Permits and code violations
9 permits not closed out. Unfinished permits pass to the next owner. 10 open violations.
- Mechanical / fuel gas permit Apr 2026Completed
Ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site plans. install 1 condenser r5a436akana-yard, evd5x36m17a coil-rear basement, n92msn081716 heater -rear basement, 1200 cfm, 3 ton, 80,000btu, 12 registers/diffusers.
- Plumbing permit Mar 2026Completed
New drainage (pvc) and water lines (pex) from foundation wall inside building to 1.5 bathrooms kitchen, new back yard drain & new area drain.
- Electrical permit Mar 2026Completed
200 amp service full rewire unfinished basement
- Residential building permit Feb 2026Completed
Ez permit standards alterations- for alterations to an existing one family dwelling as per attached standard. deviations from this standard will result in permit revocation and require submission of construction plans. separate permits are required for plumbing and electrical work and the installation of heating/cooling appliances. structural alteration or repair is expressly prohibited under this permit. prohibited structural work includes any modification to exterior walls, party walls, floor/roof framing or foundations; including underpinning, excavation, and removal of foundation slab.no work may be performed in the basement or cellar.
- Plumbing permit Jan 2026Completed
New construction build - running new interior drains and water basement water heater-1 lav-1 wc-1 tub-1 ejector pump-1 first floor ks-1 icebox-1 range-1 gas second floor tub-1 lav-1 wc-1 wb-1 dryer-1 gas utillity sink-1 fd-1 third floor soaker tub-1 double vanity-1 shower-1 wc-1 roof hb-1
- General permit minor Jan 2026Expired
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall result in permit revocation. a separate permit from the philadelphia department of streets is required for any sidewalk and street closures. all means of pedestrian protection required at the site in accordance with the philadelphia building code chapter 33 shall be in place prior to start of work.
- Electrical permit Dec 2025Completed
Install 200 amp service, wiring throughout, install light fixtures, outlets, switches, smoke detectors, grounding system.
- Mechanical / fuel gas permit Nov 2025Completed
Ez permit ductwork & warm-air appliances - for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site plans. install 92% 40k btu gas furnace, 2 ton ac, ductwork, & 18 diffusers
- Plumbing permit Sep 2025Completed
Install ct, fai, md & 1" wdp.
- Fire suppression permit Mar 2022Completed
Install new fire suppression system and 1” combined service in accordance with nfpa 13d throughout the entire building. all work shall comply with the approved plans. all work shall be performed by a fire suppression contractor licensed by the city of philadelphia.
- Residential building permit Dec 2020Completed
Erection of an attached structure for use as single family household living. sheeting and shoring as prescribed in geo tech report. separate permits required for electrical, mechanical, plumbing and sprinkler (13d) work. underpinning is part of this permit with continuance inspections. energy code compliance in accordance with 2015 iecc. prior to issuance of c.o submittal of air barrier checklist and envelope testing certificate is required. both to be completed by an approved party.**3/23/23-amend permit to change special inspector and dprc-si**no other changes approved on this permit****3/26/25-amend for existing foundation to be used as per engineer report that were complete prior to match footprint as per approved zoning. addition of energy sheets to meet the 2018 international energy conservation code (iecc). change in roof type from vented to non-vented roof the initial design included a vented roof system; however, we have revised this to a non-vented roof system. addition of general notes and specification sheets a0.1,a0.2, and a0.3. the lateral bracing design at the first floor and details at on lb1.1 have been revised***
- Mechanical / fuel gas permit Sep 2020Completed
Ez permit ductwork & warm-air appliances - for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site plans.
Philadelphia Department of Licenses and Inspections
Safety and environment
Major airport
5.6 mi
Philadelphia International (PHL). Aircraft may be audible under approach paths.
FAA large-hub airports
Have you lived here? Share your experience.
Leave a reviewThe Address Story
Every address has a context. Read its story.
How much it costs to live here
Price, rent, mortgage, and the city's economic context, all in one place.
The money at this address
Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.
Enter a rent and the yield calculation fills in on its own.
Loan calculator for this address
Enter the listing price. The calculation uses only your numbers.
Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.
More on South 9th Street
All addressesViewing recommendations
What's worth checking in person before deciding.
- Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
- Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
- Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
- Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
- Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
- Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.
The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.