1907 Brown Street, Philadelphia
technical data · neighborhood and transit
Quick answers
- Does 1907 Brown Street have open permits or code violations?
- Philadelphia Department of Licenses and Inspections lists 60 permits, 6 not closed, and 51 violations, 1 open.
- What is the 2026 conforming loan limit in Philadelphia County?
- $832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
- Is radon a problem here?
- EPA radon zone 2, moderate potential.
- What natural disasters is 1907 Brown Street at risk for?
- FEMA's National Risk Index rates the area relatively moderate overall, with elevated inland flooding and heat wave risk.
Permits and code violations
6 permits not closed out. Unfinished permits pass to the next owner. 1 open violation.
- Mechanical / fuel gas permit Sep 2026Issued
Ez permit ductwork & warm-air appliances- for the installation if new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site plans.
- Plumbing permit Sep 2026Issued
Plumbing permit (interior) for combo rp-2026-007805
- Plumbing permit Aug 2026Completed
- approved plumbing repair work per ez permit standard for plumbing. repair/replace ct, fai & md.
- Electrical permit Aug 2026Issued
Electrical permit for combo rp-2026-007805
- Residential building permit Jul 2026Issued
Interior alterations to the existing 3 story single family dwelling, details as shown in the plan.
- Electrical permit May 2026Completed
Rewire single family home
- General permit minor Apr 2026Amendment application incomplete
Ez interior demolition- for the interior demolition on non-bearing partition wall and ceilings as per attached standard. deviations from these standards require submission of construction and site plans. structural alteration or repair is expressly prohibited under this permit. prohibited structural work includes but not limited to any modification to exterior walls, party wall, floor/roof framing and foundations, including underpinning, excavation and removal of foundation slab. separate streets department permit required for sidewalk and street closures.
- General permit minor Mar 2026Completed
Ez interior non-load-bearing wall demolition - for the interior demolition on non-load-bearing partition walls and ceilings as per attached standard. deviations from these standards require submission of construction and site plans. structural alteration or repair is expressly prohibited under this permit. prohibited structural work includes but not limited to any modification to exterior walls, party wall, floor/roof framing and foundations, including underpinning, excavation and removal of foundation slab. separate streets department permit required for sidewalk and street closures.
- Plumbing permit Mar 2026Completed
Install/replace 4-wc, 4-lav, 3-shower/tub, 1-ks, 1-ls & 1-hwh.
- Mechanical / fuel gas permit Mar 2026Completed
Mechanical / fuel gas permit for combo rp-2025-012705
- Residential building permit Mar 2026Completed
For the erection of an addition and for interior and exterior alterations to an existing attached single-family dwelling per plans. separate permits are required for all associated mechanical, electrical, and plumbing work. basement to remain non-habitable, to be used for storage and utilities only.
- Zoning permit Jan 2026Completed
For the erection of a rear addition to include roof deck and roof deck access structure to an existing attached structure. size and location as shown in application/plans
Philadelphia Department of Licenses and Inspections
Safety and environment
FEMA natural hazard risk
Relatively Moderate
Highest for this area: inland flooding, heat wave. These drive insurance cost here.
FEMA National Risk Index, census tract
Leaking fuel tanks
3 within 1,650 ft
Nearest: Amoco Sta Phila Ridge Ave, 1840 Ridge Ave (1,400 ft), open. 2 still open. Ask whether groundwater or soil vapor testing was done.
EPA UST Finder, leaking underground storage tank releases
Brownfield site
250 ft
835 87 N 19th Street 1825 Wylie Street and 1 more within half a mile. Former industrial land in EPA's cleanup and reuse program.
EPA ACRES Brownfields
Toxic release facility
2,800 ft
Smithkline Beecham Pharmaceuticals. Reports chemical releases to air, water or land to EPA each year.
EPA Toxics Release Inventory
High-voltage line
600 ft
138 kV line run by PECO ENERGY CO.
HIFLD transmission lines
Radon potential
Moderate
Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.
EPA and USGS Geologic Radon Potential Map
Nearest public schools
1,350 ft
Bache-Martin Sch (1,350 ft), Waring Laura W Sch (1,600 ft), Franklin LC (2,150 ft). Confirm the assigned school with the district.
U.S. Department of Education, NCES
Major airport
7.7 mi
Philadelphia International (PHL). Aircraft may be audible under approach paths.
FAA large-hub airports
Conforming loan limit 2026
$832,750
Philadelphia County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.
FHFA Conforming Loan Limit Values, one-unit
Have you lived here? Share your experience.
Leave a reviewThe Address Story
Every address has a context. Read its story.
How much it costs to live here
Price, rent, mortgage, and the city's economic context, all in one place.
The money at this address
Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.
Enter a rent and the yield calculation fills in on its own.
Loan calculator for this address
Enter the listing price. The calculation uses only your numbers.
Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.
More on Brown Street
All addressesViewing recommendations
What's worth checking in person before deciding.
- Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
- Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
- Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
- Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
- Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
- Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.
The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.