphia Department of Licenses and Inspections
Safety and environment
FEMA natural hazard risk
Relatively Moderate
Highest for this area: heat wave, cold wave. These drive insurance cost here.
FEMA National Risk Index, census tract
Leaking fuel tanks
3 within 1,650 ft
Nearest: Raymond Rosen Housing Dev, 2110 N 23rd St (100 ft), no further action. Every release here is closed by the state regulator.
EPA UST Finder, leaking underground storage tank releases
Brownfield site
1,750 ft
2410 28 W Sedgley Ave and 9 more within half a mile. Former industrial land in EPA's cleanup and reuse program.
EPA ACRES Brownfields
Radon potential
Moderate
Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.
EPA and USGS Geologic Radon Potential Map
Nearest public schools
650 ft
Frederick Douglass Mastery CS (650 ft), Dick William Sch (800 ft), Wright Richard R Sch (2,450 ft). Confirm the assigned school with the district.
U.S. Department of Education, NCES
Major airport
8.7 mi
Philadelphia International (PHL). Aircraft may be audible under approach paths.
FAA large-hub airports
Conforming loan limit 2026
$832,750
Philadelphia County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.
FHFA Conforming Loan Limit Values, one-unit
Have you lived here? Share your experience.
Leave a reviewThe Address Story
Every address has a context. Read its story.
How much it costs to live here
Price, rent, mortgage, and the city's economic context, all in one place.
The money at this address
Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.
Enter a rent and the yield calculation fills in on its own.
Loan calculator for this address
Enter the listing price. The calculation uses only your numbers.
Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.
More on Page Street
All addressesViewing recommendations
What's worth checking in person before deciding.
- Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
- Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
- Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
- Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
- Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
- Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.
The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.