2131 West Pacific Street, Philadelphia
technical data · neighborhood and transit
Quick answers
- Does 2131 West Pacific Street have open permits or code violations?
- Philadelphia Department of Licenses and Inspections lists 22 permits, 3 not closed, and 12 violations, 1 open.
- What is the 2026 conforming loan limit in Philadelphia County?
- $832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
- Is radon a problem here?
- EPA radon zone 1, the highest potential. Test for radon before you buy.
- What natural disasters is 2131 West Pacific Street at risk for?
- FEMA's National Risk Index rates the area relatively moderate overall, with elevated heat wave and cold wave risk.
Permits and code violations
3 permits not closed out. Unfinished permits pass to the next owner. 1 open violation.
- Plumbing permit May 2026Completed
Repair/replace ct & fai.
- Mechanical / fuel gas permit Oct 2024Completed
For installation of hvac equipment, applicances, ductwork and registers/diffusers per approved plans and manufacturer's specifications.
- Fire suppression permit Oct 2024Completed
For the installation of a fire suppression system in accordance with nfpa 13r throughout the entire building with 2” fire service and 2" backflow prevention assembly. all work shall comply with the approved plans. all work shall be performed by a fire suppression contractor licensed by the city of philadelphia.
- Fire suppression permit Oct 2024Completed
Rough-in permit for fp-2024-002092 install new 2" fire service from street to building supply and install all required sprinklers per nfpa 13r supply and install all required piping, hangers and fittings per nfpa 13r supply and install new 2" city-approved backflow preventer supply and install new fire department connection supply and install all required bells, tampers and flow switches
- Plumbing permit Sep 2024Completed
3 kitchen sinks, 3 water closets, 3 lavatories & 3 shower/tubs.
- Electrical permit Aug 2024Completed
Install 400 amp service .wire throughout ,em.lighting, 110v interconnected smoke alarms .install complete fire alarm system w/ low frequency sound in all living rms and bedrooms, tamper switch ,flow switch. all work is to be done according to approved drawings-2017 nec,2016 nfpa-72,2018 phila fire code.
- Commercial building permit Dec 2023Completed
For level iii interior alterations with a complete change in use & occupancy classification to group r-2 three (3) family dwelling. all work to be done per approved plans and in accordance with 2018 iebc. building to be fully sprinklered per nfpa 13r. separate permits required for mechanical, electrical, plumbing, and fire suppression work. if site conditions vary, contact design professional prior to start of work.
- Electrical permit Feb 2023Completed
Replace 100 amp service and panel install dedicated line using wire mold for stair glide as per nec 2017
- Zoning permit Mar 2022Issued
Residential - household living - multi-family
- Plumbing permit Aug 2020Expired
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall result in permit revocation. a separate permit from the philadelphia department of streets is required for any sidewalk and street closures. all means of pedestrian protection required at the site in accordance with the philadelphia building code chapter 33 shall be in place prior to start of work.
- Plumbing permit Sep 2019Completed
Replace house trap and fai-pa1#20192631558-"self-certification's are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection"
- Alteration permit Mar 2017Completed
New framing/partition walls, new windows, flooring, sheetrock, spackle, paint.
Philadelphia Department of Licenses and Inspections
Safety and environment
FEMA natural hazard risk
Relatively Moderate
Highest for this area: heat wave, cold wave, winter weather. These drive insurance cost here.
FEMA National Risk Index, census tract
Leaking fuel tanks
3 within 1,650 ft
Nearest: Fire Site 201, Hunting Park Ave & Schuyler St (350 ft), no further action. Every release here is closed by the state regulator.
EPA UST Finder, leaking underground storage tank releases
Brownfield site
1,150 ft
Project H O M E and 6 more within half a mile. Former industrial land in EPA's cleanup and reuse program.
EPA ACRES Brownfields
Toxic release facility
950 ft
Rexnord Corp Geared Prods Div and 4 more within a mile. Reports chemical releases to air, water or land to EPA each year.
EPA Toxics Release Inventory
High-voltage line
850 ft
230 kV line run by PECO ENERGY CO.
HIFLD transmission lines
Radon potential
High
Average indoor levels here can exceed 4 pCi/L, EPA's action level. A $15 test kit settles it before you buy.
EPA and USGS Geologic Radon Potential Map
Nearest public schools
1,450 ft
Mastery CS-Cleveland Elementary (1,450 ft), Mastery Prep Elementary CS (2,500 ft), Mastery CS-Gratz Campus (2,650 ft). Confirm the assigned school with the district.
U.S. Department of Education, NCES
Conforming loan limit 2026
$832,750
Philadelphia County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.
FHFA Conforming Loan Limit Values, one-unit
Have you lived here? Share your experience.
Leave a reviewThe Address Story
Every address has a context. Read its story.
How much it costs to live here
Price, rent, mortgage, and the city's economic context, all in one place.
The money at this address
Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.
Enter a rent and the yield calculation fills in on its own.
Loan calculator for this address
Enter the listing price. The calculation uses only your numbers.
Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.
More on West Pacific Street
All addressesViewing recommendations
What's worth checking in person before deciding.
- Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
- Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
- Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
- Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
- Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
- Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.
The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.