Philadelphia

124 Laurel Street, Philadelphia

technical data · neighborhood and transit

Loading map…
124 Laurel Street, PhiladelphiaOpen map

Quick answers

Does 124 Laurel Street have open permits or code violations?
Philadelphia Department of Licenses and Inspections lists 46 permits, 1 not closed, and 30 violations, 2 open.
What is the 2026 conforming loan limit in Philadelphia County?
$832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
Is radon a problem here?
EPA radon zone 2, moderate potential.
What natural disasters is 124 Laurel Street at risk for?
FEMA's National Risk Index rates the area relatively low overall, with elevated heat wave risk.

Permits and code violations

1 permit not closed out. Unfinished permits pass to the next owner. 2 open violations.

  1. Zoning permit Apr 2023Issued

    Limited lodging

  2. General permit minor May 2021Completed

    Front shingled roof: remove existing roofs down to wood decking. adhere ice and storm. nail base sheet to remainder of roof. shingle roof with a hd lifetime dimensional shingles.

  3. Mechanical permit Jun 2017Completed

    Install 2 hvac units with ductwork (sfd)

  4. Plumbing permit Jun 2017Completed

    3-water closet, 3-lav, 1-tub, 1-shower, 1-kitchen sink, 1-washer box the installation will comply with the philadelphia plumbing code 2004

  5. Electrical permit May 2017Completed

    Wire throughout- lights, switches, receptacles, tv, phone, interconnected smoke and c/o detectors and install 200a service, 30- circuits... in accordance with 2008 nec for a one family building

  6. Alteration permit Apr 2017Completed

    Renovation of existing property. reconfiguration of interior layout includes; staircase remove and replace, 2 full bathroom installation 1 1/2 bathroom interior reframing and drywall. installation of new utilities addition of backyard deck

  7. Zoning/use permit Apr 2017Completed

    For the erection of a rear deck at second floor

  8. Alteration permit Jan 2017Completed

    Exterior wall covering (stucco) and front window replacement in existing openings. sfd

  9. Demolition permit Dec 2016Completed

    Ez interior demolition- for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. deviations from this standard will result in permit revocation and require submission of construction plans.

  10. Plumbing permit Mar 2016Completed

    Install (2)1" domestic copper water services,5" lateral,main drain pa201606930736 (two family)self certification's are no longer permitted","all excavations and plumbing trenches in excess of 5 ft in depth must have approved shoring in place at the time of inspection"

  11. Electrical permit Feb 2016Completed

    Install 200 amp serv 3-meter 2-100 amp panels 1 60 amp panel. install 78 outlets install 40 switches as per code. install smoke detectors 120v battery backup throughout. as per nec 2008

  12. Mechanical permit Jan 2016Completed

    Install 92% 80,000 btu gas furnaces with 2 1/2 ton in basement, install 92% 60,000 btu gas furnace with 2 ton a/c with related duct work

Philadelphia Department of Licenses and Inspections

Safety and environment

FEMA natural hazard risk

Relatively Low

Highest for this area: heat wave. These drive insurance cost here.

FEMA National Risk Index, census tract

Superfund site

2.9 mi

Martin Aaron, Inc. (NPL Site). Check groundwater and vapor reports on the EPA site page.

EPA National Priorities List

Leaking fuel tanks

11 within 1,650 ft

Nearest: Former Dry Ice, 33-51 E Laurel St (850 ft), no further action. Every release here is closed by the state regulator.

EPA UST Finder, leaking underground storage tank releases

Brownfield site

1,300 ft

1019 27 N 3rd Street and 3 more within half a mile. Former industrial land in EPA's cleanup and reuse program.

EPA ACRES Brownfields

Toxic release facility

900 ft

Starkey Chemical Process Co and 4 more within a mile. Reports chemical releases to air, water or land to EPA each year.

EPA Toxics Release Inventory

High-voltage line

50 ft

138 kV line run by PECO ENERGY CO.

HIFLD transmission lines

Radon potential

Moderate

Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.

EPA and USGS Geologic Radon Potential Map

Nearest public schools

1,800 ft

Bodine William W HS (1,800 ft), Kearny Gen Philip Sch (2,800 ft), Young Scholars CS (2,950 ft). Confirm the assigned school with the district.

U.S. Department of Education, NCES

Major airport

8.4 mi

Philadelphia International (PHL). Aircraft may be audible under approach paths.

FAA large-hub airports

Conforming loan limit 2026

$832,750

Philadelphia County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.

FHFA Conforming Loan Limit Values, one-unit

Sunlight

How the sun hits 124 Laurel Street, Philadelphia

Have you lived here? Share your experience.

Leave a review

The Address Story

Every address has a context. Read its story.

Checking...

How much it costs to live here

Price, rent, mortgage, and the city's economic context, all in one place.

The money at this address

Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.

Estimated monthly rent–
Rent per square foot–
Rent per year–

Enter a rent and the yield calculation fills in on its own.

View sunlight on the mapThe report is free, with a Google account. The PDF also includes the QR code to the sunlight simulation.

Loan calculator for this address

Enter the listing price. The calculation uses only your numbers.

Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.

More on Laurel Street

All addresses

Viewing recommendations

What's worth checking in person before deciding.

  • Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
  • Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
  • Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
  • Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
  • Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
  • Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.

Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.

The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.