Philadelphia

1919 North Marshall Street, Philadelphia

technical data · neighborhood and transit

Loading map…
1919 North Marshall Street, PhiladelphiaOpen map

Quick answers

Does 1919 North Marshall Street have open permits or code violations?
Philadelphia Department of Licenses and Inspections lists 30 permits, 5 not closed, and 60 violations, 2 open.
What is the 2026 conforming loan limit in Philadelphia County?
$832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
Is radon a problem here?
EPA radon zone 2, moderate potential.
What natural disasters is 1919 North Marshall Street at risk for?
FEMA's National Risk Index rates the area relatively moderate overall, with elevated heat wave and cold wave risk.

Permits and code violations

5 permits not closed out. Unfinished permits pass to the next owner. 2 open violations.

  1. Site / utility permit Sep 2026Issued

    Site / utility permit for cp-2026-001758

  2. Commercial building permit Aug 2026Issued

    For the erection of an attached 3-story structure with roof access structure for access to an occupiable roof deck. structure for use as multi-family household living three (3) dwelling units. the building is fully sprinklered in accordance with nfpa 13r. all work to be done per approved plans. if field conditions vary contact design engineer prior to the start of any work. separate permiits to be obtained for all other work. **a covered walkway or sidewalk closure shall be required within 9 feet of the building facade in accordance with section 3306 of the 2018 ibc. separate building and/or streets department permit required prior to the start of any work.y contact design engineer prior to the start of any work. separate permiits to be obtained for all other work. **excavation permit required** this project includes underpinning **

  3. Residential building permit Feb 2025Completed

    Make safe permit to comply with case #cf-2024-127331- for the repair of the exterior damaged portion of an existing structure as per engineer's report. abutting sidewalk must be closed with fencing a minimum of 6' in height. separate streets department permit required for sidewalk closure. a separate permit is required for any additional alterations that are not specifically addressed on case #cf-2024-127331. in accordance with code bulletin pm-1801, a pa professional engineer is required to monitor repairs made under this permit. the engineer must submit a sealed statement to the department confirming that the structure is in sound condition at completion.

  4. Electrical permit Jun 2024Completed

    Replace gfci , vanity light, shower light supply and install 1 line from panel with outlet all wiring will be fished

  5. Plumbing permit Jan 2024Completed

    Replace 3/4” k copper water line

  6. Plumbing permit Dec 2022Completed

    Seal lateral

  7. Zoning permit Oct 2022Issued

    For the erection of an attached structure with a roof deck with a roof deck access structure. size and location as shown in plan. extend for a period of one year per section 14-303(10)(d) of the philadelphia zoning code. a building permit must be obtained by 8-18-26. **amended as of 5/18/2026 as per plan**

  8. Demolition permit Jan 2022Completed

    For the complete demolition of a sfd as part of the city of philadelphia demolition program. * add'l specs: no sidewalk. 2 stucco c/w 1909 & 1900-04 n 6th st and erosion control mat with topsoil and seed on lot. party wall c/w 1900 - 04 n 6th st to be removed down to existing 1 story building height. install 6' high chain link fence c/w 1909 n 6th st to existing building at rear.

  9. Plumbing permit Aug 2020Completed

    For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall result in permit revocation. a separate permit from the philadelphia department of streets is required for any sidewalk and street closures. all means of pedestrian protection required at the site in accordance with the philadelphia building code chapter 33 shall be in place prior to start of work.

  10. Plumbing permit Jul 2020Completed

    (2) tubs, (4) showers, (6) toilets, (8) lavs, (3) washer, (3) kitchen sink. install house drain, house trap, fai, stack, hot water heater & (3) 1” combo

  11. Mechanical / fuel gas permit Jun 2020Completed

    Ez permit ductwork & warm-air appliances- for the installation if new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site plans. install 3 hvac systems, 3- 60,000 btu ac and all ductwork.

  12. Fire suppression permit Mar 2020Completed

    Install new fire suppression system complying with nfpa 13 throughout the building to include 2" main fire service line with 2" apollo dclf4a backflow prevention assembly as per approved plans. all work shall be performed by a fire suppression contractor licensed by the city of philadelphia.

Philadelphia Department of Licenses and Inspections

Safety and environment

FEMA natural hazard risk

Relatively Moderate

Highest for this area: heat wave, cold wave. These drive insurance cost here.

FEMA National Risk Index, census tract

Leaking fuel tanks

10 within 1,650 ft

Nearest: Us Capital Investments 6, 512 W Montgomery Ave (850 ft), open. 4 still open. Ask whether groundwater or soil vapor testing was done.

EPA UST Finder, leaking underground storage tank releases

Toxic release facility

3,250 ft

York Metal Finishing Co and 2 more within a mile. Reports chemical releases to air, water or land to EPA each year.

EPA Toxics Release Inventory

Historic listing nearby

150 ft

Pringle Electrical Manufacturing Company Building. Exterior changes can need preservation review; listed buildings can qualify for rehabilitation tax credits.

National Park Service, National Register

Radon potential

Moderate

Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.

EPA and USGS Geologic Radon Potential Map

Nearest public schools

650 ft

The U School: Innovative Lab (650 ft), McKinley William Sch (1,550 ft), Dunbar Paul L Sch (2,600 ft). Confirm the assigned school with the district.

U.S. Department of Education, NCES

Major airport

9.0 mi

Philadelphia International (PHL). Aircraft may be audible under approach paths.

FAA large-hub airports

Conforming loan limit 2026

$832,750

Philadelphia County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.

FHFA Conforming Loan Limit Values, one-unit

Sunlight

How the sun hits 1919 North Marshall Street, Philadelphia

Have you lived here? Share your experience.

Leave a review

The Address Story

Every address has a context. Read its story.

Checking...

How much it costs to live here

Price, rent, mortgage, and the city's economic context, all in one place.

The money at this address

Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.

Estimated monthly rent–
Rent per square foot–
Rent per year–

Enter a rent and the yield calculation fills in on its own.

View sunlight on the mapThe report is free, with a Google account. The PDF also includes the QR code to the sunlight simulation.

Loan calculator for this address

Enter the listing price. The calculation uses only your numbers.

Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.

More on North Marshall Street

All addresses

Viewing recommendations

What's worth checking in person before deciding.

  • Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
  • Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
  • Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
  • Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
  • Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
  • Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.

Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.

The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.