2001 Ridley Street, Philadelphia
technical data · neighborhood and transit
Permits and code violations
3 permits not closed out. Unfinished permits pass to the next owner. 3 open violations.
- General permit minor Oct 2026Issued
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall result in permit revocation. a separate permit from the philadelphia department of streets is required for any sidewalk and street closures. all means of pedestrian protection required at the site in accordance with the philadelphia building code chapter 33 shall be in place prior to start of work.
- Mechanical / fuel gas permit Oct 2026Completed
Ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site plans. replace and install 80% afue and 60,000 btu gas hot water boiler, tie into existing hydronic pipes. no new ductwork is part of this permit, appliance replacement like in kind only.
- Plumbing permit Mar 2021Completed
Replace curb trap/ fai pwd
- General permit minor Aug 2020Expired
Ez permit decks- for new decks to an existing one family dwelling as per attached standards. deviations from these standards require submission of construction and site plans. department of streets is required for any sidewalk and street closures. all means of pedestrian protection required at the site in accordance with the philadelphia building code chapter 33 shall be in place prior to start of work. *homeowner is performing work*
- Plumbing permit Sep 2019Completed
Install water heater in accordance with 2004 ppc.
- Alteration permit Jun 2015Expired
Ez permit decks- for new decks accessory to an existing one family dwelling as per attached standard. deviations from this standard will result in permit revocation and require submission of construction plans. *all work performed by owner*
- Zoning permit Jun 2015Completed
Ez permit decks- for new decks accessory to an existing one family dwelling as per attached standard. deviations from this standard will result in permit revocation and require submission of construction plans.
- Plumbing permit Aug 2013Completed
Replace 3/4" water line from main to street to curb stop to basment wall pa20132320685 (sfd)
- Plumbing permit Jun 2013Completed
Install new & removal of 2-wc, 2-lav, 2-bath tubs, & 2-kit sinks w/ water pex lines & correct violation (2fd)
- Plumbing permit Mar 2013Completed
Replace water distribution pipe from main to meter pa20130630686
- Alteration permit Oct 2011Completed
Exterior wall covering (vinyl siding).
- Plumbing permit Aug 2008Completed
Curb trap
Philadelphia Department of Licenses and Inspections
Have you lived here? Share your experience.
Leave a reviewThe Address Story
Every address has a context. Read its story.
How much it costs to live here
Price, rent, mortgage, and the city's economic context, all in one place.
The money at this address
Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.
Enter a rent and the yield calculation fills in on its own.
Loan calculator for this address
Enter the listing price. The calculation uses only your numbers.
Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.
More on Ridley Street
All addressesViewing recommendations
What's worth checking in person before deciding.
- Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
- Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
- Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
- Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
- Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
- Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.
The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.