Quick answers

Does 1111 Hope Street have open permits or code violations?
Philadelphia Department of Licenses and Inspections lists 60 permits, 2 not closed, and 18 violations, 9 open.
What is the 2026 conforming loan limit in Philadelphia County?
$832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
Is radon a problem here?
EPA radon zone 2, moderate potential.
What natural disasters is 1111 Hope Street at risk for?
FEMA's National Risk Index rates the area relatively low overall, with elevated heat wave risk.

Permits and code violations

2 permits not closed out. Unfinished permits pass to the next owner. 9 open violations.

  1. Residential building permit Sep 2026Completed

    - for alterations to an existing one family dwelling as per attached standard. deviations from this standard will result in permit revocation and require submission of construction plans. separate permits are required for plumbing and electrical work and the installation of heating/cooling appliances. structural alteration or repair is expressly prohibited under this permit. prohibited structural work includes any modification to exterior walls, party walls, floor/roof framing or foundations; including underpinning, excavation, and removal of foundation slab. ***no work may be performed in the basement or cellar.*** separate permits required for mechanical, electrical, and plumbing work

  2. Electrical permit May 2026Completed

    Add new 5 new dedicated lines for kitchen refrigerator, mw, dw, hood, and gfci

  3. Residential building permit Apr 2026Completed

    - for alterations to an existing one family dwelling as per attached standard. deviations from this standard will result in permit revocation and require submission of construction plans. separate permits are required for plumbing and electrical work and the installation of heating/cooling appliances. structural alteration or repair is expressly prohibited under this permit. prohibited structural work includes any modification to exterior walls, party walls, floor/roof framing or foundations; including underpinning, excavation, and removal of foundation slab. ***no work may be performed in the basement or cellar.*** separate permits required for mechanical, electrical, and plumbing work

  4. Electrical permit Feb 2024Completed

    Install a 1,000 amp 120/208v /3 phase service & house panels, (3) 600 amp 120/208v /3 phase services, meter banks, panels & feeders. install the fire pump service. install a 30kw generator, (2) ats & generator cam lock tap box. provide wirinig for the common areas, amenities, & (49) dwelling units. provide power for the mechanical, hvac & elevator equipment. all work in accordance with the 2017 nec.

  5. Electrical permit Oct 2023Completed

    Rough-in permit for ep-2023-009677 install new service, rough and trim for units and rest of building including, receptacles, switches/disconnects, panels, lighting and some detectors as required by nec

  6. Mechanical / fuel gas permit Sep 2023Completed

    For the installation of registers, diffusers and appliances with associated ductwork. appliances to be installed in accordance with manufacturer's specifications. all work to be done per approved plans. ** if field conditions vary contact design engineer prior to the start of any work. ** separate permits required for all other work.**

  7. General permit minor Jun 2023Completed

    For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall result in permit revocation. a separate permit from the philadelphia department of streets is required for any sidewalk and street closures. all means of pedestrian protection required at the site in accordance with the philadelphia building code chapter 33 shall be in place prior to start of work.

  8. Fire suppression permit Feb 2023Completed

    Install new fire suppression system complying with nfpa 13 throughout the building to include 6" main fire service line with a 6" wilkins 350a backflow prevention assembly, peerless 4aef10g ul listed fire pump complying with nfpa 20 and two (2) standpipe risers complying with nfpa 14 as per approved plans. all work shall be performed by a fire suppression contractor licensed by the city of philadelphia.

  9. Plumbing permit Oct 2022Completed

    All new plumbing water lines. drain lines and plumbing fixtures

  10. Zoning permit Aug 2022Completed

    For the erection of a semi-detached structure with a roof deck and a roof access structure (size and location as shown on plans/application).

  11. Electrical permit Aug 2022Completed

    Provide (1) 200a, 240/120v, single-phase service for temporary job trailer as per 2017 nec

  12. Commercial building permit Oct 2021Completed

    For the erection of a seven (7) story attached structure (2 floors of type ia construction and 5 floors of type iiia) as per approved plans. for use as one (1) vacant commercial and forty-seven (47) dwelling units. structure to be fully sprinklered in accordance with nfpa 13. **separate permits required for mep and fire suppression work.** amendment 9/28 to remove one story, layout changes and increase dwelling units to 49 units.

Philadelphia Department of Licenses and Inspections

Safety and environment

FEMA natural hazard risk

Relatively Low

Highest for this area: heat wave. These drive insurance cost here.

FEMA National Risk Index, census tract

Leaking fuel tanks

5 within 1,650 ft

Nearest: Select Beverage Co, 1342 N Howard St (1,300 ft), open. 1 still open. Ask whether groundwater or soil vapor testing was done.

EPA UST Finder, leaking underground storage tank releases

Brownfield site

1,350 ft

233 East Girard Avenue G3tbny00 and 13 more within half a mile. Former industrial land in EPA's cleanup and reuse program.

EPA ACRES Brownfields

Toxic release facility

1,650 ft

Starkey Chemical Process Co and 2 more within a mile. Reports chemical releases to air, water or land to EPA each year.

EPA Toxics Release Inventory

High-voltage line

800 ft

138 kV line run by PECO ENERGY CO.

HIFLD transmission lines

Radon potential

Moderate

Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.

EPA and USGS Geologic Radon Potential Map

Nearest public schools

1,750 ft

Bodine William W HS (1,750 ft), Adaire Alexander Sch (2,500 ft), Moffet John Sch (2,600 ft). Confirm the assigned school with the district.

U.S. Department of Education, NCES

Major airport

8.6 mi

Philadelphia International (PHL). Aircraft may be audible under approach paths.

FAA large-hub airports

Conforming loan limit 2026

$832,750

Philadelphia County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.

FHFA Conforming Loan Limit Values, one-unit

Sunlight

How the sun hits 1111 Hope Street, Philadelphia

Have you lived here? Share your experience.

Leave a review

The Address Story

Every address has a context. Read its story.

Checking...

How much it costs to live here

Price, rent, mortgage, and the city's economic context, all in one place.

The money at this address

Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.

Estimated monthly rent–
Rent per square foot–
Rent per year–

Enter a rent and the yield calculation fills in on its own.

View sunlight on the mapThe report is free, with a Google account. The PDF also includes the QR code to the sunlight simulation.

Loan calculator for this address

Enter the listing price. The calculation uses only your numbers.

Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.

More on Hope Street

All addresses

Viewing recommendations

What's worth checking in person before deciding.

  • Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
  • Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
  • Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
  • Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
  • Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
  • Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.

Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.

The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.