Philadelphia

2002 North Leithgow Street, Philadelphia

technical data · neighborhood and transit

Loading map…
2002 North Leithgow Street, PhiladelphiaOpen map

Quick answers

Does 2002 North Leithgow Street have open permits or code violations?
Philadelphia Department of Licenses and Inspections lists 31 permits, 5 not closed, and 59 violations, 15 open.
What is the 2026 conforming loan limit in Philadelphia County?
$832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
Is radon a problem here?
EPA radon zone 2, moderate potential.
What natural disasters is 2002 North Leithgow Street at risk for?
FEMA's National Risk Index rates the area relatively low overall, with elevated heat wave risk.

Permits and code violations

5 permits not closed out. Unfinished permits pass to the next owner. 15 open violations.

  1. Zoning permit Aug 2025Issued

    For consolidation of lot line to create one (1) parcel (lot-1) from existing two (2) deeded lots (407 w norris st and 409-11 w norris st). size and location as shown in the application / plan.

  2. Plumbing permit Oct 2024Completed

    Replacing existing 3/4" water service

  3. Electrical permit Nov 2023Completed

    Supply and install complete new 100 amp main electrical service, including new service head, meter base, 100 amp main breaker 30 circuit panel, all related grounding, and all related parts and hardware. as per nec 2017

  4. Residential building permit Aug 2022Expired

    Bathroom renovation

  5. Residential building permit Jul 2022Expired

    For the erection of an attached slab on grade structure. size and locaiton as shown on plans.

  6. General permit minor Nov 2021Completed

    For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall result in permit revocation. a separate permit from the philadelphia department of streets is required for any sidewalk and street closures. all means of pedestrian protection required at the site in accordance with the philadelphia building code chapter 33 shall be in place prior to start of work.

  7. Mechanical / fuel gas permit Nov 2021Completed

    Ez permit ductwork & warm-air appliances for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site plans. air masters hvac will install new duct work with 80,000 btu 92% efficiency and 2.5 ton condenser located in back yard

  8. Zoning permit Nov 2021Expired

    For the erection of an attached structure with cellar and an accessory roof deck (for residential use only) with roof access structure. size and location as shown in the application / plan.

  9. Plumbing permit May 2021Completed

    Rough in water and waste for 1 full bath, 1 kitchen sink, and 1 laundry box

  10. Electrical permit May 2021Completed

    Replace 100amp panel wire throughout building for g.f.c.i outlets smoke detectors switches lighting and fixtures per n.e.c code 2014

  11. Residential building permit May 2021Completed

    For the renovation throughout of an existing semidetached 2 story single family home.

  12. General permit minor Oct 2018Expired

    Remove old roof install new roof

Philadelphia Department of Licenses and Inspections

Safety and environment

FEMA natural hazard risk

Relatively Low

Highest for this area: heat wave. These drive insurance cost here.

FEMA National Risk Index, census tract

Leaking fuel tanks

4 within 1,650 ft

Nearest: Us Capital Investments 6, 512 W Montgomery Ave (1,350 ft), open. 1 still open. Ask whether groundwater or soil vapor testing was done.

EPA UST Finder, leaking underground storage tank releases

Brownfield site

750 ft

301 309 W Berks Street and 32 more within half a mile. Former industrial land in EPA's cleanup and reuse program.

EPA ACRES Brownfields

Toxic release facility

2,200 ft

York Metal Finishing Co and 2 more within a mile. Reports chemical releases to air, water or land to EPA each year.

EPA Toxics Release Inventory

Radon potential

Moderate

Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.

EPA and USGS Geologic Radon Potential Map

Nearest public schools

700 ft

McKinley William Sch (700 ft), The U School: Innovative Lab (1,400 ft), Welsh John Sch (2,000 ft). Confirm the assigned school with the district.

U.S. Department of Education, NCES

Major airport

9.2 mi

Philadelphia International (PHL). Aircraft may be audible under approach paths.

FAA large-hub airports

Conforming loan limit 2026

$832,750

Philadelphia County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.

FHFA Conforming Loan Limit Values, one-unit

Sunlight

How the sun hits 2002 North Leithgow Street, Philadelphia

Have you lived here? Share your experience.

Leave a review

The Address Story

Every address has a context. Read its story.

Checking...

How much it costs to live here

Price, rent, mortgage, and the city's economic context, all in one place.

The money at this address

Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.

Estimated monthly rent–
Rent per square foot–
Rent per year–

Enter a rent and the yield calculation fills in on its own.

View sunlight on the mapThe report is free, with a Google account. The PDF also includes the QR code to the sunlight simulation.

Loan calculator for this address

Enter the listing price. The calculation uses only your numbers.

Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.

More on North Leithgow Street

All addresses

Viewing recommendations

What's worth checking in person before deciding.

  • Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
  • Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
  • Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
  • Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
  • Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
  • Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.

Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.

The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.