22 South 40th Street, Philadelphia
technical data · neighborhood and transit
Quick answers
- Does 22 South 40th Street have open permits or code violations?
- Philadelphia Department of Licenses and Inspections lists 60 permits, 6 not closed, and 60 violations, 24 open.
- What is the 2026 conforming loan limit in Philadelphia County?
- $832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
- Is radon a problem here?
- EPA radon zone 2, moderate potential.
- What natural disasters is 22 South 40th Street at risk for?
- FEMA's National Risk Index rates the area relatively moderate overall, with elevated inland flooding and heat wave risk.
Permits and code violations
6 permits not closed out. Unfinished permits pass to the next owner. 24 open violations.
- Electrical permit Jan 2026Completed
-furnish and install: -second floor add (2) additional recessed lights in the training area -remove and dispose of existing 4' led fixtures- safe off -install dimmer switch to control recessed lighting in training area -add (2) 15" ceiling fixtures over the reception area, controlled by dimmer -furnish and install: -demo all existing hanging mc wiring and lighting from the current 3rd flr office space -reconnect lighting and power circuits for existing rooms -remove all old lighting fixtures and boxes -install wiring for wall mounted tv and in -floor power/data outlets in the conference room -install new lighting and switch with dimming in the conference room -install outlets per plan in the conference room -install a dedicated circuit for copier area and outlet on the countertop -install hanging pendant light at copier -in office area, install three 12' hanging pendants in open office area (fixture supplied by others) -install outlets and (2) dedicated circuits for for open office area - install convenience outlet in new walls as required by code -relocate 4' led fixture to new hallway, matching existing conditions -install exit and emergency lighting for egress and life safety path from the office -relocate outlets and switches in electrical room and install new light switch and fixture in closet -install (4) fire alarm horn/strobe in new areas and new walls. system integrated with existing fire alarm panels includes all necessary programing. -install all switches and dimmers per plan furnish and install: -power wiring for (9) outlets in training area -(2) 20a dedicated outlet for laptops -install (2) 20a siemens breakers; locations per plan -lighting in training area (3) 6" wafer lights and 4' linear led hanging lights, add new switch location for training area -remove 8' led fixture from the lobby, install 11" surface mounted fixture at entrance -add 9" led light over reception area and add 9" fixture in
- Fire suppression permit Nov 2025Completed
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans. relocation of 2 sprinkler heads
- Commercial building permit Aug 2025Completed
For level ii alterations with no change in occupancy. separate permits required for mechanical, electrical, plumbing and fire suppression.
- Fire suppression permit May 2025Completed
Ez kitchen fire suppression- for the installation of new wet chemical kitchen fire suppression system as per attached standard. deviations from these standards require submission of construction and site plans. install a wet chemical kitchen fire suppression system for a 5' hood system.
- Plumbing permit Dec 2024Completed
Installl 2 fd, 5 sinks, 2 wc, 2 lav, 1 hwh and 1 grease trap 13 fixtures all work performed in compliance with 2018 ppc and approved plans.
- Electrical permit Oct 2024Completed
Install normal & emergency light fixtures. install switches & receptacles. provide power for the hvac & kitchen equipment. install new fire alarm devices on the existing building fire alarm system. all work in accordance with the 2017 nec. * the 200 amp service & panel are existing. *** the fire alarm panel is existing.
- Mechanical / fuel gas permit Oct 2024Completed
For the installation of commercial kitchen hood type i (5 ft) with associated ductwork. appliances to be installed in accordance with the manufacturer’s specifications. all work to be done per approved plans. if field conditions vary contact design engineer prior to the start of any work. separate permits to be obtained for all other work.
- Commercial building permit Aug 2024Completed
For level ii alteration on the 1st floor to create a prepared food shop as per approved plans. building is not sprinklered. separate permits required for mep work.
- Zoning permit Jul 2024Issued
Eating and drinking establishments - prepared food shop
- General permit minor Apr 2024Completed
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall result in permit revocation. a separate permit from the philadelphia department of streets is required for any sidewalk and street closures. all means of pedestrian protection required at the site in accordance with the philadelphia building code chapter 33 shall be in place prior to start of work.
- Administrative permit Dec 2023Expired
For certificate of occupancy for sit-down restaurant and two (2) dwelling units above in existing attached structure. no work on this permit.
- Fire suppression permit Oct 2022Completed
Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans. relocate 12 sprinklers to match the interior alteration per nfpa 13
Philadelphia Department of Licenses and Inspections
Safety and environment
FEMA natural hazard risk
Relatively Moderate
Highest for this area: inland flooding, heat wave, cold wave, winter weather. These drive insurance cost here.
FEMA National Risk Index, census tract
Leaking fuel tanks
5 within 1,650 ft
Nearest: Parks Sausage Co, 4200 Sansom St (1,050 ft), open. 1 still open. Ask whether groundwater or soil vapor testing was done.
EPA UST Finder, leaking underground storage tank releases
Radon potential
Moderate
Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.
EPA and USGS Geologic Radon Potential Map
Nearest public schools
950 ft
Robeson HS for Human Services (950 ft), Penn Alexander Sch (2,050 ft), Powel Samuel Sch (2,350 ft). Confirm the assigned school with the district.
U.S. Department of Education, NCES
Major airport
6.2 mi
Philadelphia International (PHL). Aircraft may be audible under approach paths.
FAA large-hub airports
Conforming loan limit 2026
$832,750
Philadelphia County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.
FHFA Conforming Loan Limit Values, one-unit
Have you lived here? Share your experience.
Leave a reviewThe Address Story
Every address has a context. Read its story.
How much it costs to live here
Price, rent, mortgage, and the city's economic context, all in one place.
The money at this address
Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.
Enter a rent and the yield calculation fills in on its own.
Loan calculator for this address
Enter the listing price. The calculation uses only your numbers.
Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.
More on South 40th Street
All addressesViewing recommendations
What's worth checking in person before deciding.
- Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
- Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
- Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
- Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
- Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
- Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.
The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.