6 permits not closed out. Unfinished permits pass to the next owner. 17 open violations.
- Zoning permit Jun 2026Issued
For the erection of an attached structure with roof deck and roof deck access structure. size and location as shown in plan.
- Zoning permit Jun 2026Issued
Complete demolition to create vacant lot
- General permit minor Sep 2022Expired
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall result in permit revocation. a separate permit from the philadelphia department of streets is required for any sidewalk and street closures. all means of pedestrian protection required at the site in accordance with the philadelphia building code chapter 33 shall be in place prior to start of work.
- General permit minor Oct 2020Completed
Ez exterior wall coverings- for the applications of exterior wall coverings as per attached standards. deviations from these standards require submission of construction and site plans.
- Plumbing permit Nov 2019Completed
House trap fai as per 2004 ppc
- Alteration permit Jun 2019Completed
Stucco removal on bumpouts and replace with vinly hardie siding
- Alteration permit Dec 2016Completed
For the placement of underpinning and curb in the basement of an existing single family dwelling as per engineer's plans,
- Mechanical permit Mar 2016Completed
Install 65,000 btu furnace with 95% payne, with 2 ton coil, and 2 ton condenser with related duct work
- Electrical permit Mar 2016Completed
Install 200 amp service line meter box and new panel box and wiring throughout per 2008 nec (sfd)south district
- Plumbing permit Feb 2016Completed
Replace soil and waste pipes & hot and cold water lines for 2 water closet, 2 lavy sink, 1 bath tub, 1 kitchen sink, 1 cess pool & 1 laundry tub -.all work shall comply with the philadelphia plumbing code 2004
- Alteration permit Jan 2016Completed
New brick front masonry front wall - remove existing front masonry wall. replace with new 8 inch masonry wall, (4" brick & 4" block) on existing foundation. windows and doors to comply with emergency egress standards per irc.. new door opening for 36 inch door. flash roof to new front. vertical reinforcement every 24 inches. install returns into party walls for structural connection. flash and seal roof. install 2 x 4 frame wall, r-19 insulation and sheetrock on interior front wall for finish. no other work allowed under this permit.
- Residential building permit Dec 2015Issued
For interior/exterior renovations to existing 2 story single family dwelling. the basement is non-habitable utilty space. this work activity shall be performed by contractors and sub-contractors licensed by the city of philadelphia or registered hic with the state atorney generals office. **post this permit** post the project information sign**
Philadelphia Department of Licenses and Inspections
Safety and environment
Major airport
5.9 mi
Philadelphia International (PHL). Aircraft may be audible under approach paths.
FAA large-hub airports
Have you lived here? Share your experience.
Leave a reviewThe Address Story
Every address has a context. Read its story.
How much it costs to live here
Price, rent, mortgage, and the city's economic context, all in one place.
The money at this address
Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.
Enter a rent and the yield calculation fills in on its own.
Loan calculator for this address
Enter the listing price. The calculation uses only your numbers.
Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.
More on Catharine Street
All addressesViewing recommendations
What's worth checking in person before deciding.
- Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
- Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
- Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
- Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
- Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
- Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.
The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.