Philadelphia

1306 Kerbaugh Street, Philadelphia

technical data · neighborhood and transit

Loading map…
1306 Kerbaugh Street, PhiladelphiaOpen map

Quick answers

Does 1306 Kerbaugh Street have open permits or code violations?
Philadelphia Department of Licenses and Inspections lists 18 permits, 5 not closed, and 60 violations, 4 open.
What is the 2026 conforming loan limit in Philadelphia County?
$832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
Is radon a problem here?
EPA radon zone 2, moderate potential.
What natural disasters is 1306 Kerbaugh Street at risk for?
FEMA's National Risk Index rates the area relatively low overall, with elevated heat wave risk.

Permits and code violations

5 permits not closed out. Unfinished permits pass to the next owner. 4 open violations.

  1. Mechanical / fuel gas permit Jul 2025Completed

    Ez permit ductwork & warm-air appliances - for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site plans. multi family - each hvac unit to be self-contained within each dwelling unit. no penetrations of rated assemblies. install (2) hvac systems, one in each dwelling. (2) outdoor condensers, 24k each. (6) mini split heads installed, 9k each head.

  2. Electrical permit Jun 2025Completed

    Full rewire of 2 units: lights, switches and receptacles. adding hardwired smoke detectors. 200 amp service feeding 2 units with 100 amp subpanels and house panel.

  3. Plumbing permit Jun 2025Completed

    Install piping for following 2 kitchens, 2 toilets, 2 lavatory, 2 tubs, 2 water heater, 2 washer box

  4. Residential building permit Jun 2025Completed

    For alterations to an existing attached structure used as a two-family dwelling as per building application/plans.

  5. Zoning permit Feb 2025Issued

    Residential - household living - two-family

  6. Plumbing permit Nov 2023Completed

    Replace drain lines, wc, vanity & tub.

  7. Residential building permit Oct 2023Expired

    Ez permit standards alterations for alterations to an existing one family dwelling as per attached standard. deviations from this standard will result in permit revocation and require submission of construction plans. structural alteration or repair is expressly prohibited under this permit. prohibited structural work includes any modification to exterior walls, party walls, floor/roof framing or foundations, underpinning and excavations (i.e., digging in basement). any work/alterations to the basement/cellar are expressly prohibited unless documented as an existing habitable space with heights and means of egress per conditions of the ez standard. separate permits required for mechanical, electric and plumbing, etc. *no basement alterations of any kind were proposed or approved for this permit* *no structural alterations of any kind were proposed or approved for this permit* remove gypsum wall board material to replace existing plumbing drain lines to second floor bathroom. replace gypsum wall board material after repairs approx. approx. 75 square feet.

  8. Electrical permit Oct 2023Completed

    Installation of solar array in accordance with signed standard.

  9. Electrical permit Aug 2023Expired

    Replace 100 amp service and panel as per nec 2017

  10. Zoning permit Sep 2022Issued

    Residential - household living - two-family

  11. Zoning permit Sep 2022Issued

    Residential - household living - two-family

  12. Plumbing permit Nov 2020Completed

    Interior replacement only of existing kitchen sink

Philadelphia Department of Licenses and Inspections

Safety and environment

FEMA natural hazard risk

Relatively Low

Highest for this area: heat wave. These drive insurance cost here.

FEMA National Risk Index, census tract

Leaking fuel tanks

5 within 1,650 ft

Nearest: Septa Luzerne Depot, 3900 N 10th St (1,500 ft), open. 2 still open. Ask whether groundwater or soil vapor testing was done.

EPA UST Finder, leaking underground storage tank releases

Toxic release facility

3,900 ft

Rexnord Corp Geared Prods Div and 4 more within a mile. Reports chemical releases to air, water or land to EPA each year.

EPA Toxics Release Inventory

High-voltage line

250 ft

230 kV line run by PECO ENERGY CO.

HIFLD transmission lines

Radon potential

Moderate

Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.

EPA and USGS Geologic Radon Potential Map

Wildfire risk

Very Low

Wildfire risk is low enough that standard home insurance usually covers it.

FEMA National Risk Index

Nearest public schools

1,200 ft

Multicultural Academy CS (1,200 ft), Mastery CS-Gratz Campus (2,150 ft), Mastery Prep Elementary CS (2,200 ft). Confirm the assigned school with the district.

U.S. Department of Education, NCES

Conforming loan limit 2026

$832,750

Philadelphia County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.

FHFA Conforming Loan Limit Values, one-unit

Sunlight

How the sun hits 1306 Kerbaugh Street, Philadelphia

Have you lived here? Share your experience.

Leave a review

The Address Story

Every address has a context. Read its story.

Checking...

How much it costs to live here

Price, rent, mortgage, and the city's economic context, all in one place.

The money at this address

Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.

Estimated monthly rent–
Rent per square foot–
Rent per year–

Enter a rent and the yield calculation fills in on its own.

View sunlight on the mapThe report is free, with a Google account. The PDF also includes the QR code to the sunlight simulation.

Loan calculator for this address

Enter the listing price. The calculation uses only your numbers.

Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.

More on Kerbaugh Street

All addresses

Viewing recommendations

What's worth checking in person before deciding.

  • Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
  • Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
  • Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
  • Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
  • Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
  • Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.

Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.

The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.