Philadelphia

2000 East Clearfield Street, Philadelphia

technical data · neighborhood and transit

Loading map…
2000 East Clearfield Street, PhiladelphiaOpen map

Quick answers

Does 2000 East Clearfield Street have open permits or code violations?
Philadelphia Department of Licenses and Inspections lists 23 permits, 6 not closed, and 28 violations, 5 open.
What is the 2026 conforming loan limit in Philadelphia County?
$832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
Is radon a problem here?
EPA radon zone 2, moderate potential.
What natural disasters is 2000 East Clearfield Street at risk for?
FEMA's National Risk Index rates the area relatively moderate overall, with elevated heat wave and cold wave risk.

Permits and code violations

6 permits not closed out. Unfinished permits pass to the next owner. 5 open violations.

  1. Plumbing permit Feb 2026Completed

    Underfloor plumbing to 3 fixtures

  2. Electrical permit Nov 2025Completed

    Ez installation of a 15ah gfci outlet and line to power the stair lift as proposed on the parent residential building permit.

  3. Residential building permit Oct 2025Issued

    For exterior alterations to remove the existing entry steps and landing and to erect new wood-framed entry steps and landing with accessible chair lift as per approved plans and in accordance with 2018 iebc. separate permit required for electrical work. see sr-2025-031340 for streets dept. approval.

  4. Plumbing permit Aug 2025Completed

    Ez bathroom 3 piece bathroom on 2nd floor

  5. General permit minor Aug 2025Expired

    For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall result in permit revocation. a separate permit from the philadelphia department of streets is required for any sidewalk and street closures. all means of pedestrian protection required at the site in accordance with the philadelphia building code chapter 33 shall be in place prior to start of work.

  6. Commercial building permit Jul 2025Issued

    For level ii alterations per approved plans. separate permits required for mechanical, electrical and plumbing work.

  7. Electrical permit Jul 2025Completed

    Replace 200 amp panel and service replace switches, outlets and fixtures install dedicated lines using wire mold (fishing wires) replaceexterior fixtures, one with motion detector replace basement lights

  8. Zoning permit Jul 2024Issued

    Eating and drinking establishments - sit-down restaurant

  9. Electrical permit Nov 2022Completed

    Install 100 amp service and panel-32space panel, 15 ampere duplex receptacle, arc fault, ground fault receptacle and dedicated circuit, porcelain fixture, comb /afci/gfi breaker, new recep. and circuit 20 amp redistribute overloaded circuit, fishing wires through walls only per nec14

  10. Plumbing permit Sep 2022Completed

    Replace area drain and basement soil line

  11. General permit minor Sep 2022Completed

    For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall result in permit revocation. a separate permit from the philadelphia department of streets is required for any sidewalk and street closures. all means of pedestrian protection required at the site in accordance with the philadelphia building code chapter 33 shall be in place prior to start of work.

  12. Residential building permit Aug 2022Completed

    Bathroom renovation.

Philadelphia Department of Licenses and Inspections

Safety and environment

FEMA natural hazard risk

Relatively Moderate

Highest for this area: heat wave, cold wave, winter weather. These drive insurance cost here.

FEMA National Risk Index, census tract

Superfund site

1.7 mi

Franklin Slag Pile (MDC) (NPL Site). Check groundwater and vapor reports on the EPA site page.

EPA National Priorities List

Leaking fuel tanks

5 within 1,650 ft

Nearest: 506 Mastbaum Auts, 3116 Frankford Ave (550 ft), no further action. Every release here is closed by the state regulator.

EPA UST Finder, leaking underground storage tank releases

Brownfield site

400 ft

1901 W Clearfield St and 3 more within half a mile. Former industrial land in EPA's cleanup and reuse program.

EPA ACRES Brownfields

Radon potential

Moderate

Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.

EPA and USGS Geologic Radon Potential Map

Nearest public schools

500 ft

Mastbaum Jules E Area Vocational-Technical School (500 ft), Conwell Russell MS (600 ft), Willard Frances E Sch (700 ft). Confirm the assigned school with the district.

U.S. Department of Education, NCES

Conforming loan limit 2026

$832,750

Philadelphia County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.

FHFA Conforming Loan Limit Values, one-unit

Sunlight

How the sun hits 2000 East Clearfield Street, Philadelphia

Have you lived here? Share your experience.

Leave a review

The Address Story

Every address has a context. Read its story.

Checking...

How much it costs to live here

Price, rent, mortgage, and the city's economic context, all in one place.

The money at this address

Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.

Estimated monthly rent–
Rent per square foot–
Rent per year–

Enter a rent and the yield calculation fills in on its own.

View sunlight on the mapThe report is free, with a Google account. The PDF also includes the QR code to the sunlight simulation.

Loan calculator for this address

Enter the listing price. The calculation uses only your numbers.

Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.

More on East Clearfield Street

All addresses

Viewing recommendations

What's worth checking in person before deciding.

  • Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
  • Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
  • Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
  • Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
  • Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
  • Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.

Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.

The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.