Quick answers
- Does 1237 Ellsworth Street have open permits or code violations?
- Philadelphia Department of Licenses and Inspections lists 60 permits, 16 not closed, and 29 violations, 5 open.
- What is the 2026 conforming loan limit in Philadelphia County?
- $832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
- Is radon a problem here?
- EPA radon zone 2, moderate potential.
- What natural disasters is 1237 Ellsworth Street at risk for?
- FEMA's National Risk Index rates the area relatively moderate overall, with elevated heat wave and cold wave risk.
Permits and code violations
16 permits not closed out. Unfinished permits pass to the next owner. 5 open violations.
- Mechanical / fuel gas permit Apr 2026Issued
Ez permit ductwork & warm-air appliances - for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site plans. new hvac system, ductwork, and 15 diffusers
- Electrical permit Mar 2026Issued
Install 200 amp electrical service, meter socket and circuit breaker panel with proper grounding and bonding. rewire house throughout and install lighting, switches and receptacle outlets. install 120 volts interconnected smoke and co alarms. all work to be done according to the 2017 nec
- Plumbing permit Feb 2026Issued
Installing 13 fixtures 1 hwh 4 toilets 4 shower/tubs 4 lavs
- Residential building permit Jan 2026Amendment ready for issue
For the erection of a third floor addition, to include a roof deck and pilot house, and for interior and exterior alterations to an existing attached single-family dwelling per plans. separate permits are required for all associated mechanical, electrical, and plumbing work. basement to remain non-habitable, to be used for storage and utilities only. amend permit 10/26/26 to document the change in roof insulation details per amended sheet a-001.
- Electrical permit Oct 2025Completed
Provide and install automatic fire alarm system throughout as per 2016 nfpa 72 and approved plans
- Electrical permit Jul 2025Completed
Install wiring, lighting, switches exit sign, emergency lighting and receptacles outlets. all work to be done according to the 2017 nec and per plans.
- Electrical permit Jun 2025Completed
Rough-in permit for ep-2025-003005 rough-in electric for new medical office according to drawings
- Mechanical / fuel gas permit May 2025Completed
Install new duct work and hvac system for first floor medical office as per approved plans.
- Plumbing permit May 2025Completed
Rough in plumbing for new medical office according to drawings.
- Plumbing permit May 2025Completed
Replace curb trap, main drain, fai
- General permit minor Apr 2025Completed
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall result in permit revocation. a separate permit from the philadelphia department of streets is required for any sidewalk and street closures. all means of pedestrian protection required at the site in accordance with the philadelphia building code chapter 33 shall be in place prior to start of work.
- Mechanical / fuel gas permit Mar 2025Issued
Ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site plans. install 2 hvac systems, 1 for the first floor + basement, 1 for the second floor + 3rd floor - first floor: 1.5 ton ac with 40k btu furnace - second floor:: 2ton ac with 40k btu furnace install all ductworks associated total registers/grilles 16
Philadelphia Department of Licenses and Inspections
Safety and environment
FEMA natural hazard risk
Relatively Moderate
Highest for this area: heat wave, cold wave. These drive insurance cost here.
FEMA National Risk Index, census tract
Superfund site
2.5 mi
Publicker Industries Inc. (Deleted NPL Site). Check groundwater and vapor reports on the EPA site page.
EPA National Priorities List
Leaking fuel tanks
12 within 1,650 ft
Nearest: 7 Eleven 40091, 1100 S 10th St & Washington St (1,250 ft), open. 1 still open. Ask whether groundwater or soil vapor testing was done.
EPA UST Finder, leaking underground storage tank releases
Radon potential
Moderate
Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.
EPA and USGS Geologic Radon Potential Map
Nearest public schools
750 ft
Fanny Jackson Coppin Sch (750 ft), Christopher Columbus CS (900 ft), Creative and Performing Arts (1,100 ft). Confirm the assigned school with the district.
U.S. Department of Education, NCES
Major airport
6.0 mi
Philadelphia International (PHL). Aircraft may be audible under approach paths.
FAA large-hub airports
Conforming loan limit 2026
$832,750
Philadelphia County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.
FHFA Conforming Loan Limit Values, one-unit
Have you lived here? Share your experience.
Leave a reviewThe Address Story
Every address has a context. Read its story.
How much it costs to live here
Price, rent, mortgage, and the city's economic context, all in one place.
The money at this address
Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.
Enter a rent and the yield calculation fills in on its own.
Loan calculator for this address
Enter the listing price. The calculation uses only your numbers.
Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.
More on Ellsworth Street
All addressesViewing recommendations
What's worth checking in person before deciding.
- Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
- Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
- Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
- Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
- Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
- Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.
The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.