Philadelphia

1524 Brown Street, Philadelphia

technical data · neighborhood and transit

Loading map…
1524 Brown Street, PhiladelphiaOpen map

Permits and code violations

8 permits not closed out. Unfinished permits pass to the next owner. 6 open violations.

  1. Electrical permit Nov 2025Completed

    Repair wiring in and out of the facade of the building from 1st to 3rd floor.

  2. Residential building permit Apr 2025Completed

    For the removal and replacement of the front facade wall and associated interior alterations. size and location per plans. separate permits required for any associated mechanical and electrical work. amend permit 10-9-2025 to include structural alterations to the front foundation wall and replacement of the front exterior stairs.

  3. Residential building permit Sep 2024Completed

    For the structural repair to exterior wall to partially resolve case #cf-2024-029004. a separate permit is required for any additional alterations that are not specifically addressed on case #cf-cf-2024-029004. ** special inspections required **

  4. Plumbing permit Jun 2024Completed

    Replacing plumbing fixtures for a single-family dwelling with 2ba; 2 water closets, 2 shower/tubs, 2 lavatories,

  5. Electrical permit May 2024Completed

    Partial rewire, install new light fixture, receptacels, and switches only

  6. Residential building permit Apr 2024Completed

    Interior alterations to 2 bathrooms. all work per application/plan. remodel 2 bathrooms, install new tiles on bathroom floor and shower walls in 2 bathrooms, replace the toilet and vanity, replace the fixtures in 2 bathrooms, install 1 exterior window per plan.

  7. Plumbing permit Apr 2024Completed

    For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall result in permit revocation. a separate permit from the philadelphia department of streets is required for any sidewalk and street closures. all means of pedestrian protection required at the site in accordance with the philadelphia building code chapter 33 shall be in place prior to start of work.

  8. Demolition permit Apr 2024Completed

    Sub demolition permit for cf-2024-028988. for the complete demolition of a sfd as part of the city of philadelphia demolition program. add'l specs: no sidewalk. (1) stucco c/w 731 n. 29th st. contractor to obtain storage locker for 30 days to store owners belongings. contractor to remove any belongings that can be done safely. contractor to save insurance plate on front of property for owner. install 6' high chain link fence across front of property.

  9. Plumbing permit Feb 2024Expired

    Replace lav, tub & wc. **without piping**

  10. Demolition permit Oct 2023Completed

    For the complete demolition of an existing masonry and wood three-story structure by hand methods. all permitted demolition activity to be in accordance with approved site safety demolition plan & such plan to be maintained on site at all times in accordance with philadelphia administrative code. complete sidewalk closure required as reflected on approved site plan and in accordance with section 3306 of the ibc. separate street closure permit required prior to start of work. any deviation will require an amended building permit.

  11. Demolition permit Sep 2023Completed

    For the complete demolition of the attached three-story structure by hand and hand hold devices. pedestrian protection to be in place prior to start of work and to be maintained during all demolition activities. *seperate streets department permit require for closure of right of way. *21 day posing and notice required per a-303.2 *a covered walkway or sidewalk closure shall be required within min. 9 feet of building facade in accordance with section 3306 of the ibc

  12. General permit minor Sep 2023Expired

    Ez wall protection permit- obtain permits for the application of exterior wall sidings for the purpose of finishing walls exposed during demolition (including party walls and independent bearing walls abutting party walls) without submitting plans by meeting the conditions and design limitations below. any deviations from this permit standard will result in permit revocation. (stucco) dp-2023-000946

Philadelphia Department of Licenses and Inspections

Safety and environment

Major airport

7.8 mi

Philadelphia International (PHL). Aircraft may be audible under approach paths.

FAA large-hub airports

Sunlight

How the sun hits 1524 Brown Street, Philadelphia

Have you lived here? Share your experience.

Leave a review

The Address Story

Every address has a context. Read its story.

Checking...

How much it costs to live here

Price, rent, mortgage, and the city's economic context, all in one place.

The money at this address

Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.

Estimated monthly rent–
Rent per square foot–
Rent per year–

Enter a rent and the yield calculation fills in on its own.

View sunlight on the mapThe report is free, with a Google account. The PDF also includes the QR code to the sunlight simulation.

Loan calculator for this address

Enter the listing price. The calculation uses only your numbers.

Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.

More on Brown Street

All addresses

Viewing recommendations

What's worth checking in person before deciding.

  • Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
  • Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
  • Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
  • Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
  • Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
  • Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.

Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.

The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.