2154 West Nedro Avenue, Philadelphia
technical data · neighborhood and transit
Quick answers
- Does 2154 West Nedro Avenue have open permits or code violations?
- Philadelphia Department of Licenses and Inspections lists 24 permits, 2 not closed, and 31 violations, 9 open.
- What is the 2026 conforming loan limit in Philadelphia County?
- $832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
- Is radon a problem here?
- EPA radon zone 1, the highest potential. Test for radon before you buy.
- What natural disasters is 2154 West Nedro Avenue at risk for?
- FEMA's National Risk Index rates the area relatively moderate overall, with elevated heat wave and cold wave risk.
Permits and code violations
2 permits not closed out. Unfinished permits pass to the next owner. 9 open violations.
- General permit minor Mar 2026Completed
Ez permit re-roofing- for the installation of new roof coverings on exiting roofs as per attached standard. deviations from these standards require submission of construction and site plans. streets department permit is required for any sidewalk and street closures. sheathing must comply with standard and not exceed allowable amount or need a new permit with plans.
- General permit minor Jan 2026Completed
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall result in permit revocation. a separate permit from the philadelphia department of streets is required for any sidewalk and street closures. all means of pedestrian protection required at the site in accordance with the philadelphia building code chapter 33 shall be in place prior to start of work.
- Mechanical / fuel gas permit Jul 2025Completed
Ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site plans. each hvac unit to be self-contained within each dwelling unit. no penetrations of rated assemblies. removal and replacement of unit, one appliance, no ductwork required, 2.5 ton unit, to be installed.
- Plumbing permit Jul 2025Completed
Replace electric water heater.
- General permit minor Jun 2025Expired
Ez permit re-roofing- for the installation of new roof coverings on existing roofs as per attached standard. deviations from these standards require submission of construction and site plans. replacement of sheathing in excess of 10% of roof area shall not be applicable to the ez permit process. remove existing roof layers, replace any damaged wood decking with 3/4" cdx plywood(up to 10% only), install new insulation board to wood decking, install new rubber roofing, install new edge metal, install new eve box and drain leaders
- Electrical permit Jun 2025Completed
Fishing circuit for bed room 2&3 and dining room per nec adding 220v circuit for dryer in unfinished basement. replacing damaged outlets, marking and labeling panel and adding grounding rods per nec. amendment: install 2 branch circuits, one for hot water heater and one for the electric furnace. all work to be done according to the 2017 nec. amend replace damaged service with new 200 amp service and run line for electric range fishing only amend replace damaged service with new 200 amp service and run line for electric range
- Plumbing permit Nov 2022Completed
Install 40 gallon gas water heater
- Plumbing permit Sep 2022Completed
Repair / replace fai
- Plumbing permit Jan 2018Completed
Replace house drain, curb trap, fai & rain conductor pa20180242834 self certification no longer accepted all trenches in excess of 5 ft must have approved shoring at the time of inspection
- Electrical permit Jan 2018Completed
100a service, 3- receptacles, 2- switches, 1- 110v smoke detector, 2- 10/year smoke detector, replace 12- receptacles, 4- fixtures... per 2008 nec for a one family building
- Plumbing permit Dec 2017Completed
Replacement of full 3/4" copper water service pa20173391918(sfd)
- Plumbing permit Mar 2017Completed
Replace curb trap pa20170661205 (sfd)self certification's are no longer permitted","all excavations and plumbing trenches in excess of 5 ft in depth must have approved shoring in place at the time of inspection"
Philadelphia Department of Licenses and Inspections
Safety and environment
FEMA natural hazard risk
Relatively Moderate
Highest for this area: heat wave, cold wave. These drive insurance cost here.
FEMA National Risk Index, census tract
Toxic release facility
4,100 ft
Viz Manufacturing Co. Reports chemical releases to air, water or land to EPA each year.
EPA Toxics Release Inventory
Radon potential
High
Average indoor levels here can exceed 4 pCi/L, EPA's action level. A $15 test kit settles it before you buy.
EPA and USGS Geologic Radon Potential Map
Nearest public schools
1,900 ft
Pennell Joseph Sch (1,900 ft), Mastery CS-Francis D. Pastorius Elementary (2,000 ft), Imhotep Institute CHS (2,200 ft). Confirm the assigned school with the district.
U.S. Department of Education, NCES
Conforming loan limit 2026
$832,750
Philadelphia County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.
FHFA Conforming Loan Limit Values, one-unit
Have you lived here? Share your experience.
Leave a reviewThe Address Story
Every address has a context. Read its story.
How much it costs to live here
Price, rent, mortgage, and the city's economic context, all in one place.
The money at this address
Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.
Enter a rent and the yield calculation fills in on its own.
Loan calculator for this address
Enter the listing price. The calculation uses only your numbers.
Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.
More on West Nedro Avenue
All addressesViewing recommendations
What's worth checking in person before deciding.
- Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
- Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
- Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
- Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
- Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
- Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.
The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.