Philadelphia

1110 Chestnut Street, Philadelphia

Retail space

technical data · neighborhood and transit

Loading map…
1110 Chestnut Street, PhiladelphiaOpen map

Permits and code violations

10 permits not closed out. Unfinished permits pass to the next owner. 6 open violations.

  1. Electrical permit Sep 2026Issued

    Main electrical panel: install 1 main panel in the basement, distributing power to sub-panels on each floor. wiring: run copper wiring from the main panel to sub-panels and outlets. install dedicated circuits for hvac units and appliances. lighting: install recessed lights, pendant fixtures, and wall-mounted lights as per the lighting schedule. provide switches for each fixture. outlets: install general outlets and dedicated appliance outlets in each unit, with gfci outlets in kitchens and bathrooms. grounding: ensure proper grounding for the entire system as per code. safety devices: install hard-wired smoke detectors and co detectors in each unit.-2017 nec. all work to be done according to the 2017 nec and per approved plans. (the fire alarm system is not included in the scope of work.) amendment: add on to pre-existing fire alarm for submitted plans.

  2. Plumbing permit Jul 2026Issued

    Alterations to floors 2-6 to create dwellings. all work below second floor in commercial space is exisitng to remain. piping located in commercial space shall be metallic. enting serving commericla space if installed i required to be metallic to roof extention. venting to be designed and installed in accordance with section 919 philadelphia single stack vent system. all work to be installed in strict compliance with 2018 ppc and approved plans

  3. Fire suppression permit Jun 2026Issued

    Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standards. deviations from these standards require submission of construction and site plans. relocate 18 sprinkler heads

  4. Mechanical / fuel gas permit Jun 2026Issued

    For the installation of registers, diffusers, and appliances with associated ductwork. appliances to be installed in accordance with the manufacturer’s specifications. for use as previously approved. all work to be done per approved plans. if field conditions vary contact design engineer prior to the start of any work. separate permits to be obtained for all other work.

  5. Commercial building permit Apr 2026Issued

    Level iii alterations to include roof deck additions with partial change of occupancy to create ten (10) dwelling units on the second through fifth floors of an existing building as per approved plans and bbs variance no. mi-2026-000233 (sprinkler heads over rear windows required per bbs variance). building to be fully sprinklered per nfpa 13 and include standpipes per nfpa 14. *2018 iebc review* **separate permits required for mep & fire suppression work**

  6. Zoning permit Feb 2026Issued

    For the conversion of an existing roof deck for residential use above the three-story portion, and for the conversion of an existing stair tower to three (3) decks (for residential use only) accessed from the rear of the 3rd, 4th, and 5th floors of an existing multi-family (10 dwelling units) structure. size and location as shown on the application/plan.

  7. Zoning permit Nov 2025Issued

    Residential - household living - multi-family

  8. Administrative permit Sep 2025Completed

    For the issuance of a certificate of occupancy for the retail sales of consumer goods at the ground floor area of an existing structure. **no work approved on this permit**

  9. Zoning permit Aug 2025Issued

    Retail sales - food, beverages, and groceries; retail sales - consumer goods

  10. Plumbing permit Aug 2025Completed

    Install waste and drain piping for restarurant on first floor per plans as follows , 2 water closets , 2 lavs 1 mop sink , 3 bay sink , 1 prep sink ,2 hand wash sinks,1 grease trap , 1 grinder sink , 1 hot water heater ************* amendment moving fixture locations in prep area ********************************************************

  11. Electrical permit Jun 2025Completed

    Install fire alarm system throughout as per 2016 nfpa 72.

  12. Electrical permit Jun 2025Completed

    Rough-in permit for ep-2025-005394 install fire alarm system throughout.

Philadelphia Department of Licenses and Inspections

Safety and environment

Major airport

6.9 mi

Philadelphia International (PHL). Aircraft may be audible under approach paths.

FAA large-hub airports

Sunlight

How the sun hits 1110 Chestnut Street, Philadelphia

Building typeRetail space

Shopped or worked here? Share your experience.

Leave a review

The Address Story

Every address has a context. Read its story.

Checking...

How much it costs to live here

Price, rent, mortgage, and the city's economic context, all in one place.

The money at this address

Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.

Estimated monthly rent–
Rent per square foot–
Rent per year–

Enter a rent and the yield calculation fills in on its own.

View sunlight on the mapThe report is free, with a Google account. The PDF also includes the QR code to the sunlight simulation.

Loan calculator for this address

Enter the listing price. The calculation uses only your numbers.

Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.

More on Chestnut Street

All addresses

Viewing recommendations

What's worth checking in person before deciding.

  • The building has commercial space on the ground floor. Ask about their hours, check where the ventilation or refrigeration units are, and what time deliveries happen in the morning.
  • Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
  • Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
  • Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
  • Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
  • Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.
  • Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.

Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.