1216 North 28th Street, Philadelphia
technical data · neighborhood and transit
Quick answers
- Does 1216 North 28th Street have open permits or code violations?
- Philadelphia Department of Licenses and Inspections lists 31 permits, 4 not closed, and 60 violations, 6 open.
- What is the 2026 conforming loan limit in Philadelphia County?
- $832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
- Is radon a problem here?
- EPA radon zone 2, moderate potential.
- What natural disasters is 1216 North 28th Street at risk for?
- FEMA's National Risk Index rates the area relatively moderate overall, with elevated heat wave and cold wave risk.
Permits and code violations
4 permits not closed out. Unfinished permits pass to the next owner. 6 open violations.
- Zoning permit May 2026Issued
Retail sales - convenience sales
- General permit minor Mar 2025Completed
Ez permit standards: chimney and vent extension: for residential type appliances for one- and two-family dwellings (three stories or less). obtain permits for existing chimney/vent extension alterations for low-heat or residential type uses without submitting plans by meeting the conditions and design limitations below. any deviations from this permit standard will result in permit revocation. (deviations will require submission of plans to the department.) for the extension of chimney, connecting to the existing chimney, 36” above the newly build roof deck of 1216 n 28th street (neighbors roof deck).
- Plumbing permit Nov 2024Completed
Plumbing of a new construction of a triplex. fixture with piping include 3 kitchens, 3 washers, 6 toilets, 6 shower/tub, 6 lavatories, 3 water heater, 1 sewer ejection pump, and 2 hose bibb, yard area drain. 5” sanitary sewer with curb trap and fair air intake, 6” stormwater sewer with curb trap and fresh air intake, and 1” domestic water line. 31 fixtures amendment dated november 12, 2024, value engineering effort to reduce building drain line to 4. house trap and sewer laterals shall be sized and installed as per the approved pwd utility plan.
- Mechanical / fuel gas permit Oct 2024Completed
For the installation of registers, diffusers, and appliances with associated ductwork. appliances to be installed in accordance with the manufacturer’s specifications. for use as previously approved. all work to be done per approved plans. if field conditions vary contact design engineer prior to the start of any work. separate permits to be obtained for all other work.
- Electrical permit Oct 2024Completed
Install a 400 amp service, (4) gang meter bank, (3) 150 amp panels & feeders, (1) 100 amp panel & feeder. install wiring throughout the common areas & three dwelling units. install lights normal & emergency, switches, sensors, receptacles & smoke alarms. provide power for the mechanical & hvac equipment. install a new fire alarm system throughout. all work in accordance with the 2017 nec.
- Fire suppression permit Sep 2024Completed
Install new fire suppression system complying with nfpa 13r throughout the building to include 2" main fire service line with a 2" wilkins 950xlt2 backflow prevention assembly as per approved plans. all work shall be performed by a fire suppression contractor licensed by the city of philadelphia.
- Commercial building permit Jul 2024Completed
For the erection of an attached 3-story structure with roof access structure for access to an occupiable roof deck. structure for use as multi-family household living three (3) dwelling units. building is fully sprinklered in accordance with nfpa 13r. all work to be done per approved plans. if field conditions vary contact design engineer prior to the start of any work. **a covered walkway or sidewalk closure shall be required within 9 feet of the building facade in accordance with section 3306 of the 2018 ibc. separate building and/or streets department permit required prior to the start of any work. ** separate permiits to be obtained for all other work. *** continuous special inspections required during site excavation & underpinning - see sp-2024-000197 for excavation permit work *** ****amendment (9-3-2024): to remove underpinning requirements based on field conditons and as noted in the approved construction amendment documents ****
- Site / utility permit Apr 2024Completed
For excavation work as per approved plans. **no underpinning of this permit.**
- Zoning permit Feb 2024Completed
For the erection of an attached structure with a cellar and a roof deck with a roof access structure. size and location as shown on plans.
- Demolition permit Jul 2022Completed
**make safe permit** for the complete demolition of the existing three (3) story masonry structure to comply with violation case #cf-2022-025077. all permitted demolition activity to be done in accordance with site safety demolition plan and such plan to be maintained on site at all times. demolition to be done by hand and with hand tools only. protection of pedestrians, public right-of-way, and adjacent properties to be in place prior to start of work. separate streets department approval required for right-of-way encroachment or closure. 21 day posting & notice waived per a-303.2.
- Zoning permit May 2022Issued
For the complete demolition of the existing structure.
- Plumbing permit Apr 2022Completed
For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall result in permit revocation. a separate permit from the philadelphia department of streets is required for any sidewalk and street closures. all means of pedestrian protection required at the site in accordance with the philadelphia building code chapter 33 shall be in place prior to start of work.
Philadelphia Department of Licenses and Inspections
Safety and environment
FEMA natural hazard risk
Relatively Moderate
Highest for this area: heat wave, cold wave. These drive insurance cost here.
FEMA National Risk Index, census tract
Leaking fuel tanks
3 within 1,650 ft
Nearest: Fire Site 043, 1301 N 28th St (500 ft), no further action. Every release here is closed by the state regulator.
EPA UST Finder, leaking underground storage tank releases
High-voltage line
100 ft
138 kV line run by PECO ENERGY CO.
HIFLD transmission lines
Radon potential
Moderate
Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.
EPA and USGS Geologic Radon Potential Map
Nearest public schools
900 ft
Morris Robert Sch (900 ft), Kelley William D Sch (2,050 ft), Vaux HS: A Big Picture School (2,200 ft). Confirm the assigned school with the district.
U.S. Department of Education, NCES
Major airport
7.7 mi
Philadelphia International (PHL). Aircraft may be audible under approach paths.
FAA large-hub airports
Conforming loan limit 2026
$832,750
Philadelphia County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.
FHFA Conforming Loan Limit Values, one-unit
Have you lived here? Share your experience.
Leave a reviewThe Address Story
Every address has a context. Read its story.
How much it costs to live here
Price, rent, mortgage, and the city's economic context, all in one place.
The money at this address
Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.
Enter a rent and the yield calculation fills in on its own.
Loan calculator for this address
Enter the listing price. The calculation uses only your numbers.
Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.
More on North 28th Street
All addressesViewing recommendations
What's worth checking in person before deciding.
- Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
- Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
- Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
- Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
- Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
- Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.
The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.