Philadelphia

1122 Earl Street, Philadelphia

technical data · neighborhood and transit

Loading map…
1122 Earl Street, PhiladelphiaOpen map

Quick answers

Does 1122 Earl Street have open permits or code violations?
Philadelphia Department of Licenses and Inspections lists 19 permits, all closed, and 22 violations, 1 open.
What is the 2026 conforming loan limit in Philadelphia County?
$832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
Is radon a problem here?
EPA radon zone 2, moderate potential.
What natural disasters is 1122 Earl Street at risk for?
FEMA's National Risk Index rates the area very low overall, with elevated heat wave risk.

Permits and code violations

Every permit on file is closed out. 1 open violation.

  1. Mechanical / fuel gas permit Feb 2022Completed

    Ez permit ductwork & warm-air appliances- for the installation if new ductwork, registers/grilles/diffusers, and warm-air appliances as per attached standards. deviations from these standards require submission of construction and site plans.

  2. Electrical permit Jan 2022Completed

    Ezelec - new 200amp service electrical wiring/devices throughout as per 2014 nec. electrical permit for combo rp-2020-015503.

  3. Plumbing permit Nov 2021Completed

    Exterior plumbing curb trap, fai and house drain, 1 inch water service interior plumbing 3 wc,3 tubs,3 lavatories, 1 ks,1 ll,1wh

  4. Fire suppression permit Oct 2021Completed

    Install new fire suppression system and 1" combined service in accordance with nfpa 13d throughout the entire building. all work shall comply with the approved plans. all work shall be performed by a fire suppression contractor licensed by the city of philadelphia.

  5. Residential building permit May 2021Completed

    For the erection of a three (3) story structure of type vb construction for use as a single-family dwelling (group r-3 use & occupancy classification) with roof deck and garage containing two (2) accessory parking spaces. building to be fully sprinklered with a minimum of a nfpa 13d automatic sprinkler system. all work to be done per approved plans and in accordance with 2015 irc. separate permits required for mechanical, electrical, plumbing, and fire suppression work. prior to issuance of c.o., submittal of air barrier checklist and envelope testing certificate is required. both to be completed by an approved party. **egress from property provided via easement per legal agreement with 1133-39 e columbia ave.** [amendment approved 7/14/2021 to include underpinning as per approved amended structural plans and updated special inspections forms.] [amendment approved 7/11/2022 for a change to the design professional in responsible charge of special inspections (dprc-si) as per amended special inspections forms.]

  6. Zoning permit Feb 2021Completed

    The application is for the erection of a three story attached structure with a partial basement, roof deck with roof access structure, and interior accessory parking accessed by a curb cut on the primary street. size and location per plans

  7. Demolition permit Apr 2018Completed

    Complete demolition of existing building by hand. all permitted demolition activity to be in accordance with approved site safety demolition plan & such plan to be maintained on site at all times. full sidewalk closure required as reflected on approved site plan and in accordance with section 3306 of the ibc. separate street closure permit required prior to start of work.

  8. Zoning/use permit Apr 2018Closed

    Demolish existing 3 story kbuilding in its entirety

  9. Plumbing permit Mar 2018Completed

    "seal lateral" - abandoned laterals shall have the house trap removed and the pipe shall be hermetically sealed by a cap or plug at the curb line "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection". opening pmt #201802759.

  10. Administrative permit Jan 2018Completed

    Amended building permit ap# 789699. remove rear egress window well at basement level. required egress window, and escape well to be located at footway, front of structure.

  11. Plumbing permit Sep 2017Completed

    Install a new 5" lateral,curb trap,fai,1" rfss.water and sanitary lines throughout 4 wc,4 lavs,3 tubs/showers,1ks,1 wm and hwh pa20172650283(sfd)the installation will comply with the philadelphia plumbing code 2004 "self-certification's are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection

  12. Electrical permit Sep 2017Completed

    New construction: wire property, lights, switches, receptacles, tv, phone, interconnected smoke and c/o detectors. install 200a service- 40- circuits as per nec 2008 south district

Philadelphia Department of Licenses and Inspections

Safety and environment

FEMA natural hazard risk

Very Low

Highest for this area: heat wave. These drive insurance cost here.

FEMA National Risk Index, census tract

Superfund site

2.6 mi

Franklin Slag Pile (MDC) (NPL Site). Check groundwater and vapor reports on the EPA site page.

EPA National Priorities List

Leaking fuel tanks

5 within 1,650 ft

Nearest: Peco Energy Co, Delaware & Palmer Ave (800 ft), no further action. Every release here is closed by the state regulator.

EPA UST Finder, leaking underground storage tank releases

Brownfield site

950 ft

233 East Girard Avenue G3tbny00 and 1 more within half a mile. Former industrial land in EPA's cleanup and reuse program.

EPA ACRES Brownfields

Toxic release facility

1,050 ft

Exelon Corp Delaware Generating Station and 4 more within a mile. Reports chemical releases to air, water or land to EPA each year.

EPA Toxics Release Inventory

High-voltage line

750 ft

138 kV line run by PECO ENERGY CO.

HIFLD transmission lines

Radon potential

Moderate

Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.

EPA and USGS Geologic Radon Potential Map

Nearest public schools

850 ft

Adaire Alexander Sch (850 ft), Penn Treaty Sch (1,200 ft), Moffet John Sch (2,600 ft). Confirm the assigned school with the district.

U.S. Department of Education, NCES

Major airport

9.0 mi

Philadelphia International (PHL). Aircraft may be audible under approach paths.

FAA large-hub airports

Conforming loan limit 2026

$832,750

Philadelphia County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.

FHFA Conforming Loan Limit Values, one-unit

Sunlight

How the sun hits 1122 Earl Street, Philadelphia

Have you lived here? Share your experience.

Leave a review

The Address Story

Every address has a context. Read its story.

Checking...

How much it costs to live here

Price, rent, mortgage, and the city's economic context, all in one place.

The money at this address

Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.

Estimated monthly rent–
Rent per square foot–
Rent per year–

Enter a rent and the yield calculation fills in on its own.

View sunlight on the mapThe report is free, with a Google account. The PDF also includes the QR code to the sunlight simulation.

Loan calculator for this address

Enter the listing price. The calculation uses only your numbers.

Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.

More on Earl Street

All addresses

Viewing recommendations

What's worth checking in person before deciding.

  • Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
  • Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
  • Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
  • Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
  • Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
  • Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.

Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.

The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.