Permits and code violations

8 permits not closed out. Unfinished permits pass to the next owner. 7 open violations.

  1. General permit minor Aug 2025Expired

    For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall result in permit revocation. a separate permit from the philadelphia department of streets is required for any sidewalk and street closures. all means of pedestrian protection required at the site in accordance with the philadelphia building code chapter 33 shall be in place prior to start of work.

  2. Plumbing permit Jun 2024Completed

    Install 4 roof drains, 4 water closets, 4 shower/tubs, 4 lavatories, 3 kitchen sinks, 3 washing machine boxes, 1 sand interceptor, 1 floor drain, 1 sump pump and 3 hot water heaters according to the 2018 ppc and per plans.

  3. Mechanical / fuel gas permit May 2024Completed

    For the installation of registers, diffusers and appliances with associated ductwork. appliances to be installed in accordance with the manufacturer’s specifications. all work to be done per approved plans.** if field conditions vary contact design engineer prior to the start of any work.** separate permits required for all other work.**

  4. Fire suppression permit Apr 2024Completed

    For installation of sprinkler system per nfpa 13r with 2-inch fire service line and bfp device as per approved plans.

  5. Fire suppression permit Apr 2024Expired

    Rough-in permit for fp-2024-000760 install new 2" fire service from street to building supply and install all required sprinklers per nfpa 13r supply and install all required piping, hangers and fittings supply and install 2" city-approved backflow preventer supply and install new fire department connection supply and install all required bells, tampers and flow switches

  6. Electrical permit Mar 2024Completed

    Install a 400 amp service, (4) gang meter bank, (3) 125 amp panels & feeders, (1) 100 amp panel & feeder. install wiring throughout the common areas & three dwelling units. install lights normal & emergency, switches, sensors, receptacles, smoke & carbon monoxide alarms. provide power for the mechanical & hvac equipment. install a new fire alarm system throughout. all work in accordance with the 2017 nec.

  7. Commercial building permit Dec 2023Completed

    For the erection of a rear addition including balcony and roof deck and for level 3 alterations to the existing structure as per plans.

  8. General permit minor Nov 2023Expired

    For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall result in permit revocation. a separate permit from the philadelphia department of streets is required for any sidewalk and street closures. all means of pedestrian protection required at the site in accordance with the philadelphia building code chapter 33 shall be in place prior to start of work.

  9. General permit minor May 2023Expired

    For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall result in permit revocation. a separate permit from the philadelphia department of streets is required for any sidewalk and street closures. all means of pedestrian protection required at the site in accordance with the philadelphia building code chapter 33 shall be in place prior to start of work.

  10. Zoning permit Apr 2023Issued

    For the erection of a roof deck & deck at the rear of an existing semi-detached structure, with no vertical supports within 18 inches of a property line. size and location as shown in the application/plans.

  11. Zoning permit Jun 2021Issued

    For the erection of an addition above a rear one-story portion of an existing semi-detached structure. size and location as shown on plans.

  12. General permit minor Nov 2020Expired

    For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall result in permit revocation. a separate permit from the philadelphia department of streets is required for any sidewalk and street closures. all means of pedestrian protection required at the site in accordance with the philadelphia building code chapter 33 shall be in place prior to start of work.

Philadelphia Department of Licenses and Inspections

Sunlight

How the sun hits 223 West Queen Lane, Philadelphia

Have you lived here? Share your experience.

Leave a review

The Address Story

Every address has a context. Read its story.

Checking...

How much it costs to live here

Price, rent, mortgage, and the city's economic context, all in one place.

The money at this address

Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.

Estimated monthly rent–
Rent per square foot–
Rent per year–

Enter a rent and the yield calculation fills in on its own.

View sunlight on the mapThe report is free, with a Google account. The PDF also includes the QR code to the sunlight simulation.

Loan calculator for this address

Enter the listing price. The calculation uses only your numbers.

Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.

More on West Queen Lane

All addresses

Viewing recommendations

What's worth checking in person before deciding.

  • Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
  • Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
  • Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
  • Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
  • Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
  • Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.

Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.

The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.