Philadelphia

209 Linton Street, Philadelphia

technical data · neighborhood and transit

Loading map…
209 Linton Street, PhiladelphiaOpen map

Permits and code violations

1 permit not closed out. Unfinished permits pass to the next owner. 7 open violations.

  1. Electrical permit Oct 2024Completed

    Replace existing circuit breaker panel with new 100 amp circuit breaker panel. reconnect all existing branch circuits according to the 2017 nec.

  2. Electrical permit Jan 2024Expired

    Installation of solar array in accordance with signed standard.

  3. Electrical permit Jan 2023Completed

    Install dedicated line using wire mold replace 10 switches replace 3 light fixtures install carbon/smoke detector in basement as per nec 2017

  4. Plumbing permit Dec 2022Completed

    Repair/replace 3/4" wdp

  5. Plumbing permit Dec 2022Completed

    Under floor plumbing, replace tub, toilet and sink

  6. General permit minor Dec 2022Completed

    For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall result in permit revocation. a separate permit from the philadelphia department of streets is required for any sidewalk and street closures. all means of pedestrian protection required at the site in accordance with the philadelphia building code chapter 33 shall be in place prior to start of work.

  7. Plumbing permit Apr 2016Completed

    Install new 3/4" water service full-pa1#20161021373-"self-certification's are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection"

  8. Alteration permit Nov 2014Completed

    Permit application in response to unsafe violations # 452646 to comply violation, completed work is to be inspected and approved as an appropriate repair to each violation. no engineer's report submitted. licensed contractor to assume responsibility of work. no other work this permit. separate permits required for renovation. contact streets department for dumpster and/or footway closure permits.

  9. Administrative permit Sep 2013Completed

    Certification statement for a residential unit occupied by not more than three (3) people unrelated by blood, marriage or adoption

  10. Use permit May 2013Completed

    Use to family daycare

  11. Electrical permit Apr 2012Completed

    Install fire alarm system - as per 2008 nec and nflpa 72

  12. Alteration permit Apr 2008Completed

    Installation of roll down security gates (6)

Philadelphia Department of Licenses and Inspections

Sunlight

How the sun hits 209 Linton Street, Philadelphia

Have you lived here? Share your experience.

Leave a review

The Address Story

Every address has a context. Read its story.

Checking...

How much it costs to live here

Price, rent, mortgage, and the city's economic context, all in one place.

The money at this address

Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.

Estimated monthly rent–
Rent per square foot–
Rent per year–

Enter a rent and the yield calculation fills in on its own.

View sunlight on the mapThe report is free, with a Google account. The PDF also includes the QR code to the sunlight simulation.

Loan calculator for this address

Enter the listing price. The calculation uses only your numbers.

Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.

More on Linton Street

All addresses

Viewing recommendations

What's worth checking in person before deciding.

  • Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
  • Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
  • Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
  • Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
  • Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
  • Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.

Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.

The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.