Philadelphia

1050 Roy Street, Philadelphia

technical data · neighborhood and transit

Loading map…
1050 Roy Street, PhiladelphiaOpen map

Quick answers

Does 1050 Roy Street have open permits or code violations?
Philadelphia Department of Licenses and Inspections lists 13 permits, 4 not closed, and 34 violations, 3 open.
What is the 2026 conforming loan limit in Philadelphia County?
$832,750 for a single-unit home, per FHFA. Larger loans are jumbo loans.
Is radon a problem here?
EPA radon zone 2, moderate potential.
What natural disasters is 1050 Roy Street at risk for?
FEMA's National Risk Index rates the area relatively moderate overall, with elevated heat wave and cold wave risk.

Permits and code violations

4 permits not closed out. Unfinished permits pass to the next owner. 3 open violations.

  1. Zoning permit Jul 2026Issued

    Assembly and entertainment - nightclubs and public entertainment venues

  2. Electrical permit Jan 2024Expired

    Installation of solar array in accordance with signed standard.

  3. General permit minor Jan 2024Expired

    For minor construction work at the subject property in accordance with all applicable provisions of the philadelphia code, all references codes and standards, and the attached ez standard, where included. deviation from this standard shall result in permit revocation. a separate permit from the philadelphia department of streets is required for any sidewalk and street closures. all means of pedestrian protection required at the site in accordance with the philadelphia building code chapter 33 shall be in place prior to start of work.

  4. Administrative permit Sep 2023Completed

    For a certificate of occupancy for a club with an occupant load less than 50. layout as shown on plans.

  5. Zoning permit May 2023Issued

    Assembly and entertainment - nightclubs and private clubs

  6. Plumbing permit Apr 2018Completed

    Supply & install new curb trap, lateral & main drain. replace water service with 3/4" copper as per philadelphia 2004 plumbing code.

  7. Alteration permit Sep 2017Completed

    Make safe permit - permit application in response to unsafe violations #597846. to comply violation, completed work is to be inspected and approved as an appropriate repair to each violation. no engineer's report submitted. licensed contractor to assume responsibility of work. one story detached garage masonry wall. replace crack area, saw cut wall. tie wall back into existing walls. make wall level & plumb, no change in size.

  8. Alteration permit Aug 2017Completed

    Make safe permit - permit application in response to unsafe violations #597846. to comply violation, completed work is to be inspected and approved as an appropriate repair to each violation. no engineer's report submitted. licensed contractor to assume responsibility of work. one story detached garage masonry wall. repalce crack area, saw cut wall. tie wall back into existing walls. make wall level & plumb, no change in size. * permit received from downstairs*

  9. Alteration permit Sep 2007Completed

    Re-cover 16 sq. ft of main roof & recover side bay w/ rubber

  10. Alteration permit Sep 2007Completed

    Stucco 3 walls owners ph # 215 787 8403

  11. Electrical permit Aug 2007Completed

    200 amp service - rewire. (north dist)

  12. Plumbing permit Apr 2007Completed

    Replace curb trap, digging on westmorland in back of property

Philadelphia Department of Licenses and Inspections

Safety and environment

FEMA natural hazard risk

Relatively Moderate

Highest for this area: heat wave, cold wave. These drive insurance cost here.

FEMA National Risk Index, census tract

Leaking fuel tanks

1 within 1,650 ft

Nearest: Allegheny Oil, 1000 W Sedgley Ave (450 ft), open. 1 still open. Ask whether groundwater or soil vapor testing was done.

EPA UST Finder, leaking underground storage tank releases

Brownfield site

2,350 ft

1846 West Sedgley Avenue. Former industrial land in EPA's cleanup and reuse program.

EPA ACRES Brownfields

Toxic release facility

150 ft

Accurate Electro Plating Inc and 2 more within a mile. Reports chemical releases to air, water or land to EPA each year.

EPA Toxics Release Inventory

High-voltage line

700 ft

230 kV line run by PECO ENERGY CO.

HIFLD transmission lines

Radon potential

Moderate

Average indoor levels of 2 to 4 pCi/L. EPA still suggests testing ground-floor and basement units.

EPA and USGS Geologic Radon Potential Map

Nearest public schools

550 ft

Bethune Mary McLeod Sch (550 ft), Laboratory CS (550 ft), Kenderton El Sch (2,300 ft). Confirm the assigned school with the district.

U.S. Department of Education, NCES

Conforming loan limit 2026

$832,750

Philadelphia County. Mortgages up to this amount qualify for Fannie Mae and Freddie Mac pricing. Above it, the loan is a jumbo with stricter terms.

FHFA Conforming Loan Limit Values, one-unit

Sunlight

How the sun hits 1050 Roy Street, Philadelphia

Have you lived here? Share your experience.

Leave a review

The Address Story

Every address has a context. Read its story.

Checking...

How much it costs to live here

Price, rent, mortgage, and the city's economic context, all in one place.

The money at this address

Renting, buying, and investing, on the same numbers. Enter the listing price to see all calculations.

Estimated monthly rent–
Rent per square foot–
Rent per year–

Enter a rent and the yield calculation fills in on its own.

View sunlight on the mapThe report is free, with a Google account. The PDF also includes the QR code to the sunlight simulation.

Loan calculator for this address

Enter the listing price. The calculation uses only your numbers.

Rough estimate, with a fixed rate. The bank's offer may include fees and insurance.

More on Roy Street

All addresses

Viewing recommendations

What's worth checking in person before deciding.

  • Test water pressure and temperature at the tap, in the bathroom and kitchen, for at least a minute.
  • Schedule a viewing on a weekday too, between 6:00 and 7:30 PM, the window when the building is busiest: neighbors, parking, elevator.
  • Knock on a neighboring door and ask two things: what bothers them most often, and what work is planned for the building.
  • Look at the stairwell (cleanliness, smell) and the association's notice board: unpaid dues, conflicts, recent decisions.
  • Ask specifically where you'd park: is there paid city parking, who currently holds it, what the permit costs, and how long the waitlist is.
  • Ask for the latest maintenance bill from a winter month, not a summer one: that's where the real cost of living there shows up.

Neighborhood recommendations are derived from public OpenStreetMap data and may be incomplete. Checking in person is still what matters most.

The year built, height regime, structure, and elevator for this address are being indexed right now, city by city. Save the page and check back: it fills in over time. If you live here, you can fill it in yourself in a minute by leaving a review.