Philadelphia

220 West Washington Square, Philadelphia

Apartment building

technical data · neighborhood and transit

Loading map…
220 West Washington Square, PhiladelphiaOpen map

Permits and code violations

7 permits not closed out. Unfinished permits pass to the next owner. 3 open violations.

  1. Commercial building permit Jul 2026Issued

    For the repair to exterior building elements as shown on the approved plan. all work to be done per approved plans. if field conditions vary contact design engineer prior to the start of any work. separate permits required for all other work. **subject to the following condition of approval from the philadelphia historical commission: phc staff to review all masonry samples for final approval.

  2. General permit minor Jun 2026Completed

    For the installation of new roof coverings on existing roofs as per attached standard. deviations from these standards require submission of construction and site plans. as per phc approval, no work to exterior windows and/or doors as part of this permit. no work to the front facade as part of this permit.

  3. Plumbing permit Mar 2026Completed

    Replace 10 fixtures -toilet, tub, lavatory faucet fixtures in three full baths. **without piping**

  4. Commercial building permit Mar 2026Issued

    For level ii alterations to an existing structure. alterations to existing restrooms to include finishes/furnishings and accessibility improvements throughout. for use as previously approved. all work to be done per approved plans. ***************** separate permits to be obtained for all other work. ******************************************

  5. Electrical permit Oct 2025Completed

    Kitchen renovation to include new lighting, new appliances, reuse the existing appliance circuits, install afci/gfci circuit breakers

  6. Plumbing permit Oct 2025Completed

    Fixture replacement without piping of 5 fixtures in existing apartment #600 work to comply with 2018 ppc and ez standard

  7. Commercial building permit Sep 2025Completed

    For level ii alteration to the existing apartment unit #600 as per approved plans. separate permits required for mep work.

  8. Electrical permit May 2023Completed

    Kitchen renovation. relocate existing wiring to accommodate new cabinets and appliance layout. delete old recessed lighting as per 2017 nec

  9. Plumbing permit May 2023Completed

    Change two (2) water closets and kitchen sink.

  10. Commercial building permit May 2023Completed

    For the replacement of fixtures and finishes in apt 6ne as shown on application/plans. all work to be done in accordance with the 2018 iebc. separate permit required for mep work.

  11. Fire suppression permit Feb 2023Completed

    Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans. relocate (18) sprinkler heads as per nfpa 13

  12. Mechanical / fuel gas permit Feb 2023Completed

    To replace spiral ductwork with concealed rectangular ductwork and for the installation of registers, diffusers, and appliances with associated ductwork. appliances to be installed in accordance with manufacturer's specifications. all work to be done per approved plans. if field conditions vary contact design engineer prior to the start of any work. separate permits required for all other work.

Philadelphia Department of Licenses and Inspections

Safety and environment

Major airport

6.9 mi

Philadelphia International (PHL). Aircraft may be audible under approach paths.

FAA large-hub airports

Sunlight

How the sun hits 220 West Washington Square, Philadelphia

Building typeApartment building

Have you lived here? Share your experience.

Leave a review

The Address Story

Every address has a context. Read its story.

Checking...

How much it costs to live here

Price, rent, mortgage, and the city's economic context, all in one place.

The money at this address

Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.

Estimated monthly rent–
Rent per square foot–
Rent per year–

Enter a rent and the yield calculation fills in on its own.

View sunlight on the mapThe report is free, with a Google account. The PDF also includes the QR code to the sunlight simulation.

Loan calculator for this address

Enter the listing price. The calculation uses only your numbers.

Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.

More on West Washington Square

All addresses

Viewing recommendations

What's worth checking in person before deciding.

  • Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
  • Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
  • Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
  • Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
  • Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
  • Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.

Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.