Philadelphia

2139 Ridge Avenue, Philadelphia

technical data · neighborhood and transit

Loading map…
2139 Ridge Avenue, PhiladelphiaOpen map

Quick answers

Does 2139 Ridge Avenue have open permits or code violations?
Philadelphia Department of Licenses and Inspections lists 31 permits, 12 not closed, and 60 violations, 18 open.
What is the 2026 conforming loan limit in Philadelphia County?
$832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
Is radon a problem here?
EPA radon zone 2, moderate potential.
What natural disasters is 2139 Ridge Avenue at risk for?
FEMA's National Risk Index rates the area very low overall, with elevated heat wave risk.

Permits and code violations

12 permits not closed out. Unfinished permits pass to the next owner. 18 open violations.

  1. Commercial building permit Oct 2026Completed

    To legalize level ii interior alterations for the use of mercantile occupancy with rear accessory storage on the first floor of an existing building. alterations to include the erection of partition walls, provide finishes/ furnishings and accessibility improvments throughout. all work to be done per approved plans. if field conditions vary contact design engineer prior to the start of any work. separate permits to be obtained for all other work.

  2. Plumbing permit Sep 2026Completed

    Approved plumbing repair work per ez permit standard for plumbing installation of 5" sanitary, 6" storm building trap, installation of 1" water service installation of backflow prevention device

  3. Zoning permit Aug 2026Issued

    Retail sales - food, beverages, and groceries; retail sales - consumer goods

  4. Electrical permit Aug 2025Issued

    Install a 400 amp 120/ 240v 1 phase service, (5) gang meter bank, (4) 150 amp panels & feeders, (1) 100 amp panel & feeder. install wiring throughout the common areas commercial space & three dwelling units. install lights, normal & emergency, switches, sensors, receptacles, & smoke alarms. provide power for the mechanical & hvac equipment. install a new addressable fire alarm system. all work in accordance with the 2017 nec & 2016 nfpa-72.

  5. Zoning permit Jul 2025Amendment requested

    Retail sales - food, beverages, and groceries

  6. Administrative permit Mar 2025Completed

    Co only for a group e child care center with no more than 4 kids less than 2-1/2 years old accepted at any time. half wall construction included within the permit. separate permits required for any mep work. building is fully sprinklered.

  7. Zoning permit Feb 2025Issued

    Public, civic, and institutional - community center

  8. Zoning permit Oct 2024Issued

    Child care - child care center

  9. Plumbing permit Dec 2023Completed

    Install 4 water closets, 4 lavatories, 3 shower./tubs, 3 washing machine boxes, 4 floor draina, 3 kitchen sinks,1 sump pump, 1 backflow preventer, 1 sand intterceptor, 4 hot water heaters and 4 roof drains according to the 2018 ppc and per plans.

  10. Mechanical / fuel gas permit Dec 2023Completed

    For the installation of a new hvac system including heat pumps, air handker units, exhaust fans, registers and diffusers with associated ductwork and accessories as per plans.

  11. Electrical permit Aug 2023Completed

    Install 400 amp service, (5) gang meter bank, (1) 200 amp panel & feeder, (3) 125 amp panels & feeders, (1) 100 amp panel & feeder. install wiring throughout the common areas, commercial space, & three dwelling units. install lights normal & emergency, switches, sensors, receptacles, & smoke alarms. provide power for the mechanical & hvac equipment. install a new fire alarm system throughout.all work in accordance with the 2017 nec & 2016 nfpa-72.

  12. Plumbing permit Aug 2023Issued

    5 full bath and 4 kitchen sink

Philadelphia Department of Licenses and Inspections

Safety and environment

FEMA natural hazard risk

Very Low

Highest for this area: heat wave. These drive insurance cost here.

FEMA National Risk Index, census tract

Leaking fuel tanks

1 within 1,650 ft

Nearest: Fire Site 186, 1900 W Oxford St (1,150 ft), no further action. Every release here is closed by the state regulator.

EPA UST Finder, leaking underground storage tank releases

Radon potential

Moderate

Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.

EPA and USGS Geologic Radon Potential Map

Nearest public schools

1,550 ft

Meade Gen George C Sch (1,550 ft), Vaux HS: A Big Picture School (1,550 ft), Alliance for Progress CS (1,800 ft). Confirm the assigned school with the district.

U.S. Department of Education, NCES

Major airport

8.3 mi

Philadelphia International (PHL). Aircraft may be audible under approach paths.

FAA large-hub airports

Conforming loan limit 2026

$832,750

Philadelphia County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.

FHFA Conforming Loan Limit Values, one-unit

Sunlight

How the sun hits 2139 Ridge Avenue, Philadelphia

Have you lived here? Share your experience.

Leave a review

The Address Story

Every address has a context. Read its story.

Checking...

How much it costs to live here

Price, rent, mortgage, and the city's economic context, all in one place.

The money at this address

Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.

Estimated monthly rent–
Rent per square foot–
Rent per year–

Enter a rent and the yield calculation fills in on its own.

View sunlight on the mapThe report is free, with a Google account. The PDF also includes the QR code to the sunlight simulation.

Loan calculator for this address

Enter the listing price. The calculation uses only your numbers.

Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.

More on Ridge Avenue

All addresses

Viewing recommendations

What's worth checking in person before deciding.

  • Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
  • Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
  • Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
  • Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
  • Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
  • Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.

Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.

The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.