1822 Roselyn Street, Philadelphia
technical data · neighborhood and transit
Permits and code violations
1 permit not closed out. Unfinished permits pass to the next owner. 2 open violations.
- Electrical permit Jun 2026Completed
Installation of a 4.30kwdc solar pv system according to the 2017 nec and attached ez standard
- Plumbing permit Jul 2025Completed
Scope of work to include only piping from the curb line to the interior of the premises with 3/4 water line.
- Plumbing permit Sep 2023Completed
Replace 3/4" water distribution - emergency pwd help
- Residential building permit Mar 2023Completed
Ez permit standards alterations for alterations to an existing one family dwelling as per attached standard. deviations from this standard will result in permit revocation and require submission of construction plans. structural alteration or repair is expressly prohibited under this permit. prohibited structural work includes any modification to exterior walls, party walls, floor/roof framing or foundations, underpinning and excavations (i.e., digging in basement). any work/alterations to the basement/cellar are expressly prohibited unless documented as an existing habitable space with heights and means of egress per conditions of the ez standard. separate permits required for mechanical, electric and plumbing, etc. phdc workorder # 178095. stucco 400 sq ft of the back wall. replace basement stairs in existing opening in compliance with ez standards
- Electrical permit May 2022Completed
Install: 100 amp service and panel - 32 circuit capacity, 15 ampere duplex receptacle, arc fault circuit breakers, dryer circuit 30 amp, bedroom fixture, porcelain fixture, 10 year battery smoke alarms, new receptacle and circuit (20 amp), redistribute overloaded circuit, fishing wires per nec 2014
- Plumbing permit Apr 2022Completed
Curb trap, and fresh air inlet.
- Plumbing permit Mar 2022Completed
Repair curb trap fai
- Plumbing permit May 2020Completed
For exterior plumbing work to include curb trap and fresh air inlet as per 2018 philadelphia plumbing code.
- Plumbing permit Nov 2018Expired
Replace water service, main to meter... pa one call #2018-3130730
- Electrical permit Mar 2017Completed
100a service with 32- space panel. replace 8- switches, receptacle- 15/20a... in accordance with 2008 nec for a one family building
- Alteration permit Jan 2017Completed
Ez interior alterations. applicant agrees to limit the construction to comply with ez permit standard for interior alterations, dated january 2011.deviation from the standard will result in revocation of this permit and imposition of further penalties. licensed contractor to be listed on permit. separate permits required for plumbing, electric and hvac.call inspector at district office at least 24 hours prior to start
- Plumbing permit Jan 2017Completed
Installation of pvc drain pipe and copper supply lines for toilet, bathtub and sink
Philadelphia Department of Licenses and Inspections
Have you lived here? Share your experience.
Leave a reviewThe Address Story
Every address has a context. Read its story.
How much it costs to live here
Price, rent, mortgage, and the city's economic context, all in one place.
The money at this address
Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.
Enter a rent and the yield calculation fills in on its own.
Loan calculator for this address
Enter the listing price. The calculation uses only your numbers.
Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.
More on Roselyn Street
All addressesViewing recommendations
What's worth checking in person before deciding.
- Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
- Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
- Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
- Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
- Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
- Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.
The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.